City Commission Packet 09-24-2019

View the PDF version Google Docs PDF Viewer

      CITY OF MUSKEGON
        CITY COMMISSION MEETING
        SEPTEMBER 24, 2019 @ 5:30 P.M.
     MUSKEGON CITY COMMISSION CHAMBERS
    933 TERRACE STREET, MUSKEGON, MI 49440


                                     AGENDA

□      CALL TO ORDER:
□      PRAYER:
□      PLEDGE OF ALLEGIANCE:
□      ROLL CALL:
□      HONORS AND AWARDS:
□      PUBLIC COMMENT ON AGENDA ITEMS:
□      CONSENT AGENDA:
    A. Approval of Minutes       City Clerk
    B. Financial Policy Update City Treasurer
    C. Equipment Replacement           DPW/Equipment
    D. Development and Reimbursement Agreement, Midtown/Nelson
       Brownfield Economic Development
    E. Thermal Imaging Cameras (TIC)          Public Safety/Fire Department
    F. Melching – Change Order #005           Public Works
    G. Water Filtration Plant – CE Contract   Public Works
    H. Establish Policy and Application for Block Parties Planning
    I. Rezoning of 1713 7th Street     Planning
    J. Community Relations Committee Recommendations           Clerk
□   PUBLIC HEARINGS:
    A. CAPER 2018 Community & Neighborhood Services
□ UNFINISHED BUSINESS:
□ NEW BUSINESS:

                                          Page 1 of 2
    A. Royal Glen Partnership             City Manager
    B. Construction Agreement – Clark                      City Manager
    C. DDA On-Premise Liquor License for the LC Walker Arena                                  Planning
    D. Recreational Marihuana Regulatory Ordinance                           Planning
    E. Amendment to the Medical Marihuana Facilities Overlay District to also
       allow Recreational Marihuana facilities Planning
□ ANY OTHER BUSINESS:
□ PUBLIC COMMENT ON NON-AGENDA ITEMS:
►      Reminder: Individuals who would like to address the City Commission shall do the following:
►      Fill out a request to speak form attached to the agenda or located in the back of the room.
►      Submit the form to the City Clerk.
►      Be recognized by the Chair.
►      Step forward to the microphone.
►      State name and address.
►      Limit of 3 minutes to address the Commission.
►      (Speaker representing a group may be allowed 10 minutes if previously registered with City Clerk.)

□ CLOSED SESSION:
□ ADJOURNMENT:
ADA POLICY: THE CITY OF MUSKEGON WILL PROVIDE NECESSARY AUXILIARY AIDS AND SERVICES TO INDIVIDUALS
WHO WANT TO ATTEND THE MEETING UPON TWENTY-FOUR HOUR NOTICE TO THE CITY OF MUSKEGON. PLEASE
CONTACT ANN MARIE MEISCH, CITY CLERK, 933 TERRACE STREET, MUSKEGON, MI 49440 OR BY CALLING (231) 724-
6705 OR TTY/TDD DIAL 7-1-1-22 TO REQUEST A REPRESENTATIVE TO DIAL (231) 724-6705.




                                                       Page 2 of 2
Memorandum
To:      Mayor and Commissioners

From: Frank Peterson

Re:      City Commission Meeting

Date: September 19, 2019

Regular Session:

      1. Under the Consent Agenda, we are asking the Commission to consider the following:
            a. Approval of meeting minutes from the most-recent City Commission meeting.
            b. Approval of an update to our financial policy related to poverty exemptions for
                 qualified property tax payers. This update is simply bringing our city into
                 compliance with rules/regulations related to the poverty exemption program.
            c. Approval to purchase a replacement backhoe in the equipment division.
            d. Approval of the development and reimbursement agreement for the Midtown
                 Square 2 project. This is the part of the Brownfield Plan that will ensure the city
                 is made whole on its investment.
            e. Approval of the purchase of new thermal imaging cameras for the fire
                 department.
            f. Approval of a change order to the prison demolition contract to allow the city to
                 access crushed concrete and crushed asphalt on the site rather then have it hauled
                away. The new materials would be used at various city projects; some may be
                kept on site for redevelopment purposes.
            g. Approval of a contract with Consumers Energy related to energy usage during
                peak times at the water filtration plant. The agreement should result in significant
                cost savings for the plant.
            h. Approval of the new block party policy as presented at the work session earlier
                this month.
            i. Approval of the rezoning of 1713 7th Street to accommodate redevelopment of
                 the site. The Planning Commission unanimously recommended the change.
            j. Approval of CRC recommendations to appoint residents to various boards and
                 commissions.
      2. Public Hearings
            a. We are seeking input on the 2018 CAPER. This is an annual document prepared
                 by CNS related to the department’s activities that are HUD funded.
   3. New Business
        a. Staff is seeking permission to pursue a PILOT amendment for Royale Glen
            Apartments. The complex is located adjacent to Campbell Field. As part of the
            amendment, we would provide for a 5-year extension and a reduction from 5%
            PILOT to a 1% city service fee and a 1% PILOT (2% total). The changes will create
            new capital for the owners to allow for the investment of approximately $600,000
            in facility upgrades and an additional $156,000 in contributions to improvements
            to Campbell Field. Staff has some ideas for Campbell Field that would include
            removal of the underutilized ball fields and the replacement of the playground.
            We also would recommend installing a significant number of trees to create a
            forested-look for the park. The park would function as a gathering space for
            neighborhood and family events. The one remaining field could be converted to
            accommodate softball, as well. Staff believes that the current softball team that
            uses the field can be accommodated at other fields in the city. We will spend time
            this fall/winter seeking neighborhood input as well as gathering costs.
        b. We are seeking permission to award the construction contract for the convention
            center to Clark Construction. The construction budget came in at the planned
            $17.2 Million. The total project cost would be approximately $19.4 Million. Jeff
            Salowitz from Construction Simplified will be in attendance to answer any
            questions.
        c. We are seeking approval of a DDA liquor license for the LC walker Arena. It was
            recently brought to our attention from the LCC that the city should have this form
            of license rather than an event center license. The new license will provide more
            flexibility to have daily activities in the arena, including bars/restaurants and
            convention center related activities.
        d. Approval of the recreational marihuana regulatory ordinance. This ordinance is
            necessary if the city does not opt out of recreational use. Staff is recommending
            that we not opt out. Further, as you will see below, we are recommending that
            the current medical district by adjusted to allow for recreational businesses in the
            same geographical footprint.
        e. Approval of an amendment to the Medical Marihuana Facilities Overlay District to
            allow for recreational facilities as well. This was approved at the Planning
            Commission level with one dissenting vote.

Let me know if you have any questions/comments/concerns

Frank
                     Agenda Item Review Form
                      Muskegon City Commission

Commission Meeting Date: 9/24/19                  Title: Approval of Minutes

Submitted By: Ann Marie Meisch, MMC               Department: City Clerk

Brief Summary: To approve the minutes of the September 9, 2019 Worksession meeting and the
September 10, 2019 Regular Meeting.




Detailed Summary: N/A




Amount Requested: N/A                            Amount Budgeted: N/A

Fund(s) or Account(s): N/A                       Fund(s) or Account(s): N/A

Recommended Motion: To approve the minutes.




For City Clerk Use Only:


Commission Action:
                                     CITY OF MUSKEGON
                               CITY COMMISSION WORKSESSION

                                    Monday, September 9, 2019
                                            5:30 p.m.
                                    City Commission Chambers

                                              MINUTES

Present: Mayor Gawron, Commissioners Warren, Turnquist, Hood, Johnson, German, and
Rinsema-Sybenga.

Absent: None.

PILOT - Samaritas - Planning Department
Samitas is proposing an affordable housing development at 4 W. Webster Avenue and is
requesting a Payment in Lieu of Taxes for the project. The development will include 53
residential for seniors and a 900 square foot commercial space on their first floor. A service
charge of 4% will be imposed, as well as a municipal services fee of 2%.

Income targeting is based on 10 units at 30% AMI (Area Median Income); 9 units at 40% AMI; 1
unit at 50% AMI, 17 units at 60% AMI; and 16 units at 80% AMI. The project will have eight
project-based vouchers for residents age 55 and over.

James Gilbert of Samaritas attended the Work Session meeting and presented a power point
presentation.

The City Commission will consider this request at their September 10, 2019 Commission
Meeting.

AmeriBank RFP Recommendation - Economic Development
Staff has reviewed proposals from developers for 880 First and have selected a preferred
developer in 880 First Street, LLC, a partnership of Ferguson Development and Brianna Scott.

Brianna Scott and Joel Ferguson along with the project manager and other team members were
present to answer questions of the Commission.

The City Commission will consider this request at their September 10, 2019 Commission
Meeting.

Establish Policy, Application, and Fees for Block Parties - Planning
Staff is seeking to establish a policy, application, and fees to allow for block parties, closing city
streets, to encourage neighborhood cohesion while placing reasonable restrictions to ensure
safety and minimize risk for complaints.

Staff recommends establishing a block party policy, block party application, and associated
fees. A $50 application fee is being recommended. A $100 cleaning fee will be charged to the
applicant if city property is not returned to its original condition and/or trash is left on city
property.
                                                1 of 3
City Commissioners asked question of LeighAnn Mikesell of Planning. Commissioner Warren
would like to see the proposed ordinance to be modified to include October 31st. Several other
changes were suggested. Several Commissioners suggested that staff move slowly with the
proposed policy.

Amendment to Vacant Building Ordinance, Modify Fees - Planning
Amend Section 10-107 of the City Code of Ordinances to require seasonal homes to be
registered with the Public Safety Division, allow additional circumstances for waiving vacant
building fees, and eliminate additional fees being applied when registration fees are not paid.
Staff is also seeking approval of modification to Vacant Building Registration Fees for buildings
zoned for Residential use and for buildings zoned for Commercial or Industrial Use.

The request is to amend Section 10-107 of the City Code of Ordinances to modify which
buildings must be registered and the process and circumstances for waiving fees. The
amendment would require seasonal homes to be registered with the Public Safety Division,
allow additional circumstances for waiving vacant building fees, and eliminate additional fees
being applied when registration fees are not paid. Staff is also seeking approval of modification
to Vacant Building Registration Fees for building zone for Residential use and for buildings
zoned for Commercial or Industrial Use. No fees will be charged until the building has been
vacant for one year. The fee for residential use is $100 per year and Commercial or Industrial
Use for $500 per year.

The City Commission will consider this request at their September 10, 2019 City Commission
Meeting.

Beach Street 2020 Construction - DPW
DPW Director Leo Evans presented an overview of the work planned for Beach Street during
the 2020 construction season with emphasis on the proposed operational changes and timing.

Ordinance Amendment to Prohibit Smoking at All Parks & Downtown Business District -
DPW
A first draft of a potential ordinance revision to ban smoking at all public parks, beaches, trails,
and potentially on streets in the core downtown area was presented. Restrictions include bike
paths, trails and pathways, or any area used for a community event within the City boundaries.
The proposed ordinance includes banning smoking in the core downtown areas bounded by
Shoreline Drive heading easterly from Seventh Street to Spring Street, heading southerly on
Spring Street from Shoreline Drive to Apple Avenue, heading westerly on Apple Avenue from
Spring Street to Muskegon Avenue, heading westerly on Muskegon Avenue from Apple Avenue
to Ninth Street, and heading northerly on Ninth Street to Western Avenue, heading westerly on
Western Avenue from Ninth Street, heading northerly on Seventh Street from Western Avenue
to Shoreline Drive; and on Third Street from Merrill Avenue to Muskegon Avenue.

