View the PDF version Google Docs PDF Viewer
CITY OF MUSKEGON CITY COMMISSION MEETING MARCH 24, 2009 CITY COMMISSION CHAMBERS @ 5:30 P.M. AGENDA CALL TO ORDER: PRAYER: PLEDGE OF ALLEGIANCE: ROLL CALL: HONORS AND AWARDS: INTRODUCTIONS/PRESENTATION: CONSENT AGENDA: A. Approval of Minutes. CITY CLERK B. Traffic Department Materials and Services 2009. PUBLIC WORKS C. Aggregates, Highway Maintenance Materials and Concrete. PUBLIC WORKS D. Budgeted Vehicle Replacement – Two Ford F-450s. PUBLIC WORKS E. Budgeted Vehicle Replacement – One Ford F-350 and Two Ford F-350 4X4. PUBLIC WORKS F. Request to Apply for a Grant for McGraft Park Building. CITY CLERK G. Resolution Regarding Spending of Stimulus Funds. CITY MANAGER H. Clearwell Valve Replacement. WATER FILTRATION I. Maintenance Agreement/Rite-Way Plumbing and Heating. PUBLIC SAFETY J. Purchase of 519 Orchard and 525 Orchard. COMMUNITY & NEIGHBORHOOD SERVICES K. Sanitary Pump Station at Hartshorn Marina. PUBLIC WORKS/MARINA PUBLIC HEARINGS: COMMUNICATIONS: CITY MANAGER’S REPORT: UNFINISHED BUSINESS: A. Padlock Ordinance – 287 McLaughlin. CITY MANAGER B. Recommendation for Annual Renewal of Liquor Licenses – Cuti’s Sports Bar & Grill, Muskegon Recreational Club, and City Café. CITY CLERK C. Recommendation for Denial of Liquor License Renewal for H&J Dollar. CITY CLERK NEW BUSINESS: A. 2009-2010 CDBG/HOME Partnership Program Allocations. COMMUNITY & NEIGHBORHOOD SERVICES B. Approval of Loan in the Amount of $30,000 to Great Lakes Die Cast. PLANNING & ECONOMIC DEVELOPMENT C. Request to Revoke the Obsolete Property Rehabilitation Exemption Certificate at 585 W. Clay. PLANNING & ECONOMIC DEVELOPMENT D. Consideration of Bids for Merrill Avenue, Seventh to Sixth. ENGINEERING E. Concurrence with the Housing Board of Appeals Notice and Order to Demolish the Following: PUBLIC SAFETY 1035 Pine St. (Area 11b) 521 Leonard Ave. (Area 11) 312 Cross Ave. – Garage (Area 11) 724 E. Isabella Ave. (Area 11) 642 McLaughlin Ave. – Home and Garage 1505 Lakeshore Dr. – Garage F. Presentation by Kathy Evans – Proposed Shoreline Habitat Restoration and Public Access Improvements Projects. ANY OTHER BUSINESS: PUBLIC PARTICIPATION: Reminder: Individuals who would like to address the City Commission shall do the following: Fill out a request to speak form attached to the agenda or located in the back of the room. Submit the form to the City Clerk. Be recognized by the Chair. Step forward to the microphone. State name and address. Limit of 3 minutes to address the Commission. (Speaker representing a group may be allowed 10 minutes if previously registered with City Clerk.) CLOSED SESSION: ADJOURNMENT: ADA POLICY: The City of Muskegon will provide necessary auxiliary aids and services to individuals who want to attend the meeting upon twenty four hour notice to the City of Muskegon. Please contact Ann Marie Becker, City Clerk, 933 Terrace Street, Muskegon, MI 49440 or by calling (231) 724-6705 or TDD: (231) 724-4172. Date: March 24, 2009 To: Honorable Mayor and City Commissioners From: Ann Marie Becker, City Clerk RE: Approval of Minutes SUMMARY OF REQUEST: To approve minutes for the March 9th Commission Worksession, and the March 10th Regular Commission Meeting. FINANCIAL IMPACT: None. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: Approval of the minutes. City of Muskegon City Commission Worksession March 9, 2009 City Commission Chambers 5:30 PM MINUTES 2009-20 Present: Commissioners Warmington, Wierengo, Shepherd, Wisneski, Gawron, Carter, and Spataro. Absent: None. Muskegon Public School Bond Issue. Colin Armstrong Colin Armstrong presented a proposal in which Muskegon Public Schools is asking for a 5.7 mill for a bond proposal to purchase computers, upkeep on the school buildings, as well as other improvements. A special election will be held on May 5, 2009. Muskegon Summer Celebration Payment Plan Request. City Manager Joe Austin and Tim Achterhof presented a letter requesting approval of a payment plan for Muskegon Summer Celebration indicating even though ticket sales were large last year, artists’ fees have increased dramatically. Bryon Mazade disclosed that he is chairman of the Muskegon Summer Celebration board. Mayor Warmington disclosed that he is chairman of Muskegon Bike Time board and find they are in a similar position. Moved by Commissioner Shepherd, supported by Commissioner Spataro to approve Muskegon Summer Celebration’s request for a payment plan of city fees incurred in 2008 that will include a $20,000 payment by June 1, 2009 and the remainder of the balance by September 30, 2009. ROLL CALL VOTE: Ayes: Wisneski, Carter, Gawron, Shepherd, Spataro, Warmington, and Wierengo. Nays: None. MOTION PASSES. Charter Amendments. City Manager City Commissioners have been asked to consider possible charter amendments. A list of possible charter changes are as follows: Changes in the city’s fiscal year to align with the federal, state, and county fiscal years. Change from winter to summer tax collections. Eliminate the August Primary for City Commissioners. Modify or eliminate the city’s civil service system. A reduction in the number of days that the Board of Review holds session to better align with the session of other local units. A release of certain properties from the “Charter Park” restriction. Commissioners asked that a plan be presented that would take the place of the current civil service system if it is replaced. Mr. Mazade will provide a list of charter parks to the City Commissioners. This item will be placed on the April worksession for consideration. 2009-2010 Healthcare Program. Finance Mr. Tim Paul, Finance Director, presented the proposed 2009-2010 healthcare program. Citing rising costs, several changes are being recommended to the current program. It is hoped that the changes will keep premiums at approximately the same rate for 2009-2010. Any Other Business. Public participation was accepted. Adjournment Motion by Commissioner Carter, seconded by Commissioner Shepherd to adjourn at 6:30 p.m. MOTION PASSES ________________________ Ann Marie Becker, MMC City Clerk CITY OF MUSKEGON CITY COMMISSION MEETING MARCH 10, 2009 CITY COMMISSION CHAMBERS @ 5:30 P.M. MINUTES The Regular Commission Meeting of the City of Muskegon was held at City Hall, 933 Terrace Street, Muskegon, Michigan at 5:30 p.m., Tuesday, March 10, 2009. Mayor Warmington opened the meeting with a prayer from George Monroe from the Evanston Avenue Baptist Church after which the Commission and public recited the Pledge of Allegiance to the Flag. ROLL CALL FOR THE REGULAR COMMISSION MEETING: Present: Mayor Stephen Warmington, Vice Mayor Stephen Gawron, Commissioners Lawrence Spataro, Sue Wierengo, Steve Wisneski, Chris Carter, and Clara Shepherd (arrived at 5:35), City Manager Bryon Mazade, City Attorney John Schrier, and City Clerk Ann Marie Becker. 2009-21 HONORS AND AWARDS: A. Outstanding Citizenship Awards. Commissioner Wierengo presented Outstanding Citizenship Awards to Justin Brownlee, Jane Buthker and Bernadette Young. 2009-22 CONSENT AGENDA: A. Approval of Minutes. CITY CLERK SUMMARY OF REQUEST: To approve the minutes of the Regular Commission Meeting that was held on Tuesday, February 24th, and the Goal Setting Session that was held on Thursday, February 19th. FINANCIAL IMPACT: None. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: Approval of the minutes. B. 2009/2010 Goals. CITY MANAGER SUMMARY OF REQUEST: To approve the proposed 2009/2010 City goals as discussed at the City Commission goal setting session on February 19, 2009. FINANCIAL IMPACT: Varies, depending on each goal. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: To approve the list of proposed goals. C. Control System Software Configuration to Terminal Services. WATER FILTRATION SUMMARY OF REQUEST: To enter into an agreement with our consultant, Tetra Tech, for programming and software configuration for terminal services at the Water Filtration Plant. FINANCIAL IMPACT: The cost for this service is $9,800. BUDGET ACTION REQUIRED: None, this project is included in the 2009 budget. STAFF RECOMMENDATION: Staff recommends the Mayor and Commission endorse the proposal from Tetra Tech for programming and software configuration for terminal services at the Water Filtration Plant. D. Contract Extension Agreement – One Year Street Sweeping Contract for 2009. PUBLIC WORKS SUMMARY OF REQUEST: To enter into a one-year contractual agreement with TRI-US SERVICES, INC. to provide street sweeping services for 2009. FINANCIAL IMPACT: $148,981.60 cost for one-year contract. Funds to cover all expenses are budgeted. Trunkline expenses are reimbursed by State funding. BUDGET ACTION REQUIRED: None; monies appropriated in Highway and State trunkline budgets. STAFF RECOMMENDATION: Approve request to contract out service for one- year extension as specified in previous contract. E. Memorandum of Understanding – Muskegon Public Schools. PUBLIC SAFETY SUMMARY OF REQUEST: The Director of Public Safety is requesting approval to sign a Memorandum of Understanding with the Muskegon Public Schools for a Safe Schools/Healthy Students Project. This is a collaborative effort between the Muskegon Public Schools, Muskegon County Community Mental Health, the Family Division of the 14th Circuit Court, the State of Michigan Department of Human Services and our police department. By signing this agreement, the department agrees to assist the school district in providing leadership, support and resources to achieve the project priority of implementing a community- wide plan designed to create safe school environments. FINANCIAL IMPACT: None. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: Approval of the agreement. F. Contractual Agreement – Michigan Department of State. PUBLIC SAFETY SUMMARY OF REQUEST: The Director of Public Safety is requesting approval to enter into an agreement with the Michigan Department of State whereby the Department of State will provide driver, vehicle, and related information to the City. The purpose for entering into this agreement is to assist code enforcers with obtaining accurate information to meet district court requirements when completing civil infraction citations. FINANCIAL IMPACT: None. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: Approval of the agreement. I. Engineering Services (Design & Inspection) for Smith Ryerson Park. ENGINEERING SUMMARY OF REQUEST: Authorize staff to enter into an engineering services agreement with Sidock Group out of Muskegon to provide design and construction management to improve/upgrade Smith Ryerson Park as required by the MDNR’s grant for a not to exceed fee of $49,438.50. Sidock is being recommended after review and evaluation of proposals from eleven qualified consulting firms. While all proposals were worthy, staff’s recommendation focused on experience of the project team on similar projects; reasonableness of the proposed fee and associated hours; scope of services to be provided as well as statement of understanding. FINANCIAL IMPACT: $49,438.50 plus an additional 5% of in-house project management. BUDGET ACTION REQUIRED: None at this time as this project was budgeted for in the 2009 CIP. STAFF RECOMMENDATION: Authorize staff to enter into an engineering services agreement with Sidock Group. J. Amend the Uniform Agreement with Arrow Uniform. PUBLIC WORKS SUMMARY OF REQUEST: Authorize staff to amend the contract with Arrow Uniform to suspend the cleaning service they provide for the shop towels and mats for the period between March 11, 2009, until February 28, 2010, and to extend their contract for the aforementioned services until the end of December 2012 instead of August 2012. FINANCIAL IMPACT: Minimal; the shop towels and mats are just changing from Arrow Uniform to Model Coverall for most of 2009 to satisfy previous contract on the advice of the City Attorney. BUDGET ACTION REQUIRED: None at this time. STAFF RECOMMENDATION: Authorize staff to amend the contract with Arrow Uniform. K. Grant Applications for Safety Funds. ENGINEERING SUMMARY OF REQUEST: Authorize staff to submit the following projects for possible Safety Funds in 2010: 1. Intersection of Laketon & Henry to improve skid resistance at $200,000 total cost of which $50,000 is the local match. 2. Upgrade the traffic signals to box span on Laketon @ Hoyt, Getty and Roberts for an estimated total cost of $240,000 of which $60,000 is the local match. FINANCIAL IMPACT: A local match of $110,000 (25%) will be required for all projects and will be budgeted for in 2010. BUDGET ACTION REQUIRED: None at this time; should either or both be approved for grants, they will be listed in the 2010 budget. STAFF RECOMMENDATION: Authorize staff to submit the application(s). L. Maintenance Agreement with Trane for City Hall Chiller. ENGINEERING SUMMARY OF REQUEST: Authorize staff to enter into a five-year service agreement with Trane starting May 1, 2009, and ending April 30, 2014, to perform scheduled maintenance such as annual maintenance, operating inspection, oil analysis, condenser wash and vibration analysis on the chiller at City Hall. The five year fee structure is: First year $2,197; second year $2,263; third year $2,263; fourth year $2,330; and the fifth year $2,330 for a total contract price of $11,383. Trane is being recommended since they are the soul source for the brand of chiller at City Hall. FINANCIAL IMPACT: The total value of the contract of $11,383. BUDGET ACTION REQUIRED: None at this time. STAFF RECOMMENDATION: Authorize staff to enter into a five-year maintenance contract with Trane starting May 1, 2009, and ending April 30, 2014. M. Consideration of Bids for Hackley Avenue, Hudson to Seaway. ENGINEERING SUMMARY OF REQUEST: Award the Hackley Street project, H-1560 & W-712, to Felco Contractors out of Muskegon since they were the lowest responsible bidder with a total bid price of $240,235.50. FINANCIAL IMPACT: The construction cost of $240,235.50 plus engineering cost which is estimated at an additional 15%. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: Award the contract to Felco Contractors. N. Consideration of Bids for Wood Street, Isabella to Apple. ENGINEERING SUMMARY OF REQUEST: Award the Wood Street project, H-1651 & W-716, to Felco Contractors out of Muskegon since they were the lowest responsible bidder with a total bid price of $116,954. FINANCIAL IMPACT: The construction cost of $116,954 plus engineering cost which is estimated at an additional 15%. BUDGET ACTION REQUIRED: None at this time, however, the first quarter forecast for 2009 will be modified to add the cost for the watermain replacement. STAFF RECOMMENDATION: Award the contract to Felco Contractors. O. Accept Resignation and Make Appointments to Boards and Committees. CITY CLERK SUMMARY OF REQUEST: To accept the resignation of Clement Coulombe from the Land Reutilization Committee and appoint Chet Kordecki; appoint Muhammad Hakeem to the CDBG-Citizen’s District Council; Catherine Lindland Young to Public Relations; and Leroy Lockhart to the Equal Opportunity Committee. FINANCIAL IMPACT: None. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: Approval. Motion by Commissioner Carter, second by Commissioner Wierengo to approve the Consent Agenda as read minus items G and H. ROLL VOTE: Ayes: Shepherd, Spataro, Warmington, Wierengo, Wisneski, Carter, and Gawron Nays: None MOTION PASSES 2009-23 ITEMS REMOVED FROM THE CONSENT AGENDA: G. Liquor License Transfer Request for Kwik-Way Mart, 45 E. Muskegon Avenue. CITY CLERK SUMMARY OF REQUEST: The Liquor Control Commission is seeking local recommendation on a request from Almajeed, Inc., to transfer ownership of the 2008 SDD and SDM Licensed Business located at 45 E. Muskegon Avenue from Betak Enterprises III, Inc. FINANCIAL IMPACT: None. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: All departments are recommending approval. Motion by Commissioner Spataro, second by Vice Mayor Gawron to approve the liquor license transfer request for Kwik-Way Mart at 45 E. Muskegon from Betak Enterprises III, Inc., to Almajeed, Inc. ROLL VOTE: Ayes: Spataro, Warmington, Wierengo, Wisneski, Carter, Gawron, and Shepherd Nays: None MOTION PASSES H. Gaming License Request – West Michigan Veterans, Inc. CITY CLERK SUMMARY OF REQUEST: West Michigan Veterans, Inc. is requesting a resolution recognizing them as a non-profit organization operating in the City for the purpose of obtaining a Gaming License. They have been recognized as a 501(c)(3) organization by the State. FINANCIAL IMPACT: None. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: Approval. Motion by Commissioner Spataro, second by Vice Mayor Gawron to approve the Gaming License request from West Michigan Veterans, Inc. ROLL VOTE: Ayes: Warmington, Wierengo, Wisneski, Carter, Gawron, Shepherd, and Spataro Nays: None MOTION PASSES 2009-24 PUBLIC HEARINGS: A. Recommendation for Annual Renewal of Liquor Licenses. CITY CLERK SUMMARY OF REQUEST: To adopt a resolution recommending non-renewal of those liquor license establishments who are in violation of Section 50-146 and 50- 147 of the Code of Ordinances for the City of Muskegon. These establishments have been found to be in non-compliance with the City Code of Ordinances and renewal of their liquor licenses should not be recommended by the City Commission. If any of these establishments come into compliance by March 23, 2009, they will be removed from this resolution, and recommendation for their renewal will be forwarded to the Liquor Control Commission. FINANCIAL IMPACT: None. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: Adoption of the resolution. The Public Hearing opened to hear and consider any comments from the public. Comments were heard from Bill Grimm, 4572 W. Giles, representing Muskegon Recreational Club. Motion by Commissioner Carter, second by Commissioner Spataro to close the Public Hearing and approve the recommendation for denial of the renewal of the liquor license for Elk’s Charity Lodge, City Café, Clay Avenue Cellars, Cuti’s Sports Bar & Grill, Muskegon Family Foods, Muskegon Recreational Club, and Wesco Inc. Motion amended by Commissioner Carter, and second amended by Commissioner Spataro to exclude City Café, Cuti’s Sports Bar & Grill, and Muskegon Recreational Club until the March 24, 2009, Commission Meeting. ROLL VOTE: Ayes: Wierengo, Wisneski, Carter, Gawron, Shepherd, Spataro, and Warmington Nays: None MOTION PASSED 2009-25 NEW BUSINESS: A. Approval of the 2009-2010 Action Plan. COMMUNITY & NEIGHBORHOOD SERVICES SUMMARY OF REQUEST: To approve the 2009-2010 Action Plan for the City of Muskegon Community Development Block Grant/HOME Partnership Program activity. If the Action Plan is approved, the Community and Neighborhood Services office will continue the comment period of the Action Plan as amended if needed until April 17, 2009. On or after April 17, 2009, the Community and Neighborhood Services office will deliver the Action Plan to the United States Department of Housing and Urban Development as required in order to request the Release of Funds for the 2009- 2010 fiscal year. The final allocation amounts approved by the Action Plan will be amended to the document. FINANCIAL IMPACT: Action Plan establishes the 2009-2010 Community Development Block Grant and HOME budgets. BUDGET ACTION REQUIRED: None at this time, budget established by Action Plan. STAFF RECOMMENDATION: To approve the Action Plan as is or as to be amended by the Commissions final decision. COMMITTEE RECOMMENDATION: The Commission received both the Citizen District Council and the Administration recommendations. Motion by Commissioner Spataro, second by Commissioner Carter to approve the 2009-2010 Action Plan. ROLL VOTE: Ayes: Wisneski, Carter, Gawron, Shepherd, Spataro, Warmington, and Wierengo Nays: None MOTION PASSES B. 2009-2010 CDBG/HOME and City Preliminary Decision. COMMUNITY & NEIGHBORHOOD SERVICES SUMMARY OF REQUEST: CDBG/HOME 2009-2010 recommendation, submitted by both the administration and the Citizen’s District Council during the public hearing held at the last meeting on February 24, 2009. In reference to the 2009-2010 CDBG/HOME allocation funding which is designated to be $984,207 and $290,049 respectively, excluding any program income and reprogrammed funding. The Commission is being asked to make their preliminary decision on what items should be funded and at what amounts. The City Commission will be asked to make their final decision on March 24, 2009. FINANCIAL IMPACT: The 2009-2010 allocations will be based on the City Commission final decision. BUDGET ACTION REQUIRED: None at this time. STAFF RECOMMENDATION: Was given to the Commission prior to the Public Hearing. Motion by Vice Mayor Gawron, second by Commissioner Shepherd to base the preliminary decision based on the recommendation by the Citizen’s District Council for the 2009-2010 CDBG/HOME funds pending our final decision on March 24, 2009. ROLL VOTE: Ayes: Carter, Gawron, Shepherd, Spataro, Warmington, Wierengo, and Wisneski Nays: None MOTION PASSES C. Seasonal and Temporary Services Provider Contract. CIVIL SERVICE SUMMARY OF REQUEST: At the February 24, 2009, City Commission meeting, staff requested and received approval to enter into contract negotiations with GoodTemps Temporary Staffing Services. Negotiations with GoodTemps have not been productive in cost reduction. As a result, staff is working with another bidder in an effort to obtain a more cost- effective contract with terms agreeable to the City. FINANCIAL IMPACT: The 2009 projected seasonal and temporary services cost is approximately $700,000. BUDGET ACTION REQUIRED: The 2009 budget allowed for the financial resources. STAFF RECOMMENDATION: Staff requests to update the City Commission on this matter prior to the March 10 meeting. Motion by Vice Mayor Gawron, second by Commissioner Wierengo to award the 2009-2011 temporary and seasonal services provider contract to Beacon Services. ROLL VOTE: Ayes: Gawron, Shepherd, Spataro, Warmington, Wierengo, Wisneski, and Carter Nays: None MOTION PASSES D. Padlock Ordinance – 287 McLaughlin. CITY MANAGER SUMMARY OF REQUEST: To approve initiating the process to consider padlocking the residence at 287 McLaughlin, pursuant to City Ordinance 26-263 (Padlock Ordinance) and the request of the City’s Public Safety Director. It is also requested that the City Commission delegate the responsibility for the hearing required by City Ordinance to a hearing officer and that the City Manager be authorized to appoint such hearing officer. FINANCIAL IMPACT: Costs associated with holding the hearing required by City ordinance. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: To approve initiation of the process to consider padlocking the residence at 287 McLaughlin, delegate the hearing requirement to a hearing officer, and authorize the City Manager to appoint the hearing officer. Motion by Commissioner Spataro, second by Commissioner Shepherd to table any action on enforcing the Padlock Ordinance regarding 287 McLaughlin until the March 24, 2009, City Commission Meeting. ROLL VOTE: Ayes: Shepherd, Spataro, Warmington, Wierengo, Wisneski, Carter, and Gawron Nays: None MOTION PASSES E. 2009-2010 Healthcare Program. FINANCE SUMMARY OF REQUEST: It is time to renew the City’s healthcare coverage for the 2009-10 plan year. Healthcare costs continue to rise. Renewal rates for the City’s current healthcare program initially came in at $930.99/employee/month, 11.5% higher than the current rate ($835.19). After going through a bid process and exploring alternatives, staff recommends renewing coverage through Priority Health, but making several program changes to control costs. FINANCIAL IMPACT: Current year cost of the healthcare program is $2,365,258. Renewing the program “as is” would cost $2,636,564 in the coming year. With implementation of the proposed changes, we estimate annualized costs to be $2,392,554. BUDGET ACTION REQUIRED: None at this time. Employee and retiree healthcare costs are included in the 2009 budget. STAFF RECOMMENDATION: Authorize staff to execute documents with Priority Health implementing the changes outlined in the memorandum. Motion by Commissioner Spataro, second by Vice Mayor Gawron to adopt the recommended changes to the Priority Health healthcare coverage plan. ROLL VOTE: Ayes: Spataro, Warmington, Wierengo, Wisneski, Carter, Gawron, and Shepherd Nays: None MOTION PASSES PUBLIC PARTICIPATION: Comments were heard from the public. ADJOURNMENT: The City Commission Meeting adjourned at 6:37 p.m. Respectfully submitted, Ann Marie Becker, MMC City Clerk Agenda Item No. _________ City Commission Meeting _________________ Date: March 24, 2009 To: Honorable Mayor and City Commission From: Department of Public Works Re: Traffic Department Materials and Services 2009 SUMMARY OF REQUEST: Contract with the Muskegon County Road Commission for the joint purchase of various Traffic Department materials and services. We have bid out these items with MCRC for the past eighteen years. By bidding together with MCRC and other municipalities we are able to get better unit prices because of larger quantity purchases. FINANCIAL IMPACT: Sign materials and services to be jointly bid: Sign blanks ….…………………………………….$1,100.00 approx. Sign posts …………………………………………$4,000.00 approx. Ready Made Signs ……………………………….$2,000.00 approx. Centerline painting………………………………$17,000.00 approx. Total $24,100.00 BUDGET ACTION REQUIRED: Note, this item is requested each year in the appropriate Highway budgets. STAFF RECOMMENDATION: Approve the continued joint purchasing with the Muskegon County Road Commission for sign materials and services. City of Muskegon Traffic Department Memo To : Bob Kuhn From : John Dumouchel Cc: Doug Sayles Date : 3-24-09 Re : Sign Materials & Services: Annual Contract Again this year we are requesting permission to bid jointly for our sign materials and services with the Muskegon County Road Commission as we have done the last eighteen years. They are getting ready to go out for bids on the following items and thus we do not have any actual quotes for 2009. For sign blanks: 2004 2005 2006 2007 2008 sign blanks $1.56/sq. ft. $1.85/sq. ft. $2.20/sq.ft. 2.30/sq. ft. 2.41/sq. ft. For sign posts: 2004 2005 2006 2007 2008 2# x11'posts $9.24/ea. $10.10/ea. $10.42/ea. 12.65/ea. 15.12/ea. 3# x12'posts $15.12/ea. $16.53/ea. $17.05/ea. 20.52/ea. 20.50/ea. For sheeting: Our standard has always been 3M sheeting, they are the only bid usually received by MCRC, they like us, use 3M sheeting exclusively, however we recently purchased our 3M roller, as did MCRC, and no longer have to buy a minimum order to keep the roller they originally gave to us to maintain the warranty on their sheeting. Other competitive sources are also bided out. Finished Signs: Most screened finished signs were purchased through competitive venders, but MCRC started to purchase these signs in the bid system several years for a considerable savings. We have purchased most signs this way the last five years and will continue to do so when purchasing in quantities. Centerline painting: In 1997 M&M Pavement Marking, Inc. was awarded the bid and has been awarded the contract every year since at the same unit prices until 2004 when a 6% increase incurred to cover rising fuel and material costs. These cost increased again in 2006 as much as 27%. MCRC went out for bids and as anticipated there were substantial increases in the three bids received but remained with M&M as they were the low bidder. Some years are also affected by our own engineering projects where some centerline painting is contracted to a different painter when the road project is finished. 2004 2005 2006 2007 2008 $10,006 (M&M) $11,666 (M&M) $14,719 (M&M) $15,382.51 $15752.94 AGENDA ITEM NO. __________ CITY COMMISSION MEETING ________________ TO: Honorable Mayor and City Commission FROM: Department of Public Works DATE: March 24, 2009 SUBJECT: Aggregates, Highway Maintenance Materials and Concrete SUMMARY OF REQUEST: Award bid to supply H1 and H2 limestone chip blend to Verplank Trucking Company, PO Box 8, Ferrysburg, MI 49409 Award bid to supply road slag to Verplank Trucking Company, PO Box 8, Ferrysburg, MI 49409 Award bid to supply Sylvax patching material (CP-6 alternative) to Asphalt Paving, Inc., 1000 E. Sherman Boulevard, Muskegon MI 49444-0190 Award bid for crack sealant to ASI Manufacturing, LLC, 1805 Industrial Park Dr., Grand Haven, MI 49417 Award bid to supply bituminous asphalt product to Asphalt Paving, Inc., 1000 E. Sherman Boulevard, Muskegon MI 49444-0190 Award bid to supply Calcium Chloride 38% (road brine) and 32% (winter salting) to Great Lakes Chloride,1012 E. Free Soil Rd, Free Soil, MI 49411 Award bid to supply screened top soil to Verplank Trucking Company, PO Box 8, Ferrysburg, MI 49409 Award bid to supply 2NS sand to Yellow Rose Transport, 3531 Busch Dr., Grandville, MI 49418 Award bid to supply 7-sack mix concrete to Port City Redi-Mix, 1780 Sheridan Road, Muskegon, MI 49442; contingent upon product availability, timely deliveries, and prices as quoted. FINANCIAL IMPACT: $231,247 based on 2008 quantities at 2009 quotes. BUDGET ACTION REQUIRED: None; funds appropriated in several budgets. STAFF RECOMMENDATION: COMMITTEE RECOMMENDATION: To: The City Commission Through The City Manager From: Robert H. Kuhn, Director of Public Works Date: March 24, 2009 Subject: 2009 Aggregates, Highway Maintenance Materials, and Concrete Requests for bids to provide road maintenance materials were solicited in The Chronicle and from vendors on file. It is recommended that the vendor in bold print supply Public Works with product as needed in 2009. Funds have been appropriated for these purchases. 500 ton H1 & H2 Limestone Chip Blend ($17.50 in 2008; $494.34) Verplank Trucking Co. PO Box 8, Ferrysburg, MI 49409 $16.50 per ton, delivered Yellow Rose Transport 3531 Busch Dr., Grandville, MI 49418 $16.80 per ton, delivered 9,000 ton Road Slag 22-A Natural ($11.25 in 2008; $28,251.07) Verplank Trucking Co. PO Box 8, Ferrysburg, MI 49409 $11.27 per ton, delivered Yellow Rose Transport 3531 Busch Dr., Grandville, MI 49418 $11.82 per ton, delivered 500 tons Sylvax Patching Materials – UPM-CP-7, or ASTM Specification C-136 #9 or Statite CP-6, or similar product ($82.00 in 2008; $25,405.20) Asphalt Paving, Inc. 1000 E. Sherman Boulevard, Muskegon MI 49444-0190 $90.00 per ton, delivered Rieth-Riley Construction Co. 867 Egypt Valley, Ada MI 49301 $120.00 per ton, delivered 50,000 pounds Crack Sealant (block form) ($0.36 in 2008; $60,196.76) ASI Manufacturing, LLC 1805 Industrial Park Dr., Grand Haven, MI 49417 $0.52 per pound, delivered 200 ton Bituminous Asphalt 4:12, Base ($49.00 in 2008; $899.62) Asphalt Paving, Inc. 1000 E. Sherman Boulevard, Muskegon MI 49444-0190 $62.00 per ton, picked up Rieth-Riley Construction Co. 724 E. Washington, Zeeland, MI $54.00 per ton, picked up Note: Bid award based upon location. Requires approximately 2 hours travel time, keeping one/two employees unavailable during this time. Also do not have the equipment needed to keep the asphalt hot from Zeeland to Muskegon. 2009 Aggregates, Highway Maintenance Materials, and Concrete Page 2 March 24, 2009 1,000 ton Bituminous Asphalt 4:12, Top ($50.00 in 2008; $54,525.24) Asphalt Paving, Inc. 1000 E. Sherman Boulevard, Muskegon MI 49444-0190 $63.00 per ton, picked up Rieth-Riley Construction Co. 724 E. Washington, Zeeland, MI $54.00 per ton, picked up 85,000 gallons Calcium Chloride 38% (road brine) ($0.42 in 2008; $20,051.61) Great Lakes Chloride 1012 E. Freesoil, Free Soil, MI 49660 $0.47 per gallon, spread Great Lakes Chloride 1012 E. Freesoil, Free Soil, MI 49660 $0.42 per gallon, storage 15,000 gallons Calcium Chloride 32% (winter salting) ($0.35 in 2008; $0.00) Great Lakes Chloride 1012 E. Freesoil, Free Soil, MI 49660 $0.41 per gallon, storage 500 yards Screened Top Soil ($10.00 in 2008; $2,875.95) Verplank Trucking Co. PO Box 8, Ferrysburg, MI 49409 $9.13 per cubic yard, delivered Felco Contractors, Inc. 856 Pulaski Ave., Muskegon, MI 49441 $10.00 per cubic yard, delivered Yellow Rose Transport 3531 Busch Dr., Grandville, MI 49418 $10.00 per ton, delivered 500 ton 2NS Sand ($6.45 in 2008; $6,027.41) Yellow Rose Transport 3531 Busch Dr., Grandville, MI 49418 $6.40 per ton, delivered Verplank Trucking Co. PO Box 8, Ferrysburg, MI 49409 $6.75 per ton, delivered Concrete mix as needed (7 Sack Mix $81.00* in 2008, $32,519.25) Port City Redi-Mix $81.00 per cubic yard, 7 Sack Mix, delivered 1780 Sheridan Road, Muskegon, MI 49442 Consumers Concrete $91.00 per cubic yard, 7 Sack Mix, delivered 4400 E. Evanston Avenue, Muskegon MI 49442 *The 7-sack mix is the most commonly used product. It should be noted that concrete purchases may include several miscellaneous charges, including, but not limited to, hot water, chloride, small loads, second drops, winter price, and extra unload time. Purchases will be made from recommended bidder, contingent upon product availability, timely deliveries, and prices as quoted. LAA (L/Docs/Bids/2009 Agg…Comm Ltr) Date: 03/24/09 To: Honorable Mayor and City Commission From: DPW RE: Budgeted Vehicle Replacement SUMMARY OF REQUEST: Approval to purchase two 2009 Ford F-450s. FINANCIAL IMPACT: $44,678.00 BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: Approve purchase from Vanderhyde Ford. Memorandum To: Honorable Mayor and City Commissioners From: DPW Date: 03/24/09 Re: Budgeted Vehicle Replacement The Equipment Division has scheduled the replacement of two of our small dump trucks for