The majority of the Commission indicated they were against banning smoking downtown. The
ordinance will be changed based on the conversations and presented at a later date.

Signal Warrant Analysis - DPW
Staff is reporting they would like to remove three traffic signals under the City’s jurisdiction. They
are located at Sherman & Wickham, Webster & Pine, and Wood & Irwin.

                                                2 of 3
This item will be placed on the September 10, 2019 City Commission Meeting for consideration
by the City Commission.

Update on Convention Center
Frank Peterson gave an update on the funding for the Convention Center. Many contracts for
work have been issued.

Adjourned at 8:30 pm.


                                                     Respectfully Submitted,



                                                     Ann Marie Meisch, MMC – City Clerk




                                            3 of 3
     CITY OF MUSKEGON
       CITY COMMISSION MEETING
       SEPTEMBER 10, 2019 @ 5:30 P.M.
   MUSKEGON CITY COMMISSION CHAMBERS
  933 TERRACE STREET, MUSKEGON, MI 49440


                                 MINUTES

The Regular Commission Meeting of the City of Muskegon was held at City Hall,
933 Terrace Street, Muskegon, MI at 5:30 p.m., Tuesday, September 10, 2019,
Deacon William Cook, St. Mary’s of the Immaculate Conception, opened the
meeting with prayer, after which the Commission and public recited the Pledge
of Allegiance to the Flag.
ROLL CALL FOR THE REGULAR COMMISSION MEETING:
Present:    Mayor Stephen J. Gawron, Vice Mayor Eric Hood, Commissioners
Byron Turnquist, Ken Johnson, Debra Warren, Dan Rinsema-Sybenga, and Willie
German, Jr., City Manager Frank Peterson, City Attorney John Schrier, and City
Clerk Ann Meisch.
HONORS AND AWARDS:
   A. Certificate of Recognition for John and Angie King
Commissioner Willie German, Jr. presented John and Angie King with a
Certificate of Recognition, on behalf of the City Commission, in recognition of
the years of commitment to the youth in the community relative to the Port City
Football Program.
PUBLIC COMMENT ON AGENDA ITEMS:             Public comments were received.
2019-71     CONSENT AGENDA:
   A. Approval of Minutes     City Clerk
SUMMARY OF REQUEST: To approve the minutes of the August 27, 2019 Regular
Meeting.
STAFF RECOMMENDATION:         Approval of the minutes.
   B. MUPD Radar Message Trailer     Public Safety/MUPD
SUMMARY OF REQUEST: Seeking City Commission authorization for the purchase
of a Speed Alert Radar Message Trailer to provide drivers with speed feedback,

                                        Page 1 of 7
messages specific to vehicle speeds, or dedicated messages. This is a versatile
tool for both traffic calming and messaging.
STAFF RECOMMENDATION:             To approve the purchase of a Speed Alert Radar
Message Trailer from All Traffic Solutions for $15,985.00.
   C. Increase in General Fund Transfer to LC Walker Arena Fund and Farmers
      Market/Kitchen 242 Fund       Finance
SUMMARY OF REQUEST: The LC Walker Fund and the Farmers Market/Kitchen
242 Fund required a larger transfer from the General Fund then what was
budgeted to prevent a deficit. Increases are needed of $50,000 and $15,000 for
LC Walker Arena Fund and Farmers Market/Kitchen 242 Fund respectively.
Based on the financial results for the fiscal year ended June 30, 2019, the LC
Walker Arena and Farmers Market/Kitchen 242 Fund required a larger transfer
from the General Fund then what was budgeted for in the 3rd quarter reforecast,
to prevent a fund deficit. The LC Walker Fund needs to be increased from
$425,000 to $475,000 and the Farmers Market/Kitchen 242 Fund needs to be
increased from $20,000 to $35,000.
STAFF RECOMMENDATION:           To approve the increase to the General Fund
transfers for the LC Walker Arena to $475,000 and Farmers Market/Kitchen 242
fund to $35,000.
   D. Updates to MERS Defined Contribution Plan Adoption Agreements
      Finance
SUMMARY OF REQUEST: MERS of Michigan has requested we update our
Defined Contribution Plan Adoption Agreements to ensure MERS has the correct
information regarding what is included and excluded for MERS wage
calculations.
After an audit conducted by MERS of our payroll system it was discovered that
MERS needed many updates to our Plan Adoption Agreements for our Defined
Contribution groups.
STAFF RECOMMENDATION:        To approve the updates to the MERS Defined
Contribution Plan Adoption Agreements.
   E. Update to MERS Defined Benefit Plan Adoption Agreement – Command
      Finance
SUMMARY OF REQUEST: Per the 2019-2022 Police Command contract, overtime
pay is included in calculating MERS wages beginning January 1, 2019, this
change requires an update to our MERS Plan Agreement.
After an audit was conducted by MERS of our payrolls system it was discovered
that we need to update many of our Plan Agreements for changes made per
union agreements, or for policy/procedures not communicated to MERS in the
past. The current Police Command contract calls for overtime wages to be

                                        Page 2 of 7
included in the MERS wage calculation beginning January 1, 2019. This change
requires an update to the Plan Adoption Agreement.
STAFF RECOMMENDATION:        To approve the update to the MERS Plan
Adoption Agreement for Police Command to include overtime pay in MERS
wage calculation.
   F. MDNR Urban Forestry Grant      DPW
SUMMARY OF REQUEST: Staff is seeking approval to apply for an Urban Forestry
Grant from the Michigan Department of Natural Resources. If awarded, the
grant would be used to complete an inventory of the existing street and park
trees within the City of Muskegon, to prepare an urban tree canopy analysis,
and to develop a long-range plan for the management and development of
the urban forest within the City of Muskegon.
STAFF RECOMMENDATION:         Authorize staff to apply for an MDNR Urban
Forestry Grant and commit to providing matching funds for the grant
application of up to $20,000.
   G. Prein & Newhof Lakeshore Drive Amendment #1 DPW
SUMMARY OF REQUEST: A number of items were added to the Lakeshore Drive
Project that were not included in the original scope of work, including
replacement of two water mains and additions to streetscaping, causing an
increase in engineering services.
During design of the project at the request of the City a number of items were
added to the project that were not included in the original scope of work. The
largest of these items was the addition of replacement of the two existing 100+
year old water mains. A number of other additions to the streetscape work were
added relative to the project. The 18-19 budget included $200,000 in the water
fund budget to cover these additional costs. The unused portion of the 18-19
budget will be carried forward to the 19-20 budget in a future reforecast. The
major street fund budget between 18-19 and 19-20 fiscal years budgeted to
cover the other increases relative to the changes in the streetscape. The overall
Engineering Services charge for this $6.1 Million project stands at 11% with
inclusion of this amendment which is a lower overall rate than other comparable
projects.
STAFF RECOMMENDATION:          Authorize staff to sign Amendment #1 to the
Professional Services Agreement with Prien & Newhof for the Lakeshore Drive
project in the amount of $279,000.
   H. Pavement Warranty Resolutions         DPW
SUMMARY OF REQUEST: Resolutions to adopt and implement pavement
warranty guidelines are a requirement of MCL 247.663. The proposed resolutions
are as recommended for adoption by MDOT and the Michigan Municipal


                                        Page 3 of 7
League. Adoption of the guidelines is required prior to September 18, 2019.
STAFF RECOMMENDATION:         Authorize the Mayor and Clerk to sign the
resolutions to adopt and implement the pavement warranty guidelines as
required by law.
   I. Amendment to Vacant Building Ordinance and Vacant Building
      Registration Fees Planning Department
SUMMARY OF REQUEST: Amend Section 10-107 of the City Code of Ordinances
to require seasonal homes to be registered with the Public Safety Division, allow
additional circumstances for waiving vacant building fees, and eliminate
additional fees being applied when registration fees are not paid. Staff is also
seeking approval of modification to Vacant Building Registration Fees for
buildings zoned for Residential Use and for buildings zoned for Commercial or
Industrial Use.
To amend Section 10-107 of the City Code of Ordinances to modify which
buildings must be registered and the process and circumstances for waiving
fees. The amendment would require seasonal homes to be registered with the
Public Safety Division, allow additional circumstances for waiving vacant
building fees, and eliminate additional fees being applied when registration fees
are not paid. Staff is also seeking approval of modification to Vacant Building
Registration Fees for building zoned for Residential use and for buildings zoned
for Commercial or Industrial Use. No Fees will be charged until the building has
been vacant for one year.
Vacant Building Zoned for Residential Use - $100 per year
Vacant Building Zoned for Commercial or Industrial Use - $500 per year
STAFF RECOMMENDATION:        To approve the amendments to Section 10-107 of
the City Code of Ordinances and to approve the modification of Vacant
Building Registration Fees.
Motion by Commissioner Johnson, second by Commissioner German, to accept
the consent agenda, as presented, minus items J and K.
ROLL VOTE: Ayes: Rinsema-Sybenga, Turnquist, Johnson, Gawron, Hood,
           Warren, and German
            Nays: None
MOTION PASSES
2019-72   ITEMS REMOVED FROM CONSENT AGENDA:
   J. LC Walker Arena Restroom Renovations             City Manager
SUMMARY OF REQUEST: City staff is requesting approval of the proposal to
undertake significant upgrades to the arena restrooms. The upgrades will
include relocating the Western Avenue restrooms to the alley side of the

                                         Page 4 of 7
concourse.
As part of our effort to better utilize the LC Walker Arena’s Western Avenue
frontage, we are relocating the restrooms to the alley side of the building. The
DDA completed a $1 Million transfer to the Public Improvement Fund in FY 18-19;
$250,000 was allocated to the restroom relocation. All costs above $250,000 will
be absorbed by the Public Improvement Fund.
Staff received two bids for this project; which included construction of the new
restaurant along Western Avenue. Platinum Contracting submitted the lowest
bid. Platinum’s bid of $407,767.66 was 46% less then J.J. Veneklasen’s bid of
$763,250.00
Platinum’s original bid allocated $233,214.07 to the restroom portion of the
project. After a number of changes to the construction scheduling and
finishes/products, we settled on a project cost of $246,925.92. Staff is requesting
15% contingency and soft cost budget (unforeseen changes, architect, etc.)
STAFF RECOMMENDATION:          Accept the bid from Platinum Construction in the
amount of $246,925.92 and further authorize a contingency and soft-costs
budget for the project equal to 15% of construction costs, with a total project
not to exceed amount of $284,000.
Motion by Commissioner Warren, second by Commissioner Rinsema-Sybenga,
to accept the bid from Platinum Construction in the amount of $326,925.92 and
further authorize a contingency and soft-costs budget for the project equal to
15% of construction costs, with a total project not to exceed amount of $284,000.
ROLL VOTE: Ayes: Turnquist, Johnson, Gawron, Hood, Warren, German, and
           Rinsema-Sybenga
             Nays: None
MOTION PASSES
   K. AmeriBank RFP Recommendation            Economic Development
SUMMARY OF REQUEST: Staff has reviewed proposals from developers for 880
First Street and have selected a preferred developer in 880 First Street LLC, a
partnership of Ferguson Development and Brianna Scott.
STAFF RECOMMENDATION:            To endorse the development proposal submitted
by 880 First Street, LLC and allow staff to negotiate and execute a development
agreement.
Motion by Commissioner German, second by Commissioner Johnson, to
endorse the development proposal submitted by 880 First Street, LLC and allow
staff to negotiate and execute a development agreement.
ROLL VOTE: Ayes: Johnson, Gawron, Hood, Warren, German, Rinsema-Sybenga.
           and Turnquist

                                          Page 5 of 7
            Nays: None
MOTION PASSES
2019-73     NEW BUSINESS:
   A. PILOT – Samaritas Planning Department
SUMMARY OF REQUEST: Samaritas is proposing an affordable housing
development at 4 W Webster Avenue and is requesting a Payment in Lieu of
Taxes (PILOT) for the project. The development will include 53 residential for
seniors and a 900 square foot commercial space on the first floor. A service
charge of 4% will be imposed, as well as a municipal services fee of 2%.
There will be 53 one-bedroom units. Income targeting is based on 10 units at 30%
AMI (Area Median Income); 9 units at 40% AMI; 1 unit at 50% AMI, 17 units at 60%
AMI; and 16 units at 80% AMI. The project will have eight project-based vouchers
for residents age 55 and over.
STAFF RECOMMENDATION:         To approve the Contract for Housing Exemption
and the Municipal Services Agreement with Samaritas and to authorize the
Mayor and Clerk to sign both.
Motion by Commissioner Warren, second by Commissioner German, to approve
the Contract for Housing Exemption and the Municipal Services Agreement with
Samaritas and to authorize the Mayor and Clerk to sign both.
ROLL VOTE: Ayes: Gawron, Hood, Warren, German, Rinsema-Sybenga,
           Turnquist, and Johnson
            Nays: None
MOTION PASSES
ANY OTHER BUSINESS: Updates were provided to the City Commission on some
items.
PUBLIC COMMENT ON NON-AGENDA ITEMS:                    Public Comments were
received.
2019-74     CLOSED SESSION:
   A. Attorney/Client Privileged Communication
Motion by Commissioner Rinsema-Sybenga, second by Vice Mayor Hood, to go
into Closed Session for the purpose of discussing Attorney/Client privileged
communication.
ROLL VOTE: Ayes: Warren, German, Rinsema-Sybenga, Turnquist, Johnson,
           Gawron, and Hood
            Nays: None
MOTION PASSES

                                         Page 6 of 7
Motion by Commissioner Rinsema-Sybenga, second by Vice Mayor Hood, to
return to open session.
MOTION PASSES
ADJOURNMENT: The City Commission meeting adjourned at 8:20 p.m.


                                 Respectfully Submitted,




                                 Ann Marie Meisch, MMC – City Clerk




                                    Page 7 of 7
                     Agenda Item Review Form
                      Muskegon City Commission

Commission Meeting Date: 9/24/2019                    Title: Financial Policy Update

Submitted By: Sarah Petersen                          Department: Treasurer

Brief Summary: To update the Poverty Exemption Income Guidelines used to determine poverty
tax exemptions.

Detailed Summary: In recent years, the State of Michigan has undertaken significant Property
Assessing Reform in an effort to ensure high quality assessments for taxpayers and local units.
One of the many reforms is a mandatory AMAR (Audit of Minimum Assessing Requirements) to be
conducted every five years in each local unit. The local units in the County of Muskegon are
scheduled to receive their AMAR in 2020.
As part of our efforts to ensure we are complying with all State requirements for the AMAR, we
reviewed our Poverty Exemption Policy with our assessor of record, Donna VanderVries, and
determined changes to the policy were necessary. On page 25 of the attached Financial Policies,
in the Poverty Exemption Income Guidelines, the requirements of items 7) and 8) do not comply
with state regulation and must be removed from the policy. Also, for item 2), we cannot require the
taxpayer to provide the property tax credit returns. The State Tax Tribunal has ruled that we
cannot go above what the state statute dictates, and each of these requirements are considered to
be beyond the limits of the statute.
On the advice of Muskegon County Equalization Director Donna VanderVries, we are requesting
that you update item 2) and eliminate items 7) and 8) from the current Poverty Exemption Income
Guidelines in the City’s Financial Policies.

Amount Requested: N/A                               Amount Budgeted: N/A

Fund(s) or Account(s): N/A                          Fund(s) or Account(s): N/A

Recommended Motion: To approve the updated Poverty Exemption Income Guidelines in the City
of Muskegon’s Financial Policies as presented in the attached Financial Policies document.

For City Clerk Use Only:


Commission Action:
          CITY OF MUSKEGON FINANCIAL POLICIES

INTRODUCTION                                                                  2

I. OPERATING BUDGET POLICY                                                    2

II. CAPITAL IMPROVEMENTS POLICY                                               3

III. REVENUE POLICY                                                           3

IV. FUND BALANCE POLICY INCLUDING GASB STATEMENT 54 POLICIES                  3

V. ACCOUNTING, AUDITING, AND FINANCIAL REPORTING POLICY                       4

VI. DEBT POLICY                                                               5

VII. FIXED ASSETS CAPITALIZATION AND DEPRECIATION POLICY                      6

VIII. LIABILITY INSURANCE CLAIM SETTLEMENTS                                   6

IX. POLICY FOR ADJUSTING UNCOLLECTIBLE ACCOUNTS                               7

X. POLICY FOR ADJUSTING DELINQUENT REAL & PERSONAL PROPERTY TAXES             7

XI. INVESTMENT POLICY                                                         8

XII. PETTY CASH USES AND LIMITS                                              10

XIII. PROCEEDS FROM SALE OF CITY-OWNED REAL ESTATE                           10

XIV. PROCUREMENT CARD PROGRAM POLICY                                         11

XV. ELECTRONIC PAYMENTS                                                      13

XVI. ACCEPTANCE OF CREDIT CARD PAYMENTS                                      13

XVII. TRAVEL POLICY AND GUIDELINES                                           13

XVIII. CELL PHONE POLICY                                                     16

XIX. CASH HANDLING POLICY FOR DEPARTMENTS ACCEPTING PAYMENTS FROM CITIZENS   16

XX. ACCOUNTS PAYABLE                                                         17

XXI. ACCOUNTS RECEIVABLE AND BANKRUPTCY                                      17

XXII. PAYROLL                                                                19

XXIII. SOCIAL SECURITY NUMBER PRIVACY POLICY                                 19

XXIV. WATER AND SEWER POLICIES                                               22

XXV. POVERTY EXEMPTION INCOME GUIDELINES                                     25

XXVI. INCOME TAX POLICIES                                                    26
INTRODUCTION
The financial policies presented here set forth the basic policy framework for the financial
management of the City of Muskegon. Many of the policies represent long-standing principles,
practices, or traditions that have guided the City in the past. They have been brought together in
one place to ensure their consistency and to provide Commission and staff a comprehensive
reference document for current and future decision-making. While these policies are intended to
provide continuity within a constantly changing environment, it is also intended that they be
reviewed regularly and amended as needed.


I. OPERATING BUDGET POLICY
The City shall adhere to the requirements of the State of Michigan “Uniform Budget Act” (P.A. 621
of 1978, as amended).
The budget shall be balanced by Fund. Budgeted expenditures of each fund will be less than or
equal to the sum of projected fund balance at the beginning of the fiscal year and all revenues
which reasonably can be expected to be received during the fiscal year. It will be the annual goal
of the City to match current operating expenditures with current operating revenues for each fund.
Where this is not possible due to economic downturn or other factors, the “operating deficit” (i.e.
operating revenues less operating expenditures) will be clearly highlighted.
Budgets will be adopted on a basis of accounting consistent with generally accepted accounting
principles.   Revenues are budgeted when they become measurable and available and
expenditures are charged against the budget when they become measurable, a liability has been
incurred, and the liability will be liquidated with current resources.
The budget shall be adopted through a “Resolution of Appropriation.” Appropriations will be made
at the departmental or project level for the General Fund Budget and at the fund level for all other
budgets. The level of formal appropriation will constitute the “appropriation center” for each fund
as defined in the state Uniform Budget Act. Transfers of budgeted funds between appropriation
centers will require the formal approval of the City Commission.
The City Manager and City Department Heads are authorized to transfer line-item budget
amounts within appropriation centers. Budget transfers between appropriation centers or
changes to appropriation center totals require formal amendment by the City Commission, which
may be done at any time during the budget year.
Budgets will be carefully monitored throughout the year. Each quarter the budget together with
the policies and priorities on which it is based will be thoroughly reviewed by the City Manager to
determine whether changes are necessary. An amended budget reforecast will be presented to
the City Commission based on this review.
Department Heads are authorized to reallocate budgeted positions between activities under their
jurisdiction; however, new positions may only be created with approval of the City Manager and
within the budgetary authority approved by the City Commission.
All operating funds of the City are subject to the annual budget process and will be reflected in the
annual budget document with the exception of certain “pass-through” funds (such as the current
tax fund), trust and agency funds, funds having a separate fiscal year (e.g. CDBG), and non-
recurring project and grant funds for which a budget shall be adopted at the time the project is
approved.
The enterprise fund and internal service fund operations of the City are intended to be fully self-
supporting, i.e. current revenues will cover current expenditures, debt service, and capital costs.
The City’s budget will portray both direct and indirect costs of programs whenever practical.
As permitted by state law (P.A. 30 of 1978), the City will fund and maintain a separate Budget
Stabilization Fund for the purpose of ensuring that adequate funding is available to maintain levels
of municipal services in the event of a major revenue loss.


CONTINGENCY ACCOUNT
A “contingency” line-item will be included in the General Fund Budget for unforeseen operating
expenditures. The amount of the contingency account will not exceed five percent (5%) of total
budgeted expenditures. If in a given year it is determined that other budgeted operating funds
require a contingency line-item, the same policy will be followed for these funds.


II. CAPITAL IMPROVEMENTS POLICY
A capital improvement program (CIP) will be developed for a period of five years. The CIP will
outline and prioritize all proposed capital projects, including land acquisitions, land improvements,
construction projects and equipment purchases having estimated costs over $50,000 and useful
lives of four or more years. As resources are available, the most current year of the CIP will be
incorporated into the current year of the City’s operating budget. The CIP will be reviewed and
updated annually prior to the beginning of the operating budget cycle.


III. REVENUE POLICY
The City will strive to maintain a diversified and stable revenue system to shelter it from short-run
fluctuations in any one revenue source. The revenue mix should combine elastic and inelastic
revenue sources to minimize the effect of an economic downturn.
The City will estimate its annual revenues using the best information available.
The City will establish all user charges at a level related to the cost of providing the services and
will annually revise user fees (with review by the City Commission) to adjust for the effects of
inflation, program changes or other factors.
The City will set fees and user charges for each enterprise fund, such as the Water Fund and
Sewer Fund, at a level that fully supports the total direct and indirect costs of the activity. Costs
shall include the cost of annual depreciation of capital assets.
The City will set fees for other user activities, such as recreation services, at a level to support the
direct and appropriate indirect costs of the activity.
The City will aggressively pursue collections of delinquent accounts receivable utilizing
appropriate legal means (including outside collection agents) to enforce payment of amounts
owed.


IV. FUND BALANCE POLICY INCLUDING GASB STATEMENT 54 POLICIES
Fund balance is an important indicator of the City’s financial position. Maintaining reserves is
considered a prudent management practice. Adequate fund balances are maintained to allow the
City to continue providing services to the community in case of unexpected emergencies or
requirements and/or economic downturns.


GENERAL FUND
It will be the City’s policy to maintain an unassigned General Fund fund balance equal to at least
thirteen percent (13%) of total actual General Fund Revenues for the preceding year. This level
of fund balance is consistent with the municipal fiscal stress indicator system used by the
Michigan Department of Treasury to monitor the financial health of local units.
FUND BALANCE REPORTING IN GOVERNMENTAL FUNDS
Fund balance will be reported in governmental funds under the following categories using the
definitions provided by GASB Statement No. 54:

Nonspendable fund balance – includes amounts that cannot be spent because they are either
(a) not in spendable form or (b) legally or contractually required to be maintained in-tact.