this year. These vehicles are used for a variety of activities including plowing alleys, many construction projects, and leaf pick up. These trucks will be replacing 1997 model year trucks. We have requested prices from area dealers as well as the statewide purchasing contracts. Attached is a summary of the bids. In accordance with established purchasing policy, we are requesting permission to purchase two 2009 Ford F-450 trucks from Vanderhyde Ford 1 Equipment Purchase - 2009 Macomb County Great Lakes Ford Fremont Ford Vanderhyde Ford 3942 W. Lansing 2469 E. Apple Ave 7148 W. 48th 345 N. Main Type of Vehicle Perry Mi 48872 Muskegon Mi 49442 Fremont Mi. 49412 Cedar Springs Mi. 49319 2 F-450 Pickup Trucks $22,482.00 $23,310.00 $22,391.00 $22,339.00 Total $44,964.00 $46,620.00 $44,782.00 $44,678.00 Date: 03/24/09 To: Honorable Mayor and City Commission From: DPW RE: Budgeted Vehicle Replacement SUMMARY OF REQUEST: Approval to purchase one 2009 Ford F-350 and two Ford F-350 4X4. FINANCIAL IMPACT: $56,119.00 BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: Approve purchase from Vanderhyde Ford. Memorandum To: Honorable Mayor and City Commissioners From: DPW Date: 03/24/09 Re: Budgeted Vehicle Replacement The Equipment Division has scheduled the replacement of three of our one ton construction trucks for this year. One of the four wheel drive trucks will be used in the Cemetery for hauling material and plowing snow. The other four wheel drive will be used by the Water Department for lift station maintenance. The two wheel drive will be used by the Traffic Division for sign repair and maintenance. We have requested prices from area dealers as well as the statewide purchasing contracts. Attached is a summary of the bids. In accordance with established purchasing policy, we are requesting permission to purchase one 2009 Ford F-350 and two F-350 4X4 trucks from Vanderhyde Ford 1 Equipment Purchase - 2009 Macomb County Great Lakes Ford Fremont Ford Vanderhyde Ford 3942 W. Lansing 2469 E. Apple Ave 7148 W. 48th 345 N. Main Type of Vehicle Perry Mi 48872 Muskegon Mi 49442 Fremont Mi. 49412 Cedar Springs Mi. 49319 2 F-350 4X4 truck $19,430.00 $20,182.00 $19,543.00 $19,212.00 1 F-350 truck $17,865.00 $18,823.00 $17,739.00 $17,695.00 Total $56,725.00 $59,187.00 $56,825.00 $56,119.00 AGENDA ITEM NO. ______________ CITY COMMISSION MEETING ____________________ TO: Honorable Mayor and City Commissioners FROM: Bryon L. Mazade, City Manager DATE: March 17, 2009 RE: Resolution Regarding Spending of Stimulus Funds SUMMARY OF REQUEST: To adopt a resolution to commit to purchasing goods and services made in the United States when using Federal Stimulus Package funds. This resolution is a modified version of one from the United Steelworks Union. FINANCIAL IMPACT: None. BUDGET ACTION REQUIRED: None. STAFF RECOMMENDATION: To approve the attached resolution. COMMITTEE RECOMMENDATION: None. pb\AGENDA\RESOLUTION RE SPENDING STIMULUS FUNDS 031709 Date: March 24, 2009 To: Honorable Mayor and City Commission From: Water Filtration RE: Clearwell valve replacement SUMMARY OF REQUEST: To authorize staff to enter into contract with Franklin Holwerda Company, the lowest responsible bidder, for the replacement of the 1937 clearwell effluent valves. FINANCIAL IMPACT: The cost proposal is a total of $47,900.00 including $3000.00 for dune grass remediation. BUDGET ACTION REQUIRED: None. The project is adequately budgeted in the capitol improvements project budget. STAFF RECOMMENDATION: Staff recommends the Mayor and City Commission authorize staff to enter into contract with Franklin Holwerda Company for the clearwell valve replacement at the Water Filtration Plant. MEMORANDUM 3/17/09 TO: M. AL-SHATEL, DEPUTY DIRECTOR FROM: R. VENEKLASEN, WATER FILTRATION RE: CLEARWELL EFFLUENT VALVE REPLACEMENT BACKGROUND The Plant clearwells are used for finished, potable, water storage. There are two separate clearwells with each divided into two halves for a total of four sections. Each section has a nominal capacity of 1.5 million gallons. The original, 1937 clearwell sections have an effluent (water flows out) pipe incorporating an isolation valve prior to joining together. The piping serves as the supply for the pumps that pump water to the City’s distribution network. CONDITION One of the two effluent valves has broken in the open position. This condition does not allow isolation of this section of the clearwell. Both of the valves used to isolate the 1937 clearwell sections are the original installation. The replacement of these valves was originally part of the 2008 capitol improvements plans. The valve replacement project was deferred until 2009 due to the unanticipated high cost of the magnetic flow meter project. The project was budgeted at a cost of $65,000.00. COST PROPOSALS/BIDS The specifications for the clearwell valve replacement were developed early this year. The project includes replacement of the original isolation valves and the valve vault steel hatch door with an aluminum unit. The valve operators will receive extension shafts and guides so the valves can be operated without the need for staff to enter a confined space. The invitation to bid on this project was advertised in the local newspaper and the Builders Exchange. Responses were received from four firms; three of which have previously performed similar work at the Water Filtration Plant. The responses are as follows: FIRM COST Franklin Holwerda Company $47,900.00 2509 29th Street, SW Wyoming, MI 49519 Jackson-Merkey Contractors, Inc. $52,740.00 555 E. Western Avenue Muskegon, MI 49442-1039 Muskegon Valve Company $58,260.00 1596 Creston Muskegon, MI 49442 Pressures & Pipes, Inc. $92,950.00 5575 Davis Road Muskegon, MI 49441 HISTORY As previously indicated; three of the firms bidding on this project have performed work at the City’s Water Filtration Plant. They all performed the work satisfactorily and in many circumstances exceeded expectations. RECOMMENDATION Based on the City’s experience and having submitted the lowest responsible bid; it is my recommendation that the Mayor and City Commission authorize staff to enter into contract with Franklin Holwerda Company for the Clearwell Valve Replacement Project at the Water Filtration Plant. CITY OF MUSKEGON WATER FILTRATION PLANT 24” CLEARWELL VALVE REPLACEMENT SCOPE OF SERVICES • Remove Two (2) existing 24” gate valves. Existing wall pipes to remain. • Install two (2) new 24” Pratt MDT operated butterfly valves with SS stems to extend to existing upper concrete vault slab. • Install valve stem access (buffalo box) as necessary. • Provide valve key to operate valves. • Remove existing access hatch. • Install replacement aluminum access hatch. • Perform all concrete demo and replacement work necessary to install replacement access hatch and valve stem installation. • Cut off existing poured in place steel ladder rungs. • Anchor existing aluminum ladder to vault wall. • Clearwell to be drained by City. • Temporary pumping inside vault to be performed by contractor. • All labor, materials, and equipment are to be provided by contractor. QUALIFICATIONS • Work is in confined space and must follow City requirements to meet MIOSHA and OSHA standards. • Bidders must have performed similar work for the City or are to submit three examples of similar work and contacts for references. SPECIFICATIONS • Valves – H. Prate Co., Groundhog 150B w/BSN, 304 SS ext. stems and guides. Valve on north side to include straight stem with new floorbox installed in existing concrete deck. Valve on south side to include u-joints to offset stem for hatch/ladder access clearance with new floor box. • Hatch to be Bilco 60” X 60” Type JD-4AL Aluminum. CITY COMMISSION MEETING Tuesday, March 24, 2009 TO: Honorable Mayor and City Commissioners FROM: Anthony L. Kleibecker Director of Public Safety DATE: March 18, 2009 SUBJECT: Maintenance Agreement/Rite-Way Plumbing and Heating SUMMARY OF REQUEST: The Director of Public Safety requests that the Commission consider the attached bid for a maintenance agreement with Rite-Way Plumbing and Heating of Grand Rapids. This is a one-year bid to provide quarterly maintenance for the heating and cooling system at Central Fire. Rite-Way was the sub-contractor who installed this system. FINANCIAL IMPACT: None BUDGET ACTION REQUIRED: None STAFF RECOMMENDATION: Approval of this request. Date: 3/19/2009 To: Honorable Mayor and City Commission From: DPW / Marina RE: Sanitary Pump Station at Hartshorn Marina SUMMARY OF REQUEST: Approval to enter into a Grant agreement with the Michigan DNR to purchase a sanitary pump station. The sanitary pump station will be located on public property adjacent to Hartshorn Marina. The unit will be enclosed in an existing facility, and would service Hartshorn Marina Customers and Muskegon Lake boaters for a fee. FINANCIAL IMPACT: None. BUDGET ACTION REQUIRED: None. Federal Clean Vessel Act funding was secured through the grant process; a twenty-five percent match totaling $ 1,482.25 will be allocated from monies saved within the approved 2009 Marina budget. STAFF RECOMMENDATION: Approval to enter into the Grant agreement with the DNR and to authorize staff to sign. Date: March 24, 2009 To: Honorable Mayor and City Commissioners From: Engineering RE: Consideration of Bids for: Merrill Ave., Seventh St. to Sixth Street (H-1649, W- 715 & S-643) SUMMARY OF REQUEST: To waive the irregularity in Hallack contracting bid and award them the Merrill Street project, H-1649 & W-715, since they were the lowest bidder with a total bid price of $227,116.85 (see attached bid tabulation). Hallack contracting who is out of Hart did not use the revised bid proposal sheet which contained one less bid item. FINANCIAL IMPACT: The construction cost of $227,116.85 plus engineering cost which is estimated at an additional 15%. BUDGET ACTION REQUIRED: None at this, however, the first quarter reforecast will include revised numbers from those that were originally budgeted to account for the higher prices than original expected. STAFF RECOMMENDATION: It is in the City’s best interest to waive the irregularity (using the wrong form) and award the bid to Hallack. COMMITTEE RECOMMENDATION: C:\Documents and Settings\Potter\Local Settings\Temporary Internet Files\OLK1A\CONAWA Merrill H-1649 3-24-09.doc H-1649, S-643, W-715 MERRILL AVE. SEVENTH ST. to SIXTH ST. 1 OF 3 BID PROPOSAL 03/03/09 CONTRACTOR WADEL STABILIZATION, INC. BRENNER EXCAVATING JACKSON-MERKEY MILBOCKER & SONS FELCO CONTRACTORS DAN HOE EXCAVATING ADDRESS ENGINEER'S 2500 N. OCEANA DR. 2841 132ND AVE. 555 W. WESTERN AVE. 1256 29TH ST. 874 PULASKI AVE. 13664 ROCKY'S RD. CITY/ST/ZIP ESTIMATE HART, MI 49420 HOPKINS, MI 49328 MUSKEGON, MI 49441 ALLEGAN, MI 49010 MUSKEGON, MI 49441 HOLLAND, MI 49424 ITEM OF WORK UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 ADJUST MANHOLE CASTING EACH 2.0 $400.00 $ 800.00 $ 410.00 $ 820.00 $ 470.00 $ 940.00 $ 345.00 $ 690.00 $ 415.00 $ 830.00 $ 250.00 $ 500.00 $ 325.00 $ 650.00 2 AGG. BASE COURSE 22A @ 6" C.I.P. S.YD. 1935.0 $5.00 $ 9,675.00 $ 5.90 $ 11,416.50 $ 5.10 $ 9,868.50 $ 5.50 $ 10,642.50 $ 5.70 $ 11,029.50 $ 4.90 $ 9,481.50 $ 7.00 $ 13,545.00 3 BENDS D.C.I.8" M.J. 