Nonspendable amounts will be determined before all other classifications and consist of the
following items (as applicable in any given fiscal year):

     The City will maintain a fund balance equal to the balance of any long-term outstanding
        balances due from others (including other funds of the government)

     The City will maintain a fund balance equal to the value of inventory balances and prepaid
        items

     The City will maintain a fund balance equal to the corpus (principal) of any permanent funds
        that are legally or contractually required to be maintained in-tact

     The City will maintain a fund balance equal to the balance of any land or other nonfinancial
        assets held for sale

Restricted fund balance – includes amounts that can be spent only for the specific purposes
stipulated by the constitution, external resource providers, or through enabling legislation.

Committed fund balance – includes amounts that can be used only for the specific purposes
determined by a formal action of the government’s highest level of decision-making authority.

Commitments will only be used for specific purposes pursuant to a formal action of the City
Commission.

Assigned fund balance – includes amounts intended to be used by the government for specific
purposes but do not meet the criteria to be classified as restricted or committed. In governmental
funds other than the general fund, assigned fund balance represents the remaining amount that is
not restricted or committed.

The City Commission delegates to the City Manager the authority to assign amounts to be used
for specific purposes. Such assignments cannot exceed the available (spendable, unrestricted,
uncommitted) fund balance in any particular fund.

Unassigned fund balance – includes the residual classification for the government’s general
fund and includes all spendable amounts not contained in the other classifications. In other funds,
the unassigned classification should be used only to report a deficit balance from overspending for
specific purposes for which amounts had been restricted, committed, or assigned.


BUDGET STABILIZATION FUND
The City will continue to maintain on its books a budget stabilization fund (as originally created
under PA 30 of 1978). However, for year-end reporting purposes (in accordance with
requirements of GASB 54), the City’s budget stabilization fund will be reported as an assigned
fund balance of the general fund for the purpose of public improvements.
.
V. ACCOUNTING, AUDITING, AND FINANCIAL REPORTING POLICY
The City will establish and maintain those funds required by law and sound financial
administration. Only the minimum number of funds consistent with legal and operating
requirements will be established, however, because unnecessary funds result in inflexibility,
undue complexity, and inefficient financial administration.
An independent full scope audit of all City funds will be performed on an annual basis. Selection
of the independent auditor will be made by the City Commission.
The City will prepare a Comprehensive Annual Financial Report (CAFR) in accordance with
Generally Accepted Accounted Principles (GAAP) as outlined by the Governmental Accounting
Standards Board (GASB). It will be the City’s goal to complete the annual audit and prepare the
CAFR within 120 days of the end of the fiscal year.
The City shall submit annually its CAFR to the Certificate of Achievement for Excellence in
Financial Reporting Program sponsored by the Government Finance Officers Association.
Recommendations made by GFOA reviewers shall be incorporated into the City’s CAFR for the
subsequent year.


VI. DEBT POLICY

EXTERNAL DEBT
The City of Muskegon will not use long-term debt to finance current operations.
The City of Muskegon will follow a policy of full disclosure and report all material facts about its
financial condition in a timely manner.
The retirement of bonds issued by the City (or its component units and authorities) will be equal to
or less than the useful life of the project being funded.
Whenever possible the City of Muskegon (including its authorities) will limit its issuance of debt to
a maximum of $10 million per calendar year to maintain the yield advantages associated with
bank qualified obligations.
The City will structure bond issues to maintain level or decreasing debt service schedules and
maintain debt service payments as a predictable and manageable part of the operating budget.
“Pay-As-You-Go” financing will be used when practical. However, when the City utilizes long-term
debt financing it will ensure that the debt is financed soundly by:
    •   Conservatively projecting revenue sources that will be utilized to repay the debt.
    •   Financing the improvement over a period not greater than the useful life of the
        improvement, and
    •   Determining that the benefits to be derived outweigh the total costs (including interest
        costs) of the project.
Capital lease, certificates of participation, and lease-purchase financing will be treated as debt
financing and be subject to the same policies.
The City will award sale of its bonds to the responsible bidder whose bid produces the lowest “true
interest cost” (TIC) to the City over the life of the bond issue.
The City (and its Authorities) will normally issue debt through a competitive process in which
formal bids will be solicited from as many interested parties as possible. Under some
circumstances, it is in the City’s best interest to issue debt through a negotiated sale process
instead of using a competitive process. The negotiated sale process will only be used when: 1)
the nature of the debt issue is unique and requires particular skills from the investment banks
involved, 2) the interest rate environment or other economic factors that may affect the issue are
particularly volatile and the negotiated sale process can provide needed stability or, 3) the debt
issue is bound by a closing deadline. In all cases where the negotiated process is utilized, the
underwriter/manager will be selected by a competitive review of their fees, qualifications, and
recent performance.


INTERFUND LOANS
In some situations it may be cost effective to loan money from one City fund to another in lieu of
borrowing from external sources. Such interfund loans may only be made with formal approval of
the City Commission including establishment of a fixed repayment schedule. Interest on interfund
loans will be charged at the rate then available on U.S. Treasury notes having a comparable
maturity.


VII. FIXED ASSETS CAPITALIZATION AND DEPRECIATION POLICY

CAPITALIZATION THRESHOLDS
Fixed assets are assets of a long-term character (i.e. a minimum useful life of two years) which
are intended to continue to be held and used, such as land, buildings, improvements other than
buildings, machinery, vehicles and equipment. This policy is intended to establish guidelines for
accounting for, capitalizing and depreciating fixed assets held by the various City funds.

Category Capitalization Threshold (Unit Cost)
Land $ N/A
Land Improvement 10,000
Buildings 10,000
Equipment 10,000
Vehicles 10,000
Office Equipment and Furniture 10,000


Only those items having unit costs in excess of the threshold limits specified above will be
considered fixed assets for purposes of City accounting records. Fixed assets in the City’s
proprietary type funds (i.e. Enterprise, Internal Service) shall be capitalized in the year of purchase
and depreciated over their estimated useful lives. Fixed assets of all other funds shall be
maintained by the City and depreciated over their estimated useful lives and shown on the City’s
full accrual Government Wide Statement. These include certain public domain general fixed
assets consisting of improvements such as roads, bridges, curbs and gutters, streets and
sidewalks, drainage systems, and lighting systems.
General fixed assets are valued at historical cost or estimated historical cost if actual cost is not
available. Donated assets are valued at their estimated fair value on the date donated. Property
and equipment of the enterprise funds and internal service funds are carried at cost.


DEPRECIATION AND ESTIMATED USEFUL LIFE
Depreciation of Fixed Assets in the City’s Proprietary Funds shall be accomplished using the
simple straight life method. The estimated useful life of assets will be based on IRS policies, past
experience, or other reliable sources. Useful lives typically will not exceed fifty (50) years.
VIII. LIABILITY INSURANCE CLAIM SETTLEMENTS
Under the Michigan Municipal Risk Management Authority (MMRMA) program the City is self-
insured for the first $150,000 of any single liability claim. A portion of the City’s annual “premium”
paid to MMRMA is set aside in a reserve account to cover this retained risk and no disbursement
can be made from this reserve without prior authorization from the City.
When a claim is made against the City, all pertinent information is turned over to MMRMA. The
“claims adjusting” section of MMRMA then investigates the claim thoroughly and recommends a
course of action to the City (e.g. deny claim, settle for no more than X dollars, etc.).
The following policy will govern the handling of such liability claims:
    •   The City Manager or the Finance Director is authorized to approve settlements up to
        $15,000 provided that the settlement is consistent with the recommendation of the
        MMRMA.
    •   Settlements for amounts less than $15,000 which are not consistent with the
        recommendation of MMRMA may only be authorized with concurrence of the City
        Attorney and timely notification of the City Commission.
    •   Proposed claim settlements in excess of $15,000 must be reviewed and approved by the
        City Commission.



IX. POLICY FOR ADJUSTING UNCOLLECTIBLE ACCOUNTS
During the normal course of conducting its business, the City invoices outside parties for a variety
of reasons ranging from taxes, fines, or penalties to the sale of City services or goods. Most
billings are paid promptly and the majority of those that are not are ultimately collected through
discontinuance of service, use of third-party collection services, or other means. However, it is
periodically necessary to adjust the City’s receivable records by “writing-off” accounts deemed to
be uncollectible or by making an adjustment to reflect the negotiated settlement of a disputed
account.
The City’s policy for adjusting accounts receivable shall be:
    The City shall maintain in its general ledger records delinquent accounts receivables for the
    five most recent years. A reserve for estimated uncollectible accounts receivable shall be
    maintained in the general ledger. The reserve will be equal to one-half of the fund’s
    delinquent accounts receivable outstanding as of each June 30th. At the close of each fiscal
    year, the City will write-off any balances remaining uncollected that are more than five years
    old. Accounts that are written-off may be turned over to a private collection agency for
    additional collection efforts.
    For receivables under five years old preliminary authorization for adjustments or write-offs of
    individual accounts receivable for amounts not in excess of $15,000.00 may be given by the
    City Manager or other responsible official designated by the City Manager (e.g. the City
    Treasurer in the case of water bills).
    The adjustment or write-off of individual accounts receivable for amounts in excess of
    $15,000.00 shall be approved by the City Commission on an individual basis.
Adjustments to accounts receivable which are determined by the City Treasurer to be necessary
due to administrative error may be made without going through the procedure outlined above.
X.  POLICY FOR ADJUSTING DELINQUENT REAL & PERSONAL
PROPERTY TAXES
The City’s policy for adjusting delinquent personal property taxes shall be as follows:
    •   A reserve for estimated uncollectible personal property taxes shall be maintained in each
        fund having delinquent personal property tax receivables. The reserve will be equal to
        one-half of the fund’s delinquent personal property taxes outstanding as of each June
        30th.
    •   The City shall only maintain in its general ledger records delinquent personal property tax
        receivables for the two most recent years in an attempt to comply with the GASB 60 day
        rule. At the close of each fiscal year, the City will write-off any balances remaining
        uncollected that are more than two years old. Balances written off may be turned over to
        a private collection agency for additional collection efforts.
Real property taxes that become delinquent are turned over to the County treasurer for collection.
The City is generally made whole at the outset of the collection process and only “charged back”
for those taxes that remain delinquent after 2-3 years of unsuccessful collection effort. If in the
City’s judgment a delinquent account will ultimately be uncollectible through this process the City
will escrow the funds received from the County to cover an eventually charge back.



XI. INVESTMENT POLICY
The Director of Finance serves as the City’s Investment Officer as defined in Michigan Compiled
Laws (MCL) Chapter 129.91.

This Investment Policy replaces any previously dated investment policies, guidelines or lists of
authorized investments.

SCOPE
This Policy shall apply to the investment management of all financial assets under control of the
City.
To the extent practical, all excess cash, except for cash in certain restricted and special accounts,
shall be pooled for investment purposes. The investment income derived from the pooled
investment account shall be allocated to the contributing funds based upon the proportion of the
respective average balances relative to the total pooled balance. Interest earnings shall be
distributed to individual funds on a monthly basis.

OBJECTIVES
The City's principal investment objectives are (in order of importance):
  • SAFETY: Preservation of capital and protection of investment principal.
  • LIQUIDITY: Maintenance of sufficient liquidity to meet anticipated cash flows.
  • YIELD: Attainment of a market value rate of return.


PRUDENCE
The standard of prudence to be used for managing the City's assets shall be the “prudent investor
rule” which in general states that investments shall be made with the judgment and care that
under the circumstances then prevailing, persons of prudence, discretion and intelligence would
exercise in the management of their own affairs, not in regard to speculation but in regard to the
permanent disposition of their funds, considering the probable income as well as the probable
safety of their capital.

The City recognizes that no investment is totally risk less and that the investment activities of the
City are a matter of public record. Accordingly, the City recognizes that occasional measured
losses are inevitable in a diversified portfolio and shall be considered within the context of the
overall portfolio's return, provided that adequate diversification has been implemented and that the
sale of a security is in the best long-term interest of the City.

The Director of Finance and authorized investment personnel acting in accordance with written
procedures and exercising due diligence shall be relieved of personal responsibility for an
individual security's credit risk or market price changes, provided that the deviations from
expectations are reported in a timely fashion to the City Commission and appropriate action is
taken to control adverse developments.


DELEGATION OF AUTHORITY
The Director of Finance may delegate the authority to conduct investment transactions and to
manage the operation of the investment portfolio to the Assistant Finance Director and/or the City
Treasurer. No person may engage in an investment transaction except as expressly provided
under the terms of this Investment Policy.

The City may engage the support services of outside professionals in regard to its investment
program, so long as it can be clearly demonstrated that these services produce a net financial
advantage or necessary financial protection of the City's financial resources.


AUTHORIZED SECURITIES AND TRANSACTIONS
All investments of the City shall be made in accordance with MCL Chapter 129.91 - 129.96 (Act
20 of 1943). Any revisions or extensions of these sections of MCL will be deemed to be part of
this Investment Policy immediately upon being enacted.


INVESTMENT DIVERSIFICATION AND LIQUIDITY
It is the intent of the City to diversify the investments within the portfolio to avoid incurring
unreasonable risks inherent in over investing in specific instruments, individual financial
institutions or maturities. The maximum investment in each of the following categories shall not
exceed 25% of the total portfolio: Commercial Paper, Eligible Bankers Acceptances and
uninsured Certificates of Deposit.

To the extent possible, investments shall be matched with anticipated cash flow requirements and
known future liabilities. The City shall maintain at least 10% of its total portfolio in cash and/or
instruments maturing in 30 days or less.


SELECTION OF BROKER/DEALERS
Broker/dealers will be selected by the Director of Finance on the basis of their expertise in public
cash management and their ability to provide services for the City's account. Approved
broker/dealers and the firms they represent shall be licensed to do business in the State of
Michigan and as such are subject to the provisions of Michigan Statutes relating to the investment
of public funds. Broker/dealers shall attest in writing that they have received and reviewed a copy
of this Policy.

The City may purchase commercial paper, CD’s and other securities from direct issuers as long
as they meet the criteria outlined in the Authorized Securities and Transactions section of this
Policy.


SELECTION OF DEPOSITORY BANKS
Periodically, through a Request for Proposal process, the City shall select a bank to provide
checking account and other banking services for the City. To be eligible for authorization, a bank
must (1) be a member of the FDIC, (2) be eligible to be a depository of funds belonging to the
State of Michigan, (3) maintain a permanent office within the City of Muskegon and, (4) be
financially stable and sound as periodically determine through credit analysis provided through a
reputable bank rating service.

Notwithstanding provision (3) in the preceding paragraph, Time Certificates of Deposit described
in the section of this policy, “Authorized Securities and Transactions” may be purchased from
authorized banks if they meet requirements of Act 20.



SAFEKEEPING AND CUSTODY
The Director of Finance shall select a bank to provide safekeeping and custodial services for the
City. The custodian bank will be selected on the basis of its ability to provide services for the
City's account and the competitive pricing of its safekeeping related services, and shall be
financially stable and sound as periodically determined through credit analysis provided through a
reputable bank rating service.

The Director of Finance shall maintain a file of the credit rating analysis reports performed for the
custodian bank. Bank credit analysis shall be performed on a semi-annual basis.


REPORTING
Accounting and reporting on the City’s investment portfolio shall conform to Generally Accepted
Accounting Principles (GAAP) and the Governmental Accounting Standards Board (GASB)
recommended practices. On a monthly basis, the Director of Finance shall submit to the City
Commission an investment report, listing the investments held by the City, the current market
valuation of the investments and performance results. The report shall include a summary of
investment earnings during the period.


XII. PETTY CASH USES AND LIMITS
Petty cash accounts may be established in such locations and in such amounts as may be
determined necessary by the City Manager. Petty cash disbursements up to $300.00 are
permitted for the following purposes: 1) for the expedited purchase of minor goods or services, 2)
to provide immediate reimbursement to employees for travel or other costs paid out of their own
pocket in the conduct of City business and, 3) to provide immediate refunds to customers as
warranted. All uses of petty cash must be fully supported by receipts or other appropriate
documentation. Petty cash procedures shall be reviewed periodically by the City’s Finance
Department.
Employees traveling on City business may receive a petty cash travel advance of up to $300.00
from the City Treasurer’s Office to be used for travel purposes. The employee’s department head
must approve travel advances. Cash advances of more than $300.00 are discouraged and will
only be made upon written authorization of the employee’s department head and the City
manager.
In order to distinguish travel advance requests from expense reporting, while simplifying the
process to the extent possible, there is a separate form for that purpose. Please note that with
the Request for Petty Cash Travel Advance form, the requesting party must acknowledge that
receipts and any money owed the City must be returned within ten days of return from travel. If
the money and/or expense documentation is not returned, the employee authorizes the full
amount of the travel advance to be deducted from their paycheck along with a $5.00 processing
fee. The Request for Petty Cash Travel Advance forms are available through the City Treasurer’s
Office.
Note that all travel expenses should be reported on the Travel Expense Reporting Form as soon
as possible upon returning from travel. Travel Expense Reporting Forms are available on the
City’s Intranet Page.


XIII. PROCEEDS FROM SALE OF CITY-OWNED REAL ESTATE
From time to time the City sells real estate that it owns. It is City policy that, unless required by
law or by specific direction of the City Commission, proceeds from such property sales shall be
deposited to the City’s Public Improvement Fund to be used to finance general purpose capital
needs.
In the case of tax reverted property sold by the City, sale proceeds will first be used to reimburse
appropriate City funds for expenses incurred in maintaining and selling the property. Any
remaining sale proceeds will be distributed to the City and other taxing jurisdictions in the same
manner as regular property taxes.


XIV. PROCUREMENT CARD PROGRAM POLICY

GENERAL
Regular government purchasing methods, such as purchase orders, can be cumbersome and
costly in relation to the value of goods being purchased. To promote operational efficiency, the
City has adopted a procurement card purchasing program for use with small dollar value
purchases.
A number of unique controls have been developed for the procurement card program. These
controls will ensure that cards can be used only for specific purchases and within specific dollar
limits. In addition, documentation of all purchases is required by each cardholder with further
approval from the department head and the City Manager’s office before payment is made.
The unique procurement card issued by the City has the employee’s name embossed on it
together with the City’s tax-exempt status. No one other than the employee whose name is on the
card may use the card. CITY ISSUED PROCUREMENT CARDS MAY ONLY BE USED BY
DESIGNATED CITY EMPLOYEES FOR THE PURCHASE OF GOODS OR SERVICES FOR
THE OFFICIAL BUSINESS OF THE CITY OF MUSKEGON. UNDER NO CIRCUMSTANCES IS
THE PROCUREMENT CARD TO BE USED FOR PERSONAL PURCHASES.


DESIGNATION OF RESPONSIBLE OFFICIAL
The Finance Director is designated as the official responsible for overseeing compliance with this
procurement card policy including procurement card issuance, accounting for procurement card
transactions, monitoring and payment of procurement card statements.


TRANSACTION AMOUNTS
The procurement card may be used for purchases of individual items up to $2,500.00 in value.
The total monthly dollar value of transactions on each procurement card will generally be limited
to $5,000.00. The City Manager may establish higher monthly credit limits for employees whose
positions require higher than normal use of the procurement card. The total combined authorized
credit limit of all procurement cards issued by the City shall not exceed five percent of the City’s
total budget for the current year. All purchases made with a City procurement card must be fully
supported by receipts, invoices, and other documentation. Such documentation is to be attached
to the monthly procurement card statement and cardholder’s reconciliation.


CREDIT CARD REBATES/REWARDS
To the extent the City earns rebates or rewards from use of procurement cards, the rebates will
be recorded as general fund income used to offset the costs of bank service charges.


CREDIT CARD USE FOR LARGE RECURRING ITEMS
Some vendors accept credit card payment for large recurring bills such as electric bills and solid
waste collection. Since the City can earn rebates on credit card use, it may be to the City’s benefit
to pay these bills via credit card. The City manager and/or finance director will inform the City
commission of these opportunities in advance and will establish special use credit card accounts
that are electronically restricted to the specific type of transaction/vendor.


EMERGENCY TRANSACTION AMOUNTS
In the event of an extended emergency, the City Manager is authorized to establish higher
procurement card limits on a temporary basis so that City employees may procure goods and
services necessary to deal with the emergency. In no event are emergency transaction limits to
be in effect for more than thirty days.


INTEREST COSTS AND SALES TAX
It is the City’s policy to pay in full each month on or before the due date the total balance due on
its procurement cards thereby avoiding interest charges. As a municipality, the City is exempt
from payment of state sales tax. City procurement card users are expected to exercise care in
conducting transactions to ensure that they are not incorrectly charged for sales tax.


OTHER PURCHASING POLICIES
The procurement card is a supplement to other purchasing procedures such as purchase orders.
As with the other purchasing methods, the following conditions must be met when using your
procurement card.
    •   Each single purchase may be comprised of multiple items, but the total cannot exceed the
        single purchase dollar limit on your procurement card.
    •   When purchases exceed the established dollar limits, the normal procedures of using
        purchase orders must be followed unless written authorization is given by the employee’s
        department head.
    •   The least expensive item that meets your basic needs should be bought and competitive
        quotes must be obtained in accordance with existing purchasing policies.
    •   Cardholders must follow normal budgetary control procedures to ensure that sufficient
        funds are available prior to making purchase.
    •   Use of the procurement card does not relieve the cardholder from complying with Federal,
        State and City ordinances, regulations, policies and procedures.
    •   Use of the procurement card is not intended to replace effective procurement planning
        which enable volume discounts.
    •   Purchases are not to be split to circumvent procurement regulations.


RESTRICTIONS ON USE
The following list covers purchases for which procurement cards use is prohibited:
    •   Cash advances through bank tellers or teller machines.
    •   Traveler’s Checks.
    •   Purchase of gasoline or diesel fuel for City vehicles except in emergencies (use City
        pumps or Fuelman System).
    •   Purchase of items stocked in City inventory unless required in emergencies.
    •   Additional specific restrictions as deemed necessary by individual departments.


XV. ELECTRONIC PAYMENTS
Modern technology makes it possible to transfer funds electronically in lieu of issuing paper
checks. This technology offers many benefits to users including lower transaction costs, reduced
opportunities for fraud, and better cash management control. The City has effectively utilized this
technology for several years for purposes such as direct deposit of employee paychecks and
automatic payment of customers’ water bills. The City supports continued use and expansion of
electronic payments technology for payment of vendors and other uses provided appropriate
internal controls are established. The City Manager and Finance Director, in conjunction with the
City’s independent auditors, are authorized to develop the necessary procedures and controls for
expanded use of this technology in the City of Muskegon.