45 DEG. EACH 14.0 $300.00 $ 4,200.00 $ 300.73 $ 4,210.22 $ 275.00 $ 3,850.00 $ 300.00 $ 4,200.00 $ 260.00 $ 3,640.00 $ 205.00 $ 2,870.00 $ 325.00 $ 4,550.00 4 BITUMINOUS LEVELING 3C @ 165#/S.Y. TON 176.0 $60.00 $ 10,560.00 $ 68.10 $ 11,985.60 $ 72.25 $ 12,716.00 $ 71.50 $ 12,584.00 $ 68.10 $ 11,985.60 $ 70.00 $ 12,320.00 $ 70.00 $ 12,320.00 5 BORROW FILL C.Y. 85.0 $5.00 $ 425.00 $ 12.00 $ 1,020.00 $ 6.25 $ 531.25 $ 6.50 $ 552.50 $ 12.00 $ 1,020.00 $ 8.00 $ 680.00 $ 8.50 $ 722.50 6 BITUMINOUS TOP MIX 4C @ 165#/S.Y. TON 176.0 $65.00 $ 11,440.00 $ 74.90 $ 13,182.40 $ 79.50 $ 13,992.00 $ 78.65 $ 13,842.40 $ 74.90 $ 13,182.40 $ 75.90 $ 13,358.40 $ 75.00 $ 13,200.00 7 CATCH BASIN CASTING EAST JORDAN #7045 OR EQUAL EACH 6.0 $550.00 $ 3,300.00 $ 600.00 $ 3,600.00 $ 700.00 $ 4,200.00 $ 430.00 $ 2,580.00 $ 570.00 $ 3,420.00 $ 705.00 $ 4,230.00 $ 550.00 $ 3,300.00 8 CLEAN 54 INCH STORM SEWER PIPE L.FT. 445.0 $10.00 $ 4,450.00 $ 22.50 $ 10,012.50 $ 22.50 $ 10,012.50 $ 36.30 $ 16,153.50 $ 20.50 $ 9,122.50 $ 25.00 $ 11,125.00 $ 20.50 $ 9,122.50 9 CLEAN AND GROUT JOINTS IN 54" STORM SEWER PIPE EACH 115.0 $100.00 $ 11,500.00 $ 634.00 $ 72,910.00 $ 320.00 $ 36,800.00 $ 525.00 $ 60,375.00 $ 745.00 $ 85,675.00 $ 750.00 $ 86,250.00 $ 745.00 $ 85,675.00 10 CATCH BASIN FLAT TOP EACH 6.0 $1,300.00 $ 7,800.00 $ 375.00 $ 2,250.00 $ 1,255.00 $ 7,530.00 $ 925.00 $ 5,550.00 $ 1,300.00 $ 7,800.00 $ 1,075.00 $ 6,450.00 $ 1,800.00 $ 10,800.00 11 CONCRETE CURB & GUTTER STD. DETAIL I L.FT. 960.0 $10.00 $ 9,600.00 $ 11.30 $ 10,848.00 $ 11.20 $ 10,752.00 $ 11.00 $ 10,560.00 $ 9.30 $ 8,928.00 $ 11.00 $ 10,560.00 $ 11.00 $ 10,560.00 12 CONCRETE PAVEMENT 6" S.YD. 253.0 $35.00 $ 8,855.00 $ 29.80 $ 7,539.40 $ 30.70 $ 7,767.10 $ 28.00 $ 7,084.00 $ 25.30 $ 6,400.90 $ 25.00 $ 6,325.00 $ 28.00 $ 7,084.00 13 CONCRETE APPROACH, 6", STANDARD S.YD. 71.0 $35.00 $ 2,485.00 $ 29.35 $ 2,083.85 $ 30.00 $ 2,130.00 $ 28.00 $ 1,988.00 $ 24.85 $ 1,764.35 $ 27.00 $ 1,917.00 $ 30.00 $ 2,130.00 14 CONC. SIDEWALK 4" S.FT. 1328.0 $2.50 $ 3,320.00 $ 2.60 $ 3,452.80 $ 2.65 $ 3,519.20 $ 3.75 $ 4,980.00 $ 2.10 $ 2,788.80 $ 5.50 $ 7,304.00 $ 6.25 $ 8,300.00 15 CONC. SIDEWALK 6" S.FT. 105.0 $5.00 $ 525.00 $ 3.05 $ 320.25 $ 3.10 $ 325.50 $ 4.25 $ 446.25 $ 2.55 $ 267.75 $ 4.00 $ 420.00 $ 8.00 $ 840.00 16 CONC. SIDEWALK ADA RAMP S.FT. 460.0 $5.00 $ 2,300.00 $ 9.50 $ 4,370.00 $ 9.00 $ 4,140.00 $ 9.00 $ 4,140.00 $ 8.00 $ 3,680.00 $ 8.00 $ 3,680.00 $ 6.00 $ 2,760.00 17 CORP. STOP 1" MUELLER #15000 OR EQUAL EACH 14.0 $300.00 $ 4,200.00 $ 400.00 $ 5,600.00 $ 184.00 $ 2,576.00 $ 200.00 $ 2,800.00 $ 300.00 $ 4,200.00 $ 110.00 $ 1,540.00 $ 140.00 $ 1,960.00 18 EXCAVATION C.Y. 116.0 $10.00 $ 1,160.00 $ 10.00 $ 1,160.00 $ 8.00 $ 928.00 $ 4.10 $ 475.60 $ 35.00 $ 4,060.00 $ 17.00 $ 1,972.00 $ 55.00 $ 6,380.00 19 CURB STOP 1" MUELLER #15150 W/BOX OR EQUAL EACH 11.0 $200.00 $ 2,200.00 $ 300.00 $ 3,300.00 $ 250.00 $ 2,750.00 $ 280.00 $ 3,080.00 $ 390.00 $ 4,290.00 $ 145.00 $ 1,595.00 $ 250.00 $ 2,750.00 20 EROSION CONTROL, INLET PROTECTION, FABRIC DROP EACH 8.0 $150.00 $ 1,200.00 $ 125.00 $ 1,000.00 $ 100.00 $ 800.00 $ 105.00 $ 840.00 $ 95.00 $ 760.00 $ 250.00 $ 2,000.00 $ 200.00 $ 1,600.00 21 HYDRANT STD. EACH 1.0 $2,000.00 $ 2,000.00 $ 2,350.00 $ 2,350.00 $ 2,365.00 $ 2,365.00 $ 1,910.00 $ 1,910.00 $ 2,030.00 $ 2,030.00 $ 2,300.00 $ 2,300.00 $ 3,000.00 $ 3,000.00 22 MAN HOLE CASTING, E.J. #1045 OR EQUAL EACH 5.0 $450.00 $ 2,250.00 $ 625.00 $ 3,125.00 $ 565.00 $ 2,825.00 $ 305.00 $ 1,525.00 $ 700.00 $ 3,500.00 $ 500.00 $ 2,500.00 $ 500.00 $ 2,500.00 23 MAN HOLE STD. 4' I.D. 0' TO 10' DEEP EACH 1.0 $2,000.00 $ 2,000.00 $ 1,350.00 $ 1,350.00 $ 1,890.00 $ 1,890.00 $ 1,480.00 $ 1,480.00 $ 2,500.00 $ 2,500.00 $ 1,200.00 $ 1,200.00 $ 2,200.00 $ 2,200.00 24 REDUCER D.C.I. 8" TO 4" M.J. EACH 1.0 $325.00 $ 325.00 $ 245.00 $ 245.00 $ 225.00 $ 225.00 $ 250.00 $ 250.00 $ 210.00 $ 210.00 $ 175.00 $ 175.00 $ 275.00 $ 275.00 25 REDUCER D.C.I. 8" TO 6" M.J. EACH 3.0 $350.00 $ 1,050.00 $ 252.00 $ 756.00 $ 235.00 $ 705.00 $ 250.00 $ 750.00 $ 220.00 $ 660.00 $ 180.00 $ 540.00 $ 200.00 $ 600.00 26 REMOVING CATCH BASIN EACH 5.0 $350.00 $ 1,750.00 $ 450.00 $ 2,250.00 $ 263.00 $ 1,315.00 $ 275.00 $ 1,375.00 $ 270.00 $ 1,350.00 $ 500.00 $ 2,500.00 $ 100.00 $ 500.00 27 REMOVING CONC. RETAINING WALL L FT 309.0 $15.00 $ 4,635.00 $ 3.00 $ 927.00 $ 16.00 $ 4,944.00 $ 2.60 $ 803.40 $ 11.00 $ 3,399.00 $ 4.00 $ 1,236.00 $ 4.00 $ 1,236.00 28 REMOVING CONC. DRIVE APPROACH S.YD. 55.0 $8.00 $ 440.00 $ 4.50 $ 247.50 $ 5.85 $ 321.75 $ 6.75 $ 371.25 $ 2.60 $ 143.00 $ 16.00 $ 880.00 $ 5.00 $ 275.00 29 REMOVING CONCRETE SIDEWALK S. FT. 1993.0 $2.00 $ 3,986.00 $ 1.00 $ 1,993.00 $ 0.50 $ 996.50 $ 0.55 $ 1,096.15 $ 0.50 $ 996.50 $ 3.00 $ 5,979.00 $ 0.75 $ 1,494.75 30 REMOVING MANHOLE EACH 4 $450.00 $ 1,800.00 $ 350.00 $ 1,400.00 $ 260.00 $ 1,040.00 $ 275.00 $ 1,100.00 $ 270.00 $ 1,080.00 $ 500.00 $ 2,000.00 $ 150.00 $ 600.00 31 REMOVING STUMPS 37" OR LARGER EACH 1 $300.00 $ 300.00 $ 500.00 $ 500.00 $ 320.00 $ 320.00 $ 400.00 $ 400.00 $ 270.00 $ 270.00 $ 1,200.00 $ 1,200.00 $ 275.00 $ 275.00 32 REMOVING PAVEMENT S.YD. 2033.0 $5.00 $ 10,165.00 $ 6.00 $ 12,198.00 $ 2.20 $ 4,472.60 $ 2.75 $ 5,590.75 $ 3.35 $ 6,810.55 $ 3.00 $ 6,099.00 $ 2.00 $ 4,066.00 33 REMOVING TREES 13" TO 24" EACH 1 $700.00 $ 700.00 $ 850.00 $ 850.00 $ 395.00 $ 395.00 $ 290.00 $ 290.00 $ 750.00 $ 750.00 $ 1,200.00 $ 1,200.00 $ 500.00 $ 500.00 34 SANITARY SEWER 8" SDR 35 L FT 453.0 $35.00 $ 15,855.00 $ 26.50 $ 12,004.50 $ 30.25 $ 13,703.25 $ 22.50 $ 10,192.50 $ 28.00 $ 12,684.00 $ 18.00 $ 8,154.00 $ 18.00 $ 8,154.00 35 SANITARY SEWER SERVICE 6" SDR 35 L FT 461.0 $30.00 $ 13,830.00 $ 24.00 $ 11,064.00 $ 27.00 $ 12,447.00 $ 20.50 $ 9,450.50 $ 18.00 $ 8,298.00 $ 16.00 $ 7,376.00 $ 17.00 $ 7,837.00 36 SIDEWALK RAMP DETECT. WARN. RETROFIT S.FT. 40.0 $30.00 $ 1,200.00 $ 15.00 $ 600.00 $ 9.00 $ 360.00 $ 55.00 $ 2,200.00 $ 30.00 $ 1,200.00 $ 25.00 $ 1,000.00 $ 30.00 $ 1,200.00 37 SANITARY SEWER WYE 8" x 6" SDR 35 EACH 14.0 $250.00 $ 3,500.00 $ 150.00 $ 2,100.00 $ 170.00 $ 2,380.00 $ 75.00 $ 1,050.00 $ 300.00 $ 4,200.00 $ 125.00 $ 1,750.00 $ 200.00 $ 2,800.00 38 SLEEVE LONG D.C.I. 4" M.J. EACH 1.0 $580.00 $ 580.00 $ 750.00 $ 750.00 $ 165.00 $ 165.00 $ 170.00 $ 170.00 $ 1,290.00 $ 1,290.00 $ 275.00 $ 275.00 $ 250.00 $ 250.00 39 SLEEVE LONG D.C.I. 6" M.J. EACH 3.0 $600.00 $ 1,800.00 $ 750.00 $ 2,250.00 $ 203.00 $ 609.00 $ 220.00 $ 660.00 $ 1,330.00 $ 3,990.00 $ 305.00 $ 915.00 $ 250.00 $ 750.00 40 SLEEVE LONG D.C.I. 8" M.J. EACH 1.0 $600.00 $ 600.00 $ 750.00 $ 750.00 $ 280.00 $ 280.00 $ 305.00 $ 305.00 $ 1,400.00 $ 1,400.00 $ 375.00 $ 375.00 $ 325.00 $ 325.00 41 STORM SEWER 10" S.D.R 35 L FT 187.0 $40.00 $ 7,480.00 $ 24.00 $ 4,488.00 $ 23.50 $ 4,394.50 $ 29.00 $ 5,423.00 $ 22.00 $ 4,114.00 $ 20.00 $ 3,740.00 $ 22.00 $ 4,114.00 42 STORM SEWER 12" S.D.R 35 L FT 20 $45.00 $ 900.00 $ 35.00 $ 700.00 $ 25.00 $ 500.00 $ 34.00 $ 680.00 $ 34.00 $ 680.00 $ 22.00 $ 440.00 $ 25.00 $ 500.00 43 TEE D.C.I. 8"x 8"x 8" M.J. EACH 3.0 $400.00 $ 1,200.00 $ 450.00 $ 1,350.00 $ 412.00 $ 1,236.00 $ 400.00 $ 1,200.00 $ 400.00 $ 1,200.00 $ 475.00 $ 1,425.00 $ 425.00 $ 1,275.00 44 TEE D.C.I. 8"x 8"x 6" M.J. EACH 1.0 $600.00 $ 600.00 $ 420.00 $ 420.00 $ 386.00 $ 386.00 $ 400.00 $ 400.00 $ 360.00 $ 360.00 $ 450.00 $ 450.00 $ 400.00 $ 400.00 45 TERRACE GRADING L FT 517.0 $10.00 $ 5,170.00 $ 6.00 $ 3,102.00 $ 5.75 $ 2,972.75 $ 3.65 $ 1,887.05 $ 5.00 $ 2,585.00 $ 7.00 $ 3,619.00 $ 6.50 $ 3,360.50 46 TRAFFIC CONTROL LUMP 1.0 $5,000.00 $ 5,000.00 $ 5,500.00 $ 5,500.00 $ 11,075.00 $ 11,075.00 $ 2,200.00 $ 2,200.00 $ 21,000.00 $ 21,000.00 $ 2,200.00 $ 2,200.00 $ 2,100.00 $ 2,100.00 47 VALVE 6" GATE M.J. W / BOX EACH 1.0 $750.00 $ 750.00 $ 1,250.00 $ 1,250.00 $ 860.00 $ 860.00 $ 705.00 $ 705.00 $ 740.00 $ 740.00 $ 725.00 $ 725.00 $ 675.00 $ 675.00 48 VALVE 8" GATE M.J. W / BOX EACH 7.0 $800.00 $ 5,600.00 $ 1,350.00 $ 9,450.00 $ 1,182.00 $ 8,274.00 $ 890.00 $ 6,230.00 $ 970.00 $ 6,790.00 $ 870.00 $ 6,090.00 $ 850.00 $ 5,950.00 49 WATERMAIN 4" D.C.I. CL.52 L.FT. 6.0 $60.00 $ 360.00 $ 50.00 $ 300.00 $ 39.00 $ 234.00 $ 38.00 $ 228.00 $ 75.00 $ 450.00 $ 28.00 $ 168.00 $ 120.00 $ 720.00 50 WATERMAIN 6" D.C.I. CL.52 L.FT. 20.0 $60.00 $ 1,200.00 $ 40.00 $ 800.00 $ 30.25 $ 605.00 $ 39.75 $ 795.00 $ 35.00 $ 700.00 $ 29.00 $ 580.00 $ 60.00 $ 1,200.00 51 WATERMAIN 8" D.C.I. CL.52 L.FT. 644.0 $35.00 $ 22,540.00 $ 29.90 $ 19,255.60 $ 30.20 $ 19,448.80 $ 40.05 $ 25,792.20 $ 40.00 $ 25,760.00 $ 22.00 $ 14,168.00 $ 40.00 $ 25,760.00 52 WATER METER PIT COMPLETE EACH 1.0 $500.00 $ 500.00 $ 550.00 $ 550.00 $ 545.00 $ 545.00 $ 530.00 $ 530.00 $ 800.00 $ 800.00 $ 500.00 $ 500.00 $ 850.00 $ 850.00 53 WATER SERVICE 1" TYPE "K" COPPER L.FT. 424.0 $20.00 $ 8,480.00 $ 7.00 $ 2,968.00 $ 12.70 $ 5,384.80 $ 16.50 $ 6,996.00 $ 14.70 $ 6,232.80 $ 9.00 $ 3,816.00 $ 12.00 $ 5,088.00 TOTAL $ 228,541.00 $ 278,925.12 $ 243,803.00 SEE QTY $ 257,599.55 $ 313,017.65 CALC ERR $ 270,152.90 $ 289,079.25 H-1649, S-643, W-715 MERRILL AVE. SEVENTH ST. to SIXTH ST. 2 OF 3 BID PROPOSAL 03/03/09 CONTRACTOR SCHIPPERS EXCAVATING BULTEMA BROTHERS WYOMING EXCAVATORS RON MEYER & ASSOC. EXC. C & D HUGHES HALLACK CONTRACTING ADDRESS ENGINEER'S 9829 LAKE MICHIGAN DR 7744 S. DIVISION AVE. 9580 3 MILE RD 1357 76TH AVE. 3097 LANSING RD. 4223 W POLK RD CITY/ST/ZIP ESTIMATE WEST OLIVE, MI 49460 GRAND RAPIDS, MI 49548 ADA, MI 49301 ZEELAND, MI 49464 CHARLOTTE, MI 48113 HART, MI 49420 ITEM OF WORK UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 ADJUST MANHOLE CASTING EACH 2.0 $400.00 $ 800.00 $ 400.00 $ 800.00 $ 341.48 $ 682.96 $ 737.00 $ 1,474.00 $ 325.00 $ 650.00 $ 500.00 $ 1,000.00 $ 250.00 $ 500.00 2 AGG. BASE COURSE 22A @ 6" C.I.P. S.YD. 1935.0 $5.00 $ 9,675.00 $ 6.25 $ 12,093.75 $ 7.15 $ 13,835.25 $ 11.00 $ 21,285.00 $ 5.00 $ 9,675.00 $ 6.00 $ 11,610.00 $ 6.50 $ 12,577.50 3 BENDS D.C.I.8" M.J. 45 DEG. EACH 14.0 $300.00 $ 4,200.00 $ 300.00 $ 4,200.00 $ 319.86 $ 4,478.04 $ 535.00 $ 7,490.00 $ 300.00 $ 4,200.00 $ 280.00 $ 3,920.00 $ 325.00 $ 4,550.00 4 BITUMINOUS LEVELING 3C @ 165#/S.Y. TON 176.0 $60.00 $ 10,560.00 $ 82.00 $ 14,432.00 $ 79.95 $ 14,071.20 $ 75.00 $ 13,200.00 $ 70.00 $ 12,320.00 $ 68.10 $ 11,985.60 $ 68.10 $ 11,985.60 5 BORROW FILL C.Y. 85.0 $5.00 $ 425.00 $ 12.00 $ 1,020.00 $ 7.94 $ 674.90 $ 7.50 $ 637.50 $ 7.50 $ 637.50 $ 5.00 $ 425.00 $ 10.00 $ 850.00 6 BITUMINOUS TOP MIX 4C @ 165#/S.Y. TON 176.0 $65.00 $ 11,440.00 $ 89.00 $ 15,664.00 $ 85.90 $ 15,118.40 $ 90.00 $ 15,840.00 $ 76.00 $ 13,376.00 $ 74.90 $ 13,182.40 $ 74.90 $ 13,182.40 7 CATCH BASIN CASTING EAST JORDAN #7045 OR EQUAL EACH 6.0 $550.00 $ 3,300.00 $ 650.00 $ 3,900.00 $ 576.60 $ 3,459.60 $ 418.00 $ 2,508.00 $ 600.00 $ 3,600.00 $ 600.00 $ 3,600.00 $ 550.00 $ 3,300.00 8 CLEAN 54 INCH STORM SEWER PIPE L.FT. 445.0 $10.00 $ 4,450.00 $ 10.00 $ 4,450.00 $ 22.47 $ 9,999.15 $ 23.00 $ 10,235.00 $ 13.50 $ 6,007.50 $ 20.50 $ 9,122.50 $ 12.00 $ 5,340.00 9 CLEAN AND GROUT JOINTS IN 54" STORM SEWER PIPE EACH 115.0 $100.00 $ 11,500.00 $ 150.00 $ 17,250.00 $ 745.00 $ 85,675.00 $ 350.00 $ 40,250.00 $ 400.00 $ 46,000.00 $ 745.00 $ 85,675.00 $ 50.00 $ 5,750.00 10 CATCH BASIN FLAT TOP EACH 6.0 $1,300.00 $ 7,800.00 $ 1,100.00 $ 6,600.00 $ 489.91 $ 2,939.46 $ 275.00 $ 1,650.00 $ 800.00 $ 4,800.00 $ 450.00 $ 2,700.00 $ 1,100.00 $ 6,600.00 