XVI. ACCEPTANCE OF CREDIT CARD PAYMENTS
The City has studied the costs and benefits of accepting credit card payments from customers
and has determined that credit card acceptance significantly enhances customer service and
provides administrative and other benefits to the City that outweigh the associated costs.
Accordingly, the City’s policy shall be to accept credit cards for payment of all City bills and
invoices except routine payment of property taxes. The City Treasurer or Income Tax
Administrator may permit payment by credit card for property taxes in specific collection cases
where they have determined it is in the City's best interest to do so.



XVII. TRAVEL POLICY AND GUIDELINES

SCOPE
This policy applies to all City of Muskegon elected officials, employees, board members,
volunteers and others when travelling on official City business and/or travelling at City expense.

AUTHORIZED TRAVEL
In the normal course of conducting City business, employees are required to travel for purposes
of work-related meetings, training opportunities, professional conferences, or other business
purposes. As part of the annual budget process, departments’ request funding for travel purposes
for the coming year. Department heads have full authority to approve travel for their employees
(without additional authorization) within limits of the department's approved travel budget. Travel
that is significantly beyond the parameters of the department's travel budget should be approved
by the City Manager together with a corresponding budget adjustment if required.

TRAVEL COSTS
The City recognizes that its employees are responsible adults who take the same care in incurring
travel expenses while on City business as when traveling on personal business. Accordingly, this
policy does not establish rigid cost limits for lodging, meals, or other travel costs. Instead, the
following general guidelines are offered while recognizing that special circumstances may dictate
that employees incur costs beyond these guidelines:

Lodging - Lodging costs should generally range between $75.00 - $150.00 per night depending on
location (based on single occupancy and including local taxes which the City is not exempt from).
Employees are relied upon to use their good judgment in selecting safe and economical
accommodations.

Two important factors to remember when making hotel reservations: 1) you should always ask for
special "government" rates that are typically deeply discounted from regular rates and, 2) you
should identify the travel as official City business exempt from state sales tax and inquire as to
any specific documentation requirements the hotel may have.

Costs for in-room movies, exercise rooms, or other hotel services not included in the basic room
rate are not reimbursable by the City.

Meals - Meal costs should generally not exceed $40.00 per person for each full day of travel
(including gratuities and taxes). For partial day travel or individual meal reimbursements, the
following limits will apply:

Breakfast                  $8.00                            Travel Before 8:00 AM
Lunch                      $10.00                          Travel Before 12:00 Noon
Dinner                     $22.00                           Travel Before 6:00 PM

Individual meal limits will apply regardless of whether or not reimbursement is sought for other
meals during the day. For example, it is not permissible to “skip” breakfast and lunch in order to
be reimbursed $40.00 for a dinner; instead, the dinner will only be reimbursed up to the $22.00
limit specified above. Often lunch or other meals are included in the registration price of a seminar
or conference. It is expected that employees attending these functions will partake in these
meals. The City will not reimburse meal costs if the employee chooses to forgo the conference
meal and dine elsewhere.

Transportation - Vehicle travel may be by either City vehicle or the employee's private vehicle. If a
private vehicle is used, reimbursement will be based on the number of miles traveled times the
allowable IRS business mileage rate in effect at that time. Air travel is generally used for
destinations more than 300 miles away. Employees are encouraged to take advantage of
discounted airfares and should utilize the Muskegon County Airport whenever possible.

Employees may elect to use private vehicles for travel to destinations more than 300 miles away
and will be reimbursed based on the current IRS mileage rate or equivalent round trip coach
airfare for that destination, whichever is less. However, no reimbursement will be made for added
lodging or meal costs incurred because of the extra travel time.

Employees who elect to use their own vehicle should be aware that under the laws of the State of
Michigan, every vehicle owner is required purchase insurance that is the primary coverage for that
vehicle. While using a private vehicle for City travel, any automobile liability insurance coverage in
force for the City is excess coverage only for the employee/vehicle owner.

Other Costs - Other incidental costs (such as parking, ground transport, phone calls), should not
exceed an average of $15.00 per day. Rental car costs generally will not be reimbursed by the
City as it is expected that employees will utilize lodging in close proximity to the conference or
other event. In extraordinary circumstances where the employee deems it necessary to rent a
car, reimbursement will only be made with the written authorization of the City manager.

Traveling With Spouse - There is no objection to employees inviting their spouse to travel along
on City business. However, the City will pay for none of the spouse’s travel expenses and care
should be taken to maintain separate records of the employee's reimbursable travel costs.

PAYING FOR TRAVEL COSTS
Methods available for employees to pay travel costs include the following:
City Credit Card - Employees who have been issued a City of Muskegon credit card should use it
to pay their travel costs. Additionally, in each department a credit card holder is designated to use
their card to pay for other employees' travel costs that can be readily handled in advance (e.g.
airline tickets, conference registration, hotel, etc.).

Personal Credit Card - Employees who have not been issued a City credit card may find it
convenient to pay travel costs on their own personal credit card and receive cash reimbursement
from the City.

Petty Cash Advance - Employees traveling on City business may receive a petty cash travel
advance of up to $300.00 from the City Treasurer’s Office to be used for travel purposes. The
employee’s department head must approve travel advances. Cash advances of more than
$300.00 are discouraged and will only be made upon written authorization of the employee’s
department head and the City manager.
In order to distinguish travel advance requests from expense reporting, while simplifying the
process to the extent possible, there is a separate form for that purpose. Please note that with
the Request for Petty Cash Travel Advance form, the requesting party must acknowledge that
receipts and any money owed the City must be returned within ten days of return from travel. If
the money and/or expense documentation is not returned, the employee authorizes the full
amount of the travel advance to be deducted from their paycheck along with a $5.00 processing
fee. The Request for Petty Cash Travel Advance forms are available through the City Treasurer’s
Office.
Note that all travel expenses should be reported on the Travel Expense Reporting Form as soon
as possible upon returning from travel. Travel Expense Reporting Forms are available on the
City’s Intranet Page.


REPORTING REQUIREMENTS FOR TRAVEL EXPENSE REIMBURSEMENT
Travel expense reporting has been simplified to the extent possible. The following guidelines
apply to travel expense reporting:

•   Travel expenses are to be reported on the Travel Expense Reporting Form included with this
    pamphlet as soon as possible upon returning from travel.
•   Only expenses for which cash reimbursement is sought by the employee need to be reported.
    Expenses paid in advance or expenses paid by City credit card should not be included on the
    Travel Expense Reporting Form.
•   Expenses must always be supported by receipts or other documentation.
•   If total expenses to be reimbursed are $300.00 or less, you may obtain immediate
    reimbursement from the City Treasurer's Office.
•   If total expenses to be reimbursed are more than $300.00, they will be reimbursed as a
    separately itemized, non-taxable category on the employee's regular bi-weekly paycheck.
    Accordingly, travel expense report forms must be submitted to the Finance Office with all
    necessary approvals no later than 5:00PM on the Friday prior to payday for reimbursement on
    that paycheck.
DOUBLE-DIPPING
It should go without saying that City expects honest and ethical behavior from its employees in
handling travel expense matters. Travel expenses that are partially or fully paid by outside parties
(such as federal agencies) are not to also be submitted for reimbursement from the City. Any
employee found to be deliberately misreporting travel expenses will be subject to disciplinary
action as well as potential prosecution.


LOCAL BUSINESS EXPENSES
In addition to travel expenses, it is sometimes appropriate for City employees to incur costs on
behalf of boards or committees or in the course of entertaining visiting guests. Department heads
have full authority to approve such costs (within budgetary limits) and the same general guidelines
as outlined above for employee travel expenses should be followed.



XXVIII. CELL PHONE POLICY
GOAL

It is the goal of the City to provide cellular telephones to City employees who need them to
perform the essential functions of their jobs.

SAFETY

The first concern of the City is the safety of their employees and the public. Employees should
use proper safety procedures at all times when using a cellular phone, especially while operating
equipment, driving on City business or performing similar duties. This includes pulling to the side
of the road if feasible when making or receiving a cellular phone call. Text messages under no
circumstances should be sent or viewed while driving.

POLICY

Department Heads and Supervisors may request cellular phones for employee use when the
expense and use of the phone is justifiable in terms of improved service and responsiveness to
citizens and/or other employees. Cellular phones should be provided only when they are required
for the employee to perform essential functions of his/her job. Additionally at the discretion of the
Department Head/Supervisor enhanced features or smart phones may be requested. Smart
phones or a phone with enhanced features will require an employee to share in the cost. This
amount will be determined by Finance annually. The City realizes the phone will be used for
personal use as well as City use however excessive use or abuse of the phone and/or phone
services could result in additional charges or cancellation of phone services.

It is the responsibility of the Department Head/Supervisor to review the monthly statements and
report any concerns to the Finance Department.

With approval from the City Manager and Department Head an employee may elect to use his/her
own cellular phone for City business. The phone must be fully available during the employee’s
scheduled work hours. Employees using their personal cellular phone will be reimbursed per
month for the use of their phone. This reimbursement is taxable income to the employee and the
amount will be determined by Finance annually. Certain employees who are required to have
enhanced phone features/smart phones for their job may be reimbursed at a higher rate with
approval from the City Manager.
XIX. CASH HANDLING POLICY FOR DEPARTMENTS ACCEPTING
PAYMENTS FROM CITIZENS

This policy is intended as a guide and supplement to other measures which should exist
surrounding the collection, timely deposit, and recording of collections in the records at each City
location.
For some City departments that have higher volumes of cash transactions, a cash register is used
to record receipt transactions. All transactions must be entered in the register and a receipt
must be issued to each customer. For other departments, the method for recording and
balancing is with a receipt book that has pre-numbered receipts. This method is acceptable with
the understanding that all transactions are entered, and a receipt is issued to every customer.
The pre-numbered receipt books are issued to City departments by the treasurer’s office.

City departments handling cash have starting cash, which is used for making change for their
customers.      When balancing out the daily transactions, you first remove the starting cash
amount. The receipts should offset the money (cash and checks) that you have remaining. If
this is not the case, then, you have an overage or a shortage. This must be noted on your pink
“cash-out” slip/sheet. Two signatures are required for all deposits. If a discrepancy (shortage or
overage) occurs, the department’s authorized person (usually the department head) must review
and sign the cash-out slip/sheet.

For departments that have a cash register, on a daily or other periodic basis, you should enter a
summary of the receipt transactions into the GEMS Financial System’s Cash Receipts module on
a “cash sheet” and generate a “Cash Receipts Edit” report. The “Cash Receipts Edit” report,
cash register transaction summary tape, money received, an adding machine tape and/or item
count of checks and the “cash-out” sheet should be hand delivered to the City Treasurer’s office
each day. The treasurer’s office will issue a receipt for the total amount deposited.

For departments without a cash register, on a daily or other periodic basis, you should prepare a
deposit report detailing the receipt transactions being deposited. Each deposit report includes all
pre-numbered receipt numbers used by the department since the last report, even if the receipt
was voided. The deposit report, money received, an adding machine tape and/or item count of
checks and the “cash-out” sheet should be hand delivered to the City Treasurer’s office each day.
The treasurer’s office will issue a receipt for the total amount deposited.

If assistance is needed in reference to any of the above, please contact the treasurer’s office.



XX. ACCOUNTS PAYABLE

The City fully recognizes the importance of paying its vendors and suppliers in a timely manner.
Late vendor payments result in higher costs as well as damage to the City’s reputation.
Accordingly, it is City policy to issue accounts payable (A/P) checks on the second and fourth
Fridays of each month. This cycle will ensure that (provided timely departmental approvals are
obtained) vendor payments will be made within 30 days of invoice receipt.