11 CONCRETE CURB & GUTTER STD. DETAIL I L.FT. 960.0 $10.00 $ 9,600.00 $ 9.60 $ 9,216.00 $ 23.06 $ 22,137.60 $ 13.00 $ 12,480.00 $ 12.00 $ 11,520.00 $ 9.75 $ 9,360.00 $ 10.75 $ 10,320.00 12 CONCRETE PAVEMENT 6" S.YD. 253.0 $35.00 $ 8,855.00 $ 24.40 $ 6,173.20 $ 29.70 $ 7,514.10 $ 26.00 $ 6,578.00 $ 31.00 $ 7,843.00 $ 29.70 $ 7,514.10 $ 32.00 $ 8,096.00 13 CONCRETE APPROACH, 6", STANDARD S.YD. 71.0 $35.00 $ 2,485.00 $ 24.40 $ 1,732.40 $ 49.44 $ 3,510.24 $ 26.00 $ 1,846.00 $ 31.00 $ 2,201.00 $ 29.70 $ 2,108.70 $ 32.00 $ 2,272.00 14 CONC. SIDEWALK 4" S.FT. 1328.0 $2.50 $ 3,320.00 $ 5.60 $ 7,436.80 $ 2.49 $ 3,306.72 $ 6.00 $ 7,968.00 $ 2.35 $ 3,120.80 $ 2.25 $ 2,988.00 $ 2.50 $ 3,320.00 15 CONC. SIDEWALK 6" S.FT. 105.0 $5.00 $ 525.00 $ 3.00 $ 315.00 $ 3.54 $ 371.70 $ 3.00 $ 315.00 $ 3.50 $ 367.50 $ 3.30 $ 346.50 $ 4.00 $ 420.00 16 CONC. SIDEWALK ADA RAMP S.FT. 460.0 $5.00 $ 2,300.00 $ 12.00 $ 5,520.00 $ 8.81 $ 4,052.60 $ 8.00 $ 3,680.00 $ 6.75 $ 3,105.00 $ 6.50 $ 2,990.00 $ 7.00 $ 3,220.00 17 CORP. STOP 1" MUELLER #15000 OR EQUAL EACH 14.0 $300.00 $ 4,200.00 $ 170.00 $ 2,380.00 $ 139.75 $ 1,956.50 $ 200.50 $ 2,807.00 $ 170.00 $ 2,380.00 $ 200.00 $ 2,800.00 $ 100.00 $ 1,400.00 18 EXCAVATION C.Y. 116.0 $10.00 $ 1,160.00 $ 10.00 $ 1,160.00 $ 9.20 $ 1,067.20 $ 9.00 $ 1,044.00 $ 10.00 $ 1,160.00 $ 8.00 $ 928.00 $ 8.00 $ 928.00 19 CURB STOP 1" MUELLER #15150 W/BOX OR EQUAL EACH 11.0 $200.00 $ 2,200.00 $ 275.00 $ 3,025.00 $ 272.09 $ 2,992.99 $ 282.00 $ 3,102.00 $ 200.00 $ 2,200.00 $ 200.00 $ 2,200.00 $ 200.00 $ 2,200.00 20 EROSION CONTROL, INLET PROTECTION, FABRIC DROP EACH 8.0 $150.00 $ 1,200.00 $ 100.00 $ 800.00 $ 136.22 $ 1,089.76 $ 115.50 $ 924.00 $ 140.00 $ 1,120.00 $ 84.00 $ 672.00 $ 85.00 $ 680.00 21 HYDRANT STD. EACH 1.0 $2,000.00 $ 2,000.00 $ 1,850.00 $ 1,850.00 $ 2,450.68 $ 2,450.68 $ 2,068.00 $ 2,068.00 $ 1,950.00 $ 1,950.00 $ 2,200.00 $ 2,200.00 $ 3,000.00 $ 3,000.00 22 MAN HOLE CASTING, E.J. #1045 OR EQUAL EACH 5.0 $450.00 $ 2,250.00 $ 500.00 $ 2,500.00 $ 405.95 $ 2,029.75 $ 308.00 $ 1,540.00 $ 620.00 $ 3,100.00 $ 600.00 $ 3,000.00 $ 500.00 $ 2,500.00 23 MAN HOLE STD. 4' I.D. 0' TO 10' DEEP EACH 1.0 $2,000.00 $ 2,000.00 $ 1,600.00 $ 1,600.00 $ 2,610.31 $ 2,610.31 $ 2,970.00 $ 2,970.00 $ 1,600.00 $ 1,600.00 $ 1,400.00 $ 1,400.00 $ 1,550.00 $ 1,550.00 24 REDUCER D.C.I. 8" TO 4" M.J. EACH 1.0 $325.00 $ 325.00 $ 250.00 $ 250.00 $ 276.93 $ 276.93 $ 380.00 $ 380.00 $ 250.00 $ 250.00 $ 250.00 $ 250.00 $ 275.00 $ 275.00 25 REDUCER D.C.I. 8" TO 6" M.J. EACH 3.0 $350.00 $ 1,050.00 $ 260.00 $ 780.00 $ 264.86 $ 794.58 $ 390.00 $ 1,170.00 $ 260.00 $ 780.00 $ 300.00 $ 900.00 $ 285.00 $ 855.00 26 REMOVING CATCH BASIN EACH 5.0 $350.00 $ 1,750.00 $ 250.00 $ 1,250.00 $ 399.33 $ 1,996.65 $ 330.00 $ 1,650.00 $ 500.00 $ 2,500.00 $ 250.00 $ 1,250.00 $ 275.00 $ 1,375.00 27 REMOVING CONC. RETAINING WALL L FT 309.0 $15.00 $ 4,635.00 $ 6.00 $ 1,854.00 $ 1.52 $ 469.68 $ 20.00 $ 6,180.00 $ 11.70 $ 3,615.30 $ 5.00 $ 1,545.00 $ 15.00 $ 4,635.00 28 REMOVING CONC. DRIVE APPROACH S.YD. 55.0 $8.00 $ 440.00 $ 20.00 $ 1,100.00 $ 0.66 $ 36.30 $ 7.00 $ 385.00 $ 11.70 $ 643.50 $ 6.00 $ 330.00 $ 5.00 $ 275.00 29 REMOVING CONCRETE SIDEWALK S. FT. 1993.0 $2.00 $ 3,986.00 $ 4.00 $ 7,972.00 $ 0.15 $ 298.95 $ 3.00 $ 5,979.00 $ 1.30 $ 2,590.90 $ 1.30 $ 2,590.90 $ 3.50 $ 6,975.50 30 REMOVING MANHOLE EACH 4 $450.00 $ 1,800.00 $ 350.00 $ 1,400.00 $ 262.67 $ 1,050.68 $ 330.00 $ 1,320.00 $ 700.00 $ 2,800.00 $ 300.00 $ 1,200.00 $ 300.00 $ 1,200.00 31 REMOVING STUMPS 37" OR LARGER EACH 1 $300.00 $ 300.00 $ 300.00 $ 300.00 $ 800.00 $ 800.00 $ 440.00 $ 440.00 $ 400.00 $ 400.00 $ 1,500.00 $ 1,500.00 $ 400.00 $ 400.00 32 REMOVING PAVEMENT S.YD. 2033.0 $5.00 $ 10,165.00 $ 4.00 $ 8,132.00 $ 3.36 $ 6,830.88 $ 5.00 $ 10,165.00 $ 2.60 $ 5,285.80 $ 6.00 $ 12,198.00 $ 2.25 $ 4,574.25 33 REMOVING TREES 13" TO 24" EACH 1 $700.00 $ 700.00 $ 550.00 $ 550.00 $ 600.00 $ 600.00 $ 1,650.00 $ 1,650.00 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 750.00 $ 750.00 34 SANITARY SEWER 8" SDR 35 L FT 453.0 $35.00 $ 15,855.00 $ 40.00 $ 18,120.00 $ 83.79 $ 37,956.87 $ 82.00 $ 37,146.00 $ 51.00 $ 23,103.00 $ 45.00 $ 20,385.00 $ 37.50 $ 16,987.50 35 SANITARY SEWER SERVICE 6" SDR 35 L FT 461.0 $30.00 $ 13,830.00 $ 35.00 $ 16,135.00 $ 52.61 $ 24,253.21 $ 63.00 $ 29,043.00 $ 30.00 $ 13,830.00 $ 43.00 $ 19,823.00 $ 37.50 $ 17,287.50 36 SIDEWALK RAMP DETECT. WARN. RETROFIT S.FT. 40.0 $30.00 $ 1,200.00 $ 60.00 $ 2,400.00 $ 6.50 $ 260.00 $ 7.50 $ 300.00 $ 7.00 $ 280.00 $ 6.50 $ 260.00 $ 7.00 $ 280.00 37 SANITARY SEWER WYE 8" x 6" SDR 35 EACH 14.0 $250.00 $ 3,500.00 $ 100.00 $ 1,400.00 $ 125.18 $ 1,752.52 $ 350.00 $ 4,900.00 $ 150.00 $ 2,100.00 $ 100.00 $ 1,400.00 $ 150.00 $ 2,100.00 38 SLEEVE LONG D.C.I. 4" M.J. EACH 1.0 $580.00 $ 580.00 $ 300.00 $ 300.00 $ 234.62 $ 234.62 $ 827.00 $ 827.00 $ 300.00 $ 300.00 $ 150.00 $ 150.00 $ 375.00 $ 375.00 39 SLEEVE LONG D.C.I. 6" M.J. EACH 3.0 $600.00 $ 1,800.00 $ 340.00 $ 1,020.00 $ 287.75 $ 863.25 $ 880.00 $ 2,640.00 $ 350.00 $ 1,050.00 $ 200.00 $ 600.00 $ 425.00 $ 1,275.00 40 SLEEVE LONG D.C.I. 8" M.J. EACH 1.0 $600.00 $ 600.00 $ 400.00 $ 400.00 $ 668.34 $ 668.34 $ 1,151.00 $ 1,151.00 $ 400.00 $ 400.00 $ 200.00 $ 200.00 $ 490.00 $ 490.00 41 STORM SEWER 10" S.D.R 35 L FT 187.0 $40.00 $ 7,480.00 $ 23.00 $ 4,301.00 $ 24.90 $ 4,656.30 $ 70.00 $ 13,090.00 $ 24.00 $ 4,488.00 $ 39.00 $ 7,293.00 $ 22.00 $ 4,114.00 42 STORM SEWER 12" S.D.R 35 L FT 20 $45.00 $ 900.00 $ 27.00 $ 540.00 $ 27.93 $ 558.60 $ 65.00 $ 1,300.00 $ 30.00 $ 600.00 $ 45.00 $ 900.00 $ 26.00 $ 520.00 43 TEE D.C.I. 8"x 8"x 8" M.J. EACH 3.0 $400.00 $ 1,200.00 $ 450.00 $ 1,350.00 $ 455.85 $ 1,367.55 $ 585.50 $ 1,756.50 $ 500.00 $ 1,500.00 $ 550.00 $ 1,650.00 $ 475.00 $ 1,425.00 44 TEE D.C.I. 8"x 8"x 6" M.J. EACH 1.0 $600.00 $ 600.00 $ 425.00 $ 425.00 $ 421.78 $ 421.78 $ 574.50 $ 574.50 $ 475.00 $ 475.00 $ 350.00 $ 350.00 $ 450.00 $ 450.00 45 TERRACE GRADING L FT 517.0 $10.00 $ 5,170.00 $ 9.00 $ 4,653.00 $ 2.71 $ 1,401.07 $ 15.00 $ 7,755.00 $ 10.00 $ 5,170.00 $ 9.50 $ 4,911.50 $ 30.00 $ 15,510.00 46 TRAFFIC CONTROL LUMP 1.0 $5,000.00 $ 5,000.00 $ 4,000.00 $ 4,000.00 $ 3,100.00 $ 3,100.00 $ 2,310.00 $ 2,310.00 $ 6,000.00 $ 6,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 47 VALVE 6" GATE M.J. W / BOX EACH 1.0 $750.00 $ 750.00 $ 750.00 $ 750.00 $ 870.34 $ 870.34 $ 800.00 $ 800.00 $ 700.00 $ 700.00 $ 800.00 $ 800.00 $ 640.00 $ 640.00 48 VALVE 8" GATE M.J. W / BOX EACH 7.0 $800.00 $ 5,600.00 $ 1,000.00 $ 7,000.00 $ 1,149.32 $ 8,045.24 $ 1,014.50 $ 7,101.50 $ 950.00 $ 6,650.00 $ 1,000.00 $ 7,000.00 $ 785.00 $ 5,495.00 49 WATERMAIN 4" D.C.I. CL.52 L.FT. 6.0 $60.00 $ 360.00 $ 33.00 $ 198.00 $ 35.21 $ 211.26 $ 100.00 $ 600.00 $ 61.00 $ 366.00 $ 60.00 $ 360.00 $ 30.00 $ 180.00 50 WATERMAIN 6" D.C.I. CL.52 L.FT. 20.0 $60.00 $ 1,200.00 $ 35.00 $ 700.00 $ 37.05 $ 741.00 $ 83.00 $ 1,660.00 $ 41.00 $ 820.00 $ 65.00 $ 1,300.00 $ 30.00 $ 600.00 51 WATERMAIN 8" D.C.I. CL.52 L.FT. 644.0 $35.00 $ 22,540.00 $ 38.00 $ 24,472.00 $ 50.28 $ 32,380.32 $ 80.00 $ 51,520.00 $ 46.00 $ 29,624.00 $ 70.00 $ 45,080.00 $ 32.90 $ 21,187.60 52 WATER METER PIT COMPLETE EACH 1.0 $500.00 $ 500.00 $ 880.00 $ 880.00 $ 944.93 $ 944.93 $ 1,683.00 $ 1,683.00 $ 500.00 $ 500.00 $ 2,300.00 $ 2,300.00 $ 500.00 $ 500.00 53 WATER SERVICE 1" TYPE "K" COPPER L.FT. 424.0 $20.00 $ 8,480.00 $ 14.00 $ 5,936.00 $ 19.48 $ 8,259.52 $ 55.00 $ 23,320.00 $ 18.00 $ 7,632.00 $ 35.00 $ 14,840.00 $ 18.50 $ 7,844.00 TOTAL $ 228,541.00 WRG BP $ 242,686.15 CALC ERR $ 348,125.48 $ 380,688.00 CALC ERR $ 267,886.80 $ 344,094.20 WRG BP $ 227,116.85 H-1649, S-643, W-715 MERRILL AVE. SEVENTH ST. to SIXTH ST. 3 OF 3 BID PROPOSAL 03/03/09 CONTRACTOR KAMMINGA & ROODVOETS LODESTAR CONSTRUCTION NAGEL CONSTRUCTION ADDRESS ENGINEER'S 3435 BROADMOOR SE 333 NORTH PARK NW PO BOX 10 CITY/ST/ZIP ESTIMATE GRAND RAPIDS, MI 49512 GRAND RAPIDS, MI 49544 MOLINE, MI 49335-0010 ITEM OF WORK UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 ADJUST MANHOLE CASTING EACH 2.0 $400.00 $ 800.00 $ 475.00 $ 950.00 $ 350.00 $ 700.00 $ 400.00 $ 800.00 2 AGG. BASE COURSE 22A @ 6" C.I.P. S.YD. 1935.0 $5.00 $ 9,675.00 $ 5.50 $ 10,642.50 $ 5.75 $ 11,126.25 $ 5.50 $ 10,642.50 3 BENDS D.C.I.8" M.J. 45 DEG. EACH 14.0 $300.00 $ 4,200.00 $ 375.00 $ 5,250.00 $ 350.00 $ 4,900.00 $ 270.00 $ 3,780.00 4 BITUMINOUS LEVELING 3C @ 165#/S.Y. TON 176.0 $60.00 $ 10,560.00 $ 68.10 $ 11,985.60 $ 70.00 $ 12,320.00 $ 68.25 $ 12,012.00 5 BORROW FILL C.Y. 85.0 $5.00 $ 425.00 $ 1.50 $ 127.50 $ 12.00 $ 1,020.00 $ 8.00 $ 680.00 6 BITUMINOUS TOP MIX 4C @ 165#/S.Y. TON 176.0 $65.00 $ 11,440.00 $ 74.90 $ 13,182.40 $ 75.50 $ 13,288.00 $ 75.00 $ 13,200.00 7 CATCH BASIN CASTING EAST JORDAN #7045 OR EQUAL EACH 6.0 $550.00 $ 3,300.00 $ 750.00 $ 4,500.00 $ 725.00 $ 4,350.00 $ 600.00 $ 3,600.00 8 CLEAN 54 INCH STORM SEWER PIPE L.FT. 445.0 $10.00 $ 4,450.00 $ 25.00 $ 11,125.00 $ 25.00 $ 11,125.00 $ 21.00 $ 9,345.00 9 CLEAN AND GROUT JOINTS IN 54" STORM SEWER PIPE EACH 115.0 $100.00 $ 11,500.00 $ 650.00 $ 74,750.00 $ 775.00 $ 89,125.00 $ 745.00 $ 85,675.00 10 CATCH BASIN FLAT TOP EACH 6.0 $1,300.00 $ 7,800.00 $ 1,650.00 $ 9,900.00 $ 800.00 $ 4,800.00 $ 800.00 $ 4,800.00 11 CONCRETE CURB & GUTTER STD. DETAIL I L.FT. 960.0 $10.00 $ 9,600.00 $ 14.00 $ 13,440.00 $ 10.25 $ 9,840.00 $ 9.50 $ 9,120.00 12 CONCRETE PAVEMENT 6" S.YD. 253.0 $35.00 $ 8,855.00 $ 32.00 $ 8,096.00 $ 32.00 $ 8,096.00 $ 25.50 $ 6,451.50 13 CONCRETE APPROACH, 6", STANDARD S.YD. 71.0 $35.00 $ 2,485.00 $ 32.00 $ 2,272.00 $ 32.00 $ 2,272.00 $ 25.00 $ 1,775.00 14 CONC. SIDEWALK 4" S.FT. 1328.0 $2.50 $ 3,320.00 $ 2.50 $ 3,320.00 $ 2.75 $ 3,652.00 $ 2.25 $ 2,988.00 15 CONC. SIDEWALK 6" S.FT. 105.0 $5.00 $ 525.00 $ 3.50 $ 367.50 $ 3.75 $ 393.75 $ 2.60 $ 273.00 16 CONC. SIDEWALK ADA RAMP S.FT. 460.0 $5.00 $ 2,300.00 $ 4.00 $ 1,840.00 $ 10.00 $ 4,600.00 $ 8.00 $ 3,680.00 17 CORP. STOP 1" MUELLER #15000 OR EQUAL EACH 14.0 $300.00 $ 4,200.00 $ 200.00 $ 2,800.00 $ 175.00 $ 2,450.00 $ 125.00 $ 1,750.00 18 EXCAVATION C.Y. 116.0 $10.00 $ 1,160.00 $ 8.00 $ 928.00 $ 30.00 $ 3,480.00 $ 6.50 $ 754.00 19 CURB STOP 1" MUELLER #15150 W/BOX OR EQUAL EACH 11.0 $200.00 $ 2,200.00 $ 350.00 $ 3,850.00 $ 275.00 $ 3,025.00 $ 250.00 $ 2,750.00 20 EROSION CONTROL, INLET PROTECTION, FABRIC DROP EACH 8.0 $150.00 $ 1,200.00 $ 100.00 $ 800.00 $ 125.00 $ 1,000.00 $ 115.00 $ 920.00 21 HYDRANT STD. EACH 1.0 $2,000.00 $ 2,000.00 $ 1,600.00 $ 1,600.00 $ 2,000.00 $ 2,000.00 $ 2,500.00 $ 2,500.00 22 MAN HOLE CASTING, E.J. #1045 OR EQUAL EACH 5.0 $450.00 $ 2,250.00 $ 250.00 $ 1,250.00 $ 625.00 $ 3,125.00 $ 500.00 $ 2,500.00 23 MAN HOLE STD. 4' I.D. 0' TO 10' DEEP EACH 1.0 $2,000.00 $ 2,000.00 $ 1,300.00 $ 1,300.00 $ 1,300.00 $ 1,300.00 $ 800.00 $ 800.00 24 REDUCER D.C.I. 8" TO 4" M.J. EACH 1.0 $325.00 $ 325.00 $ 275.00 $ 275.00 $ 150.00 $ 150.00 $ 255.00 $ 255.00 25 REDUCER D.C.I. 8" TO 6" M.J. EACH 3.0 $350.00 $ 1,050.00 $ 300.00 $ 900.00 $ 150.00 $ 450.00 $ 395.00 $ 1,185.00 26 REMOVING CATCH BASIN EACH 5.0 $350.00 $ 1,750.00 $ 300.00 $ 1,500.00 $ 350.00 $ 1,750.00 $ 100.00 $ 500.00 27 REMOVING CONC. RETAINING WALL L FT 309.0 $15.00 $ 4,635.00 $ 9.00 $ 2,781.00 $ 5.00 $ 1,545.00 $ 6.00 $ 1,854.00 28 REMOVING CONC. DRIVE APPROACH S.YD. 55.0 $8.00 $ 440.00 $ 5.00 $ 275.00 $ 10.00 $ 550.00 $ 3.50 $ 192.50 29 REMOVING CONCRETE SIDEWALK S. FT. 1993.0 $2.00 $ 3,986.00 $ 0.75 $ 1,494.75 $ 1.25 $ 2,491.25 $ 2.50 $ 4,982.50 30 REMOVING MANHOLE EACH 4 $450.00 $ 1,800.00 $ 300.00 $ 1,200.00 $ 350.00 $ 1,400.00 $ 100.00 $ 400.00 31 REMOVING STUMPS 37" OR LARGER EACH 1 $300.00 $ 300.00 $ 350.00 $ 350.00 $ 550.00 $ 550.00 $ 400.00 $ 400.00 32 REMOVING PAVEMENT S.YD. 2033.0 $5.00 $ 10,165.00 $ 3.50 $ 7,115.50 $ 1.25 $ 2,541.25 $ 4.00 $ 8,132.00 33 REMOVING TREES 13" TO 24" EACH 1 $700.00 $ 700.00 $ 500.00 $ 500.00 $ 550.00 $ 550.00 $ 700.00 $ 700.00 34 SANITARY SEWER 8" SDR 35 L FT 453.0 $35.00 $ 15,855.00 $ 30.00 $ 13,590.00 $ 75.00 $ 33,975.00 $ 30.00 $ 13,590.00 35 SANITARY SEWER SERVICE 6" SDR 35 L FT 461.0 $30.00 $ 13,830.00 $ 30.00 $ 13,830.00 $ 65.00 $ 29,965.00 $ 22.00 $ 10,142.00 36 SIDEWALK RAMP DETECT. WARN. RETROFIT S.FT. 40.0 $30.00 $ 1,200.00 $ 40.00 $ 1,600.00 $ 35.00 $ 1,400.00 $ 25.00 $ 1,000.00 37 SANITARY SEWER WYE 8" x 6" SDR 35 EACH 14.0 $250.00 $ 3,500.00 $ 275.00 $ 3,850.00 $ 125.00 $ 1,750.00 $ 150.00 $ 2,100.00 38 SLEEVE LONG D.C.I. 4" M.J. EACH 1.0 $580.00 $ 580.00 $ 550.00 $ 550.00 $ 1,400.00 $ 1,400.00 $ 350.00 $ 350.00 39 SLEEVE LONG D.C.I. 6" M.J. EACH 3.0 $600.00 $ 1,800.00 $ 600.00 $ 1,800.00 $ 1,500.00 $ 4,500.00 $ 400.00 $ 1,200.00 40 SLEEVE LONG D.C.I. 8" M.J. EACH 1.0 $600.00 $ 600.00 $ 650.00 $ 650.00 $ 1,675.00 $ 1,675.00 $ 510.00 $ 510.00 41 STORM SEWER 10" S.D.R 35 L FT 187.0 $40.00 $ 7,480.00 $ 32.00 $ 5,984.00 $ 50.00 $ 9,350.00 $ 28.00 $ 5,236.00 42 STORM SEWER 12" S.D.R 35 L FT 20 $45.00 $ 900.00 $ 36.00 $ 720.00 $ 60.00 $ 1,200.00 $ 31.00 $ 620.00 43 TEE D.C.I. 8"x 8"x 8" M.J. EACH 3.0 $400.00 $ 1,200.00 $ 475.00 $ 1,425.00 $ 450.00 $ 1,350.00 $ 385.00 $ 1,155.00 44 TEE D.C.I. 8"x 8"x 6" M.J. EACH 1.0 $600.00 $ 600.00 $ 450.00 $ 450.00 $ 425.00 $ 425.00 $ 365.00 $ 365.00 45 TERRACE GRADING L FT 517.0 $10.00 $ 5,170.00 $ 4.00 $ 2,068.00 $ 10.00 $ 5,170.00 $ 8.00 $ 4,136.00 46 TRAFFIC CONTROL LUMP 1.0 $5,000.00 $ 5,000.00 $ 15,000.00 $ 15,000.00 $ 5,500.00 $ 5,500.00 $ 2,100.00 $ 2,100.00 47 VALVE 6" GATE M.J. W / BOX EACH 1.0 $750.00 $ 750.00 $ 800.00 $ 800.00 $ 625.00 $ 625.00 $ 690.00 $ 690.00 48 VALVE 8" GATE M.J. W / BOX EACH 7.0 $800.00 $ 5,600.00 $ 950.00 $ 6,650.00 $ 775.00 $ 5,425.00 $ 880.00 $ 6,160.00 49 WATERMAIN 4" D.C.I. CL.52 L.FT. 6.0 $60.00 $ 360.00 $ 57.00 $ 342.00 $ 125.00 $ 750.00 $ 55.00 $ 330.00 50 WATERMAIN 6" D.C.I. CL.52 L.FT. 20.0 $60.00 $ 1,200.00 $ 40.00 $ 800.00 $ 75.00 $ 1,500.00 $ 56.00 $ 1,120.00 51 WATERMAIN 8" D.C.I. CL.52 L.FT. 644.0 $35.00 $ 22,540.00 $ 42.00 $ 27,048.00 $ 60.00 $ 38,640.00 $ 50.00 $ 32,200.00 52 WATER METER PIT COMPLETE EACH 1.0 $500.00 $ 500.00 $ 2,000.00 $ 2,000.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 53 WATER SERVICE 1" TYPE "K" COPPER L.FT. 424.0 $20.00 $ 8,480.00 $ 38.00 $ 16,112.00 $ 40.00 $ 16,960.00 $ 21.00 $ 8,904.00 TOTAL $ 228,541.00 $ 315,936.75 WRG BP $ 372,525.50 $ 291,805.00 DATE: 03/17/2009 TO: Honorable Mayor and Commissioners FROM: Mark Kincaid, Deputy Director of Public Safety RE: Concurrence with the Housing Board of Appeals Notice and Order to Demolish. Dangerous Building Case #: EN080073 SUMMARY OF REQUEST: This is to request that the City Commission Concur with the findings of the Housing Board of Appeals that the structure located at 1035 PINE ST Area 11b is unsafe, substandard, a public nuisance and that it be demolished within thirty (30) days. It is further requested that administration be directed to obtain bids for the demolition of the structure and that the Mayor and City Clerk be authorized and directed to execute a contract for demolition with the lowest responsible bidder. Case# & Project Address: # EN080073 – 1035 Pine St Location and ownership: This structure is located on Pine Street between Hartford and Concord Streets and is owned by Dessie Spoelman. Staff Correspondence: A dangerous building inspection was conducted on 03/14/08. The Notice and Order to Repair was issued on 03/28/08. On 08/07/08 the HBA tabled case until October 2008. On 10/02/08 declared the structure substandard and dangerous. Owner Contact: The owner’s son was present for both HBA meetings stating Historic Committee was interested in taking possession and moving the structure. There has been no information on the sale or any permits to move structure. Financial Impact: CDBG Funds Budget action required: None State Equalized value: $25,100 (Entire property) Estimated cost to repair: $15,000 (Exterior Only) Staff Recommendation: To concur with the Housing Board of Appeals decision to demolish. CITY OF MUSKEGON 933 Terrace St., P.O. Box 537, Muskegon, MI 49443 (231) 724-6715 DANGEROUS BUILDING INSPECTION REPORT Monday, March 24, 2008 Enforcement # EN080073 Property Address 1035 PINE ST Parcel #24-205-221-0008-00 Owner SPOELMAN DESSIE M Inspector: Henry Faltinowski Date completed: 03/14/08 DEFICENCIES: Uncorrected 1. House boarded chimney needs to be repaired, roof covering needs to be replaced. 2. Front porch roof rotted. 3. Front porch footing failing. 4. Back porch footing failing. 5. Soffits and fascia need repairs. 6. Garage roof needs to be replaced. 7. Garage wall bowed. Request interior inspection by all trades, electrical, mechanical and plumbing. Please contact Inspection Services with any questions or to schedule an inspection at 933 Terrace St., Muskegon, MI 49440 (231) 724 6758. Based upon my recent inspection of the above property I determined that the structure meets the definition of a Dangerous Building and/or Substandard Building as set forth in Section 10-61 of the Muskegon City Code. _____________________________ _______________ Henry Faltinowski, Building Inspector Date CITY OF MUSKEGON 933 Terrace St., P.O. Box 536, Muskegon, MI 49443 (231)724-6715 DANGEROUS BUILDING INTERIOR INSPECTION REPORT 1035 PINE ST 01/16/2009 Inspection noted: Uncorrected 1. House to be rewired to code. 2. Electric service to be replaced to code. 3. Smoke alarms to be installed to code. 4. Repair all ceiling,wall & floor coverings. 5. Repair all damaged windows and doors. 6. Need vac breaker per hose spigot. 7. Pressure test gas lines. 8. Inspect & certify furnace, water heater & chimney. 9. Inspect & repair all house plumbing. 10. Insure building sewer & water service are in good shape. 11. Need mixing valve on tub (all). 12. Need kitchen sink. 13. Provide heat & return air in house. 14. All plumbing & mechanical to conform with 2006 code. BASED UPON MY RECENT INSPECTION OF THE ABOVE PROPERTY, I HAVE DETERMINED THAT THE STRUCTURE MEETS THE DEFINITION OF A DANGEROUS AND/OR SUBSTANDARD BUILDING AS SET FORTH IN SECTION 10-61 OF THE MUSKEGON CITY CODE. HENRY FALTINOWSKI, BUILDING INSPECTOR DATE DATE: 03/17/2009 TO: Honorable Mayor and Commissioners FROM: Mark Kincaid, Deputy Director of Public Safety RE: Concurrence with the Housing Board of Appeals Notice and Order to Demolish. Dangerous Building Case #: EN080128 SUMMARY OF REQUEST: This is to request that the City Commission Concur with the findings of the Housing Board of Appeals that the structure located at 521 LEONARD AVE Area 11 is unsafe, substandard, a public nuisance and that it be demolished within thirty (30) days. It is further requested that administration be directed to obtain bids for the demolition of the structure and that the Mayor and City Clerk be authorized and directed to execute a contract for demolition with the lowest responsible bidder. Case# & Project Address: # EN080128 – 521 Leonard Location and ownership: This structure is located on Leonard between Langley and Marshall Streets; ownership is a land contract between Vista Ciudad LLC and Daylan Barnard. Staff Correspondence: A dangerous building inspection was conducted on 06/03/08. The Notice and Order to Repair was issued on 06/04/08. An interior inspection was conducted 07/08/08. On 09/04/08 the HBA declared the structure substandard, a public nuisance and dangerous building. Owner Contact: No one was present for the HBA meeting dated 09/04/08. The owner submitted timeline that was disapproved 11/06/08. Updated timeline was submitted12/11/08. No permits have been issued. Financial Impact: CDBG Funds Budget action required: None State Equalized value: $17,900 (Entire property) Estimated cost to repair: $15,000 Home & Garage Staff Recommendation: To concur with the Housing Board of Appeals decision to demolish. CITY OF MUSKEGON 933 Terrace St., P.O. Box 536, Muskegon, MI 49443 (231)724-6715 DANGEROUS BUILDING INTERIOR INSPECTION REPORT 521 LEONARD AVE 07/08/2008 Inspection noted: Uncorrected 1. Front bedroom plugs have reverse polarity. 2. Wire garage to code. 3. Wire switch box behind door to garage properly. 4. Ceiling fans to have rated boxes. 5. One breaker is oversized. 6. Branch circuit breakers not to be ahead of main breaker. 7. Insure boxes @ all light fixtures. 8. Install smoke alarms to code. 9. Replace cut beam 10. Tuck point foundation/block wall gaps. 11. Smoke alarms to hardwire/battery backup. 12. Call when garage is cleaned up to check sill and bottom plate conditions. 13. Inspect & insure plumbing works. 14. Pressure test gas line. 15. Need vac breakers on hose spigot. 16. Need scald free faucet for tub/shower; replace strap bath lavatory. 17. Clean ductwork. 18. Inspect & certify water service & sewer. 19. Provide return air to habital spaces. 20. Need bath vent fan. 21. Support water piping & gas. 22. Need hammer arrestor for laundry. 23. Straighten out dryer vent. 24. Inspect & certify water heater, furnace, & chimney. 25. Need T & P drain for water heater. 26. Remove asbestos. 27. All plumbing & mechanical to conform 2006 code. BASED UPON MY RECENT INSPECTION OF THE ABOVE PROPERTY, I HAVE DETERMINED THAT THE STRUCTURE MEETS THE DEFINITION OF A DANGEROUS AND/OR SUBSTANDARD BUILDING AS SET FORTH IN SECTION 10-61 OF THE MUSKEGON CITY CODE. HENRY FALTINOWSKI, BUILDING INSPECTOR DATE CITY OF MUSKEGON 933 Terrace St., P.O. Box 537, Muskegon, MI 49443 (231) 724-6715 DANGEROUS BUILDING INSPECTION REPORT Wednesday, June 4, 2008 Enforcement # EN080128 Property Address 521 LEONARD AVE Parcel #24-205-010-0008-00 Owner BARNARD DAYLAN J Inspector: Henry Faltinowski Date completed: 06/03/2008 DEFICENCIES: Home & Garage Uncorrected 1. Repair front porch roof to code rotted soffit - fascia, sagging rafters. 2. Repair foundation walls- Provide repairs for basement windows and foundation vents. 3. Repair all damaged siding. 4. Repair roof covering and roof flashing to MRC 2003 Code. 5. Garage roof collapsing - remove or rebuild to MRC code 2003 requirements. 