City departments are expected to plan their payment transactions around the regular A/P check
cycle; off-cycle A/P checks will not be permitted without the approval of the Finance Director or
Assistant Finance Director. In emergency situations where payment cannot wait for the regular
A/P check cycle, arrangements can be made with the Finance Department to electronically
transfer funds to the vendor’s account.
XXI. ACCOUNTS RECEIVABLE AND BANKRUPTCY

ACCOUNTS RECEIVABLE BILLING OUTSOURCE

The City’s Collection Agency will handle billings for the following types of invoices:

    •   Environmental
    •   Demolition and Board Ups
    •   Impounds
    •   Vacant Building

The Collection Agency will generate the initial invoice along with any follow up/delinquent notices,
pre-collection notices and collection notices. In an attempt to promote timely payment, invoices for
environmental and demolition issues paid within the first 30 days will receive a 20% discount.
These invoices will only be recorded as revenue to the City when they are paid.

Environmental Invoices can be appealed through the Planning department within 30 days from the
date of the original invoice.

ACCOUNTS RECEIVABLE PROCEDURES

Each department will input invoices through the City’s A/R system software for billing types not
handled by the Collection Agency. The Treasurer’s Office will process the Receivables every
Friday and mail out the invoices. Each department should periodically but no less than monthly
review invoices their office has initiated for payment. It is up to the individual departments to
monitor the payment of their accounts and notify the Finance Division of problems. The
Treasurer’s Office will review and turn over to the Collection Agency invoices outstanding for 90 or
more days.

LEGAL ACTION
Legal action may be used only as a last resort to collect on delinquent accounts. On the advice of
the Collection Agency it will be up to the City Treasurer and/or Income Tax Administrator / Deputy
Treasurer to determine which accounts warrant such action taking into consideration time and
added costs in collecting the delinquent account(s).

SETTLEMENTS

From time to time, debtors may want to enter into negotiations regarding their delinquent
account(s). The City Treasurer and/or Income Tax Administrator / Deputy Treasurer will have the
authority to enter into meaningful settlement negotiations with the debtor for accounts under
$15,000.

OBSERVATION OF COLLECTION LAWS
The City Treasurer and/or Income Tax Administrator / Deputy Treasurer will ensure that all
Federal, State and local laws are observed and understood by all whom engage in collection
activities on behalf of the City of Muskegon.

BANKRUPTCIES
Bankruptcy notices should always be forwarded to the Income Tax Administrator / Deputy
Treasurer, regardless of whether the department receiving the notice of bankruptcy has an
outstanding receivable balance due from the debtor or not. Other departments throughout the
City may also have business pending with the debtor and must be notified of the bankruptcy
status.
Upon receipt, the Income Tax Administrator / Deputy Treasurer will circulate a notice to various
departments which typically deal with receivable accounts and who may be maintaining a
collection account with the debtor. Departments wishing to be included in the routing on a regular
basis should contact the Income Tax Administrator / Deputy Treasurer.

If a department receives correspondence from the Income Tax Administrator / Deputy Treasurer
requesting information on outstanding debts involved in a bankruptcy, the department should
return to the Income Tax Administrator / Deputy Treasurer the requested information, with
supporting documents, within seven days of receipt. The Income Tax Administrator / Deputy
Treasurer will consolidate information from the City as a whole and prepare and file a claim on a
timely basis.

Departments utilizing an outside collection agency should notify the agency that upon receipt of a
bankruptcy notice, the agency is required to close and return the account to the City immediately.
Under no circumstances is an outside agency, such as a collection agency, to file a bankruptcy
claim on behalf of the City.

The Income Tax Administrator / Deputy Treasurer will review certain accounts that may be
forwarded to the City Attorney’s Office for consideration due to the complexity of the bankruptcy
proceeding.

Upon receipt of a bankruptcy discharge or dismissal, the Income Tax Administrator / Deputy
Treasurer will notify all departments involved.


XXII. PAYROLL

DEDUCTIONS

The City is required to make various deductions from employee paychecks for taxes, pension
contributions, union dues and other purposes mandated by law, union contracts, or terms of
employment. Additionally, the City offers a range of “voluntary” deduction programs deemed to be
of general benefit to employees. These include deferred compensation retirement savings,
additional life insurance purchase, and U.S. Savings Bonds.

From time to time, outside firms (typically offering investment and/or insurance products)
approach the City about including their programs on the City’s voluntary payroll deduction menu.
Although such programs are touted as “employee benefits having no-cost to the City”, the fact is
that these programs can entail significant costs not only for payroll administration, but also in
terms of employee time consumed in marketing or educational efforts. The City’s general policy
will be to deny such requests. However, the City may elect to implement voluntary deduction
programs it deems to be worthwhile.

DIRECT DEPOSIT

The City encourages Direct Deposit of payroll checks both as a means to improve operational
efficiency and reduce opportunities for fraud. To the extent allowed by state law, the City may
elect to mandate all employees be paid via Direct Deposit. The following polices will govern the
City’s Direct Deposit practices:

    •New employees will be given the choice of full direct deposit to one or multiple financial
       institution and/or accounts or to receive a paper check.
    •Current employees will no longer be able to choose partial direct deposit and receipt of a
       paper check.
    •Employees who currently direct deposit a portion of their payroll and receive a paper check
        will not be allowed to make any changes to their deposit accounts or amounts unless they
        are switching to full direct deposit.
    •To the extent allowed by state law, the City may elect to mandate all employees be paid via
        Direct Deposit.


XXIII. SOCIAL SECURITY NUMBER PRIVACY POLICY

Section 1. Purpose
The purpose of this policy is to protect confidential information from individuals and businesses
that have contact with the City of Muskegon.


Section 2. Definitions
(a) "Computer", "computer network", or "computer system" mean those terms as defined by the
City of Muskegon’s Information Technology Department

(b) "Mailed" means delivered by United States mail or other delivery service that does not require
the signature of recipient indicating actual receipt.

(c) "Person" means an individual, partnership, Limited Liability Company, association, corporation,
public or nonpublic elementary or secondary school, trade school, vocational school, community
or junior college, college, university, state or local governmental agency or department, or other
legal entity.
(d) "Publicly display" means to exhibit, hold up, post, or make visible or set out for open view,
including, but not limited to, open view on a computer device, computer network, website, or other
electronic medium or device, to members of the public or in a public manner.

(e) "Website" means a collection of pages of the world wide web or internet, usually in HTML
format, with clickable or hypertext links to enable navigation from 1 page or section to another,
that often uses associated graphics files to provide illustration and may contain other clickable or
hypertext links.

Section 3. Prohibited use of social security number of employee, student, or
other individual; exceptions.
(1) Except as provided in subsection (2), a person shall not intentionally do any of the following
with the social security number of an employee, student, or other individual:

(a) Publicly display all or more than 4 sequential digits of the social security number.

(b) Subject to subsection (3), use all or more than 4 sequential digits of the social security number
as the primary account number for an individual. However, if the person is using the social
security number under subdivision (c) and as the primary account number on the effective date of
this act, this subdivision does not apply to that person until January 1, 2006.

(c) Visibly print all or more than 4 sequential digits of the social security number on any
identification badge or card, membership card, or permit or license.

(d) Require an individual to use or transmit all or more than 4 sequential digits of his or her social
security number over the internet or a computer system or network unless the connection is
secure or the transmission is encrypted.
(e) Require an individual to use or transmit all or more than 4 sequential digits of his or her social
security number to gain access to an internet website or a computer system or network unless the
connection is secure, the transmission is encrypted, or a password or other unique personal
identification number or other authentication device is also required to gain access to the internet
website or computer system or network.

(f) Include all or more than 4 sequential digits of the social security number in or on any document
or information mailed or otherwise sent to an individual if it is visible on or, without manipulation,
from outside of the envelope or packaging.

(g) Subject to subsection (3), beginning January 1, 2006, include all or more than 4 sequential
digits of the social security number in any document or information mailed to a person, unless any
of the following apply:

    (i)      State or federal law, rule, regulation, or court order or rule authorizes, permits, or
             requires that a social security number appear in the document.
    (ii)     The document is sent as part of an application or enrollment process initiated by the
             individual.
    (iii)    The document is sent to establish, confirm the status of, service, amend, or terminate
             an account, contract, policy, or employee or health insurance benefit or to confirm the
             accuracy of a social security number of an individual who has an account, contract,
             policy, or employee or health insurance benefit.
    (iv)     The document or information is mailed by a public body under any of the following
             circumstances:

             (a) The document or information is a public record and is mailed in
                 compliance with the freedom of information act, 1976 PA 442, MCL 15.231 to
                 15.246
             (b) The document or information is a copy of a public record filed or recorded with a
                 county clerk or register of deeds office and is mailed by that office to a person
                 entitled to receive that record.
             (c) The document or information is a copy of a vital record recorded as provided by
                 law and is mailed to a person entitled to receive that record.

    (v)      The document or information is mailed by or at the request of an individual whose
             social security number appears in the document or information or his or her parent or
             legal guardian.

(2) Subsection (1) does not apply to any of the following:

(a) A use of all or more than 4 sequential digits of a social security number that is authorized or
required by state or federal statute, rule, or regulation, by court order or rule, or pursuant to legal
discovery or process.

(3) It is not a violation of subsection (1)(b) or (g) to use all or more than 4 sequential digits of a
social security number if the use is any of the following:

(a) An administrative use of all or more than 4 sequential digits of the social security number the
ordinary course of business, by a person or a vendor of a person or a vendor or contractor of a
person, to do any of the following:

   (i)      Verify an individual’s identity, identify an individual, or do another similar administrative
            purpose related to an account, transaction, product, service, or employment or
            proposed account, transaction, product, service, or employment.
   (ii)     Investigate an individual’s claim, credit, criminal, or driving history.
   (iii)    Detect, prevent, or deter identity theft or another crime
   (iv)    Lawfully pursue or enforce a person’s legal rights, including, but not limited to, an
           audit, collection, investigation, or transfer of a tax, employee benefit, debt, claim,
           receivable, or account or an interest in a receivable or account.
   (v)     Lawfully investigate, collect a spousal obligation or tax liability.
   (vi)    Provide or administer employee or health insurance or membership benefits, claims,
           or retirement programs.

(b) A use of all or more than 4 sequential digits of a social security number as a primary account
number that meets both of the following;

   (i)     The use began before the effective date of this act.
   (ii)    The use is ongoing, continuous, and in the ordinary course of business. If the use is
           stopped for any reason, this subdivision no longer applies.




Section 4. Privacy policy

(1) Effective January 1, 2006, all employees for the City of Muskegon are required to abide by the
Social Security Policy.

(a) All information that contains social security numbers must be handled discretely and remain
confidential

(b) Prohibits unlawful disclosure of the social security numbers.

(c) Employees will only have access to social security numbers on a need to know basis and if it
pertains the ordinary course of business.

(d) All documents that contain social security numbers must be shredded or destroyed in a
manner that information is no longer legible.

Section 5. Exemption from disclosure
All or more than 4 sequential digits of a social security number contained in a public record are
exempt from disclosure under the freedom of information act, 1976 PA 442, MCL 15.231 to
15.246, pursuant to section 13(1)(d) of the freedom of information act, 1976 PA 442, MCL 15.243.

Sec. 6. Violation of Privacy Policy
(1) A person who violates section 3 with knowledge that the person's conduct violates this act is
guilty of a misdemeanor punishable by imprisonment for not more than 93 days or a fine of not
more than $1,000.00, or both.