6. Request provide interior by trade inspectors. Request interior inspection by all trades, electrical, mechanical and plumbing. Please contact Inspection Services with any questions or to schedule an inspection at 933 Terrace St., Muskegon, MI 49440 (231) 724 6758. Based upon my recent inspection of the above property I determined that the structure meets the definition of a Dangerous Building and/or Substandard Building as set forth in Section 10-61 of the Muskegon City Code. _____________________________ _______________ Henry Faltinowski, Building Inspector Date DATE: 03/16/2009 TO: Honorable Mayor and Commissioners FROM: Mark Kincaid, Deputy Director of Public Safety RE: Concurrence with the Housing Board of Appeals Notice and Order to Demolish. Dangerous Building Case #: EN070250 SUMMARY OF REQUEST: This is to request that the City Commission Concur with the findings of the Housing Board of Appeals that the structure located at 312 CROSS AVE (Garage) Area 11 is unsafe, substandard, a public nuisance and that it be demolished within thirty (30) days. It is further requested that administration be directed to obtain bids for the demolition of the structure and that the Mayor and City Clerk be authorized and directed to execute a contract for demolition with the lowest responsible bidder. Case# & Project Address: # EN070250 – 312 Cross (Garage) Location and ownership: This structure is located on Cross St between Yuba and Seaway Dr and is owned by William Reed. Staff Correspondence: A dangerous building inspection was conducted on 11/26/07. The Notice and Order to Repair was issued on 11/30/07. Case came before HBA 02/07/08 and was tabled until May 2008 meeting with owner to obtain appropriate permits and complete repairs. On 05/01/08 the HBA declared the structure substandard and dangerous with delay going to City Commission until July 2008. Owner Contact: Mr. Reed was present for both HBA meetings dated 02/07/08 and 05/01/08 respectively. A permit was issued 07/15/08 and expired 09/01/08. A final inspection was scheduled 12/08/08 but items were found that needed to be addressed. No final inspection has been scheduled since that date. Financial Impact: CDBG Funds Budget action required: None State Equalized value: $24,300 (Entire property) Estimated cost to repair: $2,500 Staff Recommendation: To concur with the Housing Board of Appeals decision to demolish. CITY OF MUSKEGON 933 Terrace St., P.O. Box 537, Muskegon, MI 49443 (231) 724-6715 DANGEROUS BUILDING INSPECTION REPORT Thursday, November 29, 2007 Enforcement # EN070250 Property Address 312 CROSS AVE (Garage Only) Parcel #24-205-130-0007-10 Owner REED WILLIAM S Inspector: Henry Faltinowski Date completed: 11/29/2007 DEFICENCIES: Uncorrected 1. Garage door has large sag in rafter system - repair or replace. 2. Deteriorating roof covering replace. 3. Missing fascia and soffit on garage. 4. Missing garage doors - replace. 5. Scrape and paint all exterior wood. 6. Repair any loose or damaged siding. 7. All repairs must be completed to MRC 2003 standards. Request interior inspection by all trades, electrical, mechanical and plumbing. Please contact Inspection Services with any questions or to schedule an inspection at 933 Terrace St., Muskegon, MI 49440 (231) 724 6758. Based upon my recent inspection of the above property I determined that the structure meets the definition of a Dangerous Building and/or Substandard Building as set forth in Section 10-61 of the Muskegon City Code. _____________________________ _______________ Henry Faltinowski, Building Inspector Date DATE: 03/17/2009 TO: Honorable Mayor and Commissioners FROM: Mark Kincaid, Deputy Director of Public Safety RE: Concurrence with the Housing Board of Appeals Notice and Order to Demolish. Dangerous Building Case #: EN080272 SUMMARY OF REQUEST: This is to request that the City Commission Concur with the findings of the Housing Board of Appeals that the structure located at 724 E ISABELLA AVE Area 11 is unsafe, substandard, a public nuisance and that it be demolished within thirty (30) days. It is further requested that administration be directed to obtain bids for the demolition of the structure and that the Mayor and City Clerk be authorized and directed to execute a contract for demolition with the lowest responsible bidder. Case# & Project Address: # EN080272 – 724 E. Isabella Location and ownership: This structure is located on Isabella between Kenneth and Holt Streets and is owned by Big Star Holdings LLC. Staff Correspondence: A dangerous building inspection was conducted on 11/13/08. The Notice and Order to Repair was issued on 11/19/08. On 01/08/09 the HBA declared the structure substandard and dangerous. Owner Contact: No one was present for the HBA meeting dated 12/06/07. All notices sent certified mail have returned unclaimed. No permits have been issued and no inspections scheduled. Financial Impact: CDBG Funds Budget action required: None State Equalized value: $17,600 (Entire property) Estimated cost to repair: $6,000 (Exterior only) Staff Recommendation: To concur with the Housing Board of Appeals decision to demolish. CITY OF MUSKEGON 933 Terrace St., P.O. Box 537, Muskegon, MI 49443 (231) 724-6715 DANGEROUS BUILDING INSPECTION REPORT Wednesday, November 19, 2008 Enforcement # EN080272 Property Address 724 E ISABELLA AVE Parcel #24-205-063-0002-70 Owner BIG STAR HOLDINGS LLC Inspector: Henry Faltinowski Date completed: 11/13/2008 DEFICENCIES: Uncorrected 1. Replace damage roof covering, and any damaged rafters and sheathing. 2. Repair exterior stairs - steps foundation on porch. 3. Repair all damaged siding. 4. Replace rotting basement window sills. 5. Request interior inspection by trade inspectors. Request interior inspection by all trades, electrical, mechanical and plumbing. Please contact Inspection Services with any questions or to schedule an inspection at 933 Terrace St., Muskegon, MI 49440 (231) 724 6758. Based upon my recent inspection of the above property I determined that the structure meets the definition of a Dangerous Building and/or Substandard Building as set forth in Section 10-61 of the Muskegon City Code. _____________________________ _______________ Henry Faltinowski, Building Inspector Date DATE: 03/17/2009 TO: Honorable Mayor and Commissioners FROM: Mark Kincaid, Deputy Director of Public Safety RE: Concurrence with the Housing Board of Appeals Notice and Order to Demolish. Dangerous Building Case #: EN080273 SUMMARY OF REQUEST: This is to request that the City Commission Concur with the findings of the Housing Board of Appeals that the structure located at 642 MCLAUGHLIN AVE (Home & Garage) is unsafe, substandard, a public nuisance and that it be demolished within thirty (30) days. It is further requested that administration be directed to obtain bids for the demolition of the structure and that the Mayor and City Clerk be authorized and directed to execute a contract for demolition with the lowest responsible bidder. Case# & Project Address: # EN080273 – 642 McLaughlin Location and ownership: This structure is located on McLaughlin between Kenneth and Maple Streets and is owned by Mary Phillips/Marvin Black, 941 Butterworth St SW, Grand Rapids, MI 49504. Staff Correspondence: A dangerous building inspection was conducted on 11/18/08. The Notice and Order to Repair was issued on 11/19/08. On 01/08/09 the HBA declared the structure substandard and dangerous. Owner Contact: No one was present for the HBA meeting dated 01/08/09. A letter was received in December 2008 from Mary Phillips stating she was relocating to Grand Rapids from New Orleans, LA as she was a victim of Hurricane Katrina. She indicated intention was to restore the structure but due to financial problems and surgery of co-owner would not be able to start on home immediately, no timeline was provided. Financial Impact: CDBG Funds Budget action required: None State Equalized value: $23,300 (Entire property) Estimated cost to repair: $5,000 (Exterior only) Staff Recommendation: To concur with the Housing Board of Appeals decision to demolish. CITY OF MUSKEGON 933 Terrace St., P.O. Box 537, Muskegon, MI 49443 (231) 724-6715 DANGEROUS BUILDING INSPECTION REPORT Wednesday, November 19, 2008 Enforcement # EN080273 Property Address 642 MCLAUGHLIN AVE Parcel #24-205-082-0012-00 Owner PHILLIPS MARY/BLACK MARVIN Inspector: Henry Faltinowski Date completed: 11/18/08 DEFICENCIES: HOME & GARAGE Uncorrected 1. Home is boarded partially back door open. 2. Replace missing damaged siding. 3. Repair foundation wall, missing mortar blocks out of alignment, open crawl space area. 4. Paint and graffitti on home and garage. 5. Interior wall and floor damage. 6. Inspection by trade inspectors requested for interior. Request interior inspection by all trades, electrical, mechanical and plumbing. Please contact Inspection Services with any questions or to schedule an inspection at 933 Terrace St., Muskegon, MI 49440 (231) 724 6758. Based upon my recent inspection of the above property I determined that the structure meets the definition of a Dangerous Building and/or Substandard Building as set forth in Section 10-61 of the Muskegon City Code. _____________________________ _______________ Henry Faltinowski, Building Inspector Date DATE: 03/17/2009 TO: Honorable Mayor and Commissioners FROM: Mark Kincaid, Deputy Director of Public Safety RE: Concurrence with the Housing Board of Appeals Notice and Order to Demolish. Dangerous Building Case #: EN080259 SUMMARY OF REQUEST: This is to request that the City Commission Concur with the findings of the Housing Board of Appeals that the structure located at 1505 LAKESHORE DR (Garage) is unsafe, substandard, a public nuisance and that it be demolished within thirty (30) days. It is further requested that administration be directed to obtain bids for the demolition of the structure and that the Mayor and City Clerk be authorized and directed to execute a contract for demolition with the lowest responsible bidder. Case# & Project Address: # EN080259 – 1505 Lakeshore Dr. (Garage) Location and ownership: This structure is located on Lakeshore Dr. between Schuyler and Greeley Streets and is owned by HSBC Mortgage Services, Inc., 636 Grand Regency Blvd., Brandon, FL 33510. Staff Correspondence: A dangerous building inspection was conducted on 10/28/08. The Notice and Order to Repair was issued on 10/30/08. On 01/08/09 the HBA declared the structure substandard and dangerous. Owner Contact: No one was present for the HBA meeting dated 01/08/09. No permits have been issued, no inspections scheduled and no owner contact. Financial Impact: CDBG Funds Budget action required: None State Equalized value: $55,100 (Entire property) Estimated cost to repair: $2,000 Staff Recommendation: To concur with the Housing Board of Appeals decision to demolish. CITY OF MUSKEGON 933 Terrace St., P.O. Box 537, Muskegon, MI 49443 (231) 724-6715 DANGEROUS BUILDING INSPECTION REPORT Thursday, October 30, 2008 Enforcement # EN080259 Property Address 1505 LAKESHORE DR (Garage Only) Parcel #24-205-526-0006-00 Owner HSBC MORTGAGE SERVICES INC Inspector: Henry Faltinowski Date completed: 10/28/2008 DEFICENCIES: Uncorrected 1. Replace damage roofing blue tarp hanging off roof of garage. 2. Large amount of debris around structure - clean up debris and schedule interior inspection. Request interior inspection by all trades, electrical, mechanical and plumbing. Please contact Inspection Services with any questions or to schedule an inspection at 933 Terrace St., Muskegon, MI 49440 (231) 724 6758. Based upon my recent inspection of the above property I determined that the structure meets the definition of a Dangerous Building and/or Substandard Building as set forth in Section 10- 61 of the Muskegon City Code. _____________________________ _______________ Henry Faltinowski, Building Inspector Date
Sign up for City of Muskegon Emails