(2) An individual may bring a civil action against a person who violates section 3 and may recover
actual damages. If the person knowingly violates section 3, an individual may recover actual
damages or $1,000.00, whichever is greater. If the person knowingly violates section 3, an
individual may also recover reasonable attorney fees. Except for good cause, not later than 60
days before filing a civil action, an individual must make a written demand to the person for a
violation of section 3 for the amount of his or her actual damages with reasonable documentation
of the violation and the actual damages caused by the violation. This subsection does not apply to
a person for conduct by an employee or agent of the person in violation of a privacy policy created
pursuant to section 4 or in compliance with the fair credit reporting act, 15 USC 1681 to 1681v, or
subtitle A of title V of the Gramm-Leach-Bliley act, 15 USC 6801 to 6809, if the person has taken
reasonable measures to enforce its policy and to correct and prevent the reoccurrence of any
known violations.
XXIV. WATER AND SEWER POLICIES

CHARGES FOR LATE PAYMENTS

Bills not paid by the due date shall be subject to a service charge equal to ten (10%) percent of
the billing. In the event a delinquent bill must be spread on the taxes, for the purpose of covering
associated administrative costs, an additional service charge equal to twenty (20%) percent with a
minimum service charge of $25.00 and a maximum service charge of $100.00 of the original
delinquent billing amount shall be charged.



ADJUSTMENT OF BILLS FOR MAJOR LEAKS


RESIDENTIAL WATER/SEWER LEAK ADJUSTMENT REGUALTIONS
The purpose of these regulations is to promote water conservation by encouraging customers to
promptly fix leaks and plumbing problems and to establish guidelines that provide fair and
consistent treatment of customers requesting leak adjustments.



TYPES OF ADJUSTMENTS

           1) Adjustments for leaks where water was discharged into the sanitary sewer
              system.
           2) Adjustments for leaks where water was not discharged into the sanitary sewer
              system.

RULES
No more than one leak adjustment will be allowed in any two year (24 month) period.

No more than two consecutive billing periods will be adjusted.

The request must be made within 30 days of the due date for the period initially involved and must
be accompanied by the following:

            •   A written statement from the customer describing the nature of the problem, the
                date repairs were completed, and copies of the paid receipts for services and/or
                supplies (where applicable).
            •   Current readings (at the time of the request) from both the meter and remote
                device to be furnished by customer.

Leak adjustments will be based on metered usage experience after repairs are made and will be
made only if usage is demonstrably reduced (after adjusting for any extenuating circumstances).

If lost water entered the sanitary sewer system, leak adjustments to the customer’s water and
sewer billing will equal 25% of the estimated loss for no more than two billing periods.

If the lost water did not enter the sanitary sewer system (i.e. leaks in crawl spaces or into the
ground) water charges will be adjusted 25% of the estimated loss for no more than two billing
periods and sewer charges will be adjusted to normal usage based on prior year’s usage patterns.
If a leak is suspected but cannot be detected by the occupant or owner, additional assistance may
be requested from the Water Maintenance Department at no charge to the customer.



SHUTOFF PRACTICES

While the City is authorized to shut off water service for any delinquent bill, the City will normally
shut off water or sewer service if the charges to the premises or the meter in question are
delinquent in the amount of $50.00 or more. This amount and practice shall vary, and the
threshold amount for shutoff may be changed by the decision of the City Manager, from time to
time, to an amount less or more than $50.00. This decision shall be made by the City Manager
based on the administrative and enforcement availability and capability of City personnel, and the
cost incurred by the City by using this method of enforcement.


BILLING INITIATION AND SERVICE CHANGES

Because state law dictates that a municipality that provides municipal water and sewer service to
a property shall have a lien against the premises, the City requires that the legal property owner
sign on for water and/or or sewer billing service and sign off for water and/or sewer service. The
owner must approve any billing changes by signing an application for service form located at the
Treasurer’s Office/Water Billing Department. Positive identification is required to be provided.




BILLING CYCLES

For the purpose of reading water meters and billing customers, the city is divided into districts.
The meters for each district are read monthly and the customer accounts are also billed each
month with bills being due at least 15 days after the billing date.


E-BILLING

City water and sewer customers can sign up to receive their monthly bill in paperless format via
the internet. Customers that agree to receive their monthly water and sewer bill via the internet
help save paper, printing and postage costs and also receive a credit on their monthly bill.


AUTOMATIC PAYMENT (AUTOPAY)

City water and sewer customers can sign up to automatically pay their water and sewer bill in the
Automatic Pay program. Under the Automatic Pay program the customer’s water bill payment is
automatically deducted from their bank checking account or charged to their credit card account
each month when the bill is due. Customers enrolled in the Automatic Pay program receive a
credit on their monthly bill.


WATER/SEWER AFFIDAVIT

Property owners who desire, pursuant to MCL123.165, to avoid a tenant’s unpaid water/sewer bill
from becoming a lien against the real estate, may execute an affidavit and file it with the City of
Muskegon Water/Sewer Billing Department, 933 Terrace Street, Muskegon, MI 49440, together
with a deposit of an amount which may be established from time to time by the Muskegon City
Commission. A copy of the executed lease agreement must also be provided. The owner is
required to use the affidavit form provided by the City. The requirements and contents of the
affidavit are as follows:

     1) The written lease with tenant; said lease must specifically provide that the tenant, not the
        owner of the property, is directly responsible for all water and sewer bills associated with
        the unit under lease to that tenant.

     2) The affidavit must be filled in completely, accurately, signed and notarized. If it is not
        correctly and completely filled out, signed and notarized, any benefits allowed pursuant
        to MCL 123.165 will not be available to the property owner.


     3) If there is more than one property owner or tenant; said affidavit must provide all
        applicable names. All required data must provide for said affidavit to be valid and
        enforceable.

     4) The affidavit must contain the exact date upon which the tenant’s written lease
        terminates. If the lease is extended, the extension must be in writing and the new
        termination date provided to the City with an affidavit containing the new information.

     5) The required deposit must be paid at the time of submission of the affidavit to the City.



XXV. POVERTY EXEMPTION INCOME GUIDELINES

The guidelines shall include but not be limited to the specific income and asset levels of the
claimant and all persons residing in the residence, including any property tax credit returns filed in
the current or immediately preceding year.

To be eligible, a person shall do all of the following on an annual basis:

        1) Be an owner of and occupy as a principal residence the property for which an
           exemption is requested.
        2) File a claim with the City Assessor or Board of Review, accompanied by Federal and
           State Income tax returns for all persons residing in the residence, including any
           property tax credit returns filed in the immediately preceding year or current year. or a
           form 4988, if applicable.
        3) Produce a valid driver’s license or other form of positive identification if requested.
        4) Produce a deed, land contract, or other evidence of ownership of the property for
           which an exemption is requested if requested.
        5) Meet the Federal poverty income guidelines as defined and determined annually by
           the United States Office of Management and Budget (or its successor).
        6) Total household assets, except for the principal residence being claimed, essential
           household goods, and one motor vehicle, may not exceed one quarter (25%) of the
           Federal poverty guideline for the entire household. Assets include, but are not limited
           to real estate, motor vehicles, recreational vehicles and equipment, time shares,
           certificates of deposit, savings accounts, checking accounts, stocks, bonds, life
           insurance, retirement funds, antiques and collectibles, etc. Assets do not include
           basic essential household goods such as furniture, appliances, dishes and clothing.
           The value of assets will not be reduced by the amount of any indebtedness owed on
           such assets, or any indebtedness otherwise owed by the applicant or members of the
           household.
        7) The applicant must be able to produce evidence as requested that they have owned
           and occupied the residence for a minimum of two years before tax day of the year in
           which they seek the exemption.
         8) The State Equalized Value of the property for which the exemption is claimed shall
            not exceed the mean average for residentially-classed properties in the City of
            Muskegon for the current tax year.

The Board of Review shall follow the above stated policy and Federal guidelines in granting or
denying an exemption, unless the Board of Review determines there are substantial and
compelling reasons why there should be a deviation from the policy and Federal guidelines and
these are communicated in writing to the claimant.

sc

XXVI. INCOME TAX POLICIES
PAYMENT AGREEMENTS

The City of Muskegon Income Tax Office does accept payment agreements. The terms of the
agreement are as follows:

     •   Twenty five percent (25%) of the total tax due for all years must be paid plus a $15.00 fee.
     •   The remaining balance must be paid one year from the inception of the agreement.
     •   All future tax liabilities must be paid on time. This includes withholding tax payments if
         required.
     •   Interest and penalties will continue to accrue until the payment plan is paid in full.
     •   The City of Muskegon has the right to void this agreement at anytime.

If the taxpayer does not remain current on their payment agreement the City of Muskegon has the
right to pursue payment through the court system or a collection agency.

WRITE OFF POLICY

The Income Tax Department may write off income tax liability deemed not collectable due to
death or other reason. The Income Tax Administrator is authorized after ten (10) years to review
and to write off total tax liability of a taxpayer up to $15,000. Income Tax liability over $15,000
requires City Commission approval before a write off can occur.

PROOF OF RESIDENCY

The City of Muskegon Income Tax follows the State of Michigan law to determine residency.

Resident means an individual domiciled in the city. Domicile means a place where a person has
true, fixed and permanent home and principle residence.

Michigan law defines principal residence as the one place where a person has his or her true,
fixed, and permanent home to which, whenever absent he or she intends to return and that shall
continue as a principal residence until another principal residence is established.

In order to verify a person’s claim that a particular property is a principal residence, the City of
Muskegon will accept various documents that, taken together, to establish that the person or
persons is a resident. Examples include drivers license, voter registration card, state identification
cards, property tax records, mortgage deeds, rental agreements, income tax records and other
documentation. No one of these factors taken alone is controlling over any other factor.
                     Agenda Item Review Form
                      Muskegon City Commission

Commission Meeting Date:      9/24/2019                 Title: Equipment Replacement

Submitted By:    Joe Buckingham                         Department: DPW/Equipment


Brief Summary: The Equipment Division is requesting permission to purchase one (1)
Caterpillar Backhoe coming from Michigan CAT, the Mi Deal State Contract holder. This
machine will replace one we are trading in.




Detailed Summary:




Amount Requested: $109,290.05 Less trade              Amount Budgeted: $120,000.00
in of $20,000.00 for our machine. Final price
of $89,290.05

Fund(s) or Account(s): Equipment CIP fund             Fund(s) or Account(s): 661-60932-5720

Recommended Motion:        Authorize staff to purchase one Caterpillar backhoe for a final price of
$89,290.05.




Check if the following Departments need to approve the item first:
Police Dept.
Fire Dept.
IT Dept.


For City Clerk Use Only:
Commission Action:
                      Agenda Item Review Form
                       Muskegon City Commission

Commission Meeting Date: Sept. 24, 2019                 Title: Development and Reimbursement
                                                        Agreement, Midtown/Nelson Brownfield

Submitted By: Dave Alexander                            Department: Economic Development

Brief Summary: Approval of the Development and Reimbursement Agreement for the Midtown
Square II and Nelson Neighborhood Infill Housing Brownfield between the city and its Brownfield
Redevelopment Authority

Detailed Summary: The Brownfield Plan Amendment for Midtown Square II and the Nelson
Neighborhood Infill Housing was approved by the Authority on April 9, 2019. This agreement
outlines how the Authority will reimburse the city for eligible costs in the construction of 20 housing
units in the Nelson Neighborhood through future tax capture. The city will seek an approximately
$3 million commercial loan and have the residential units built by Dusendang Contractors. The city
will receive reimbursement of 5 percent per annum for the cost of borrowing for an estimated total
amount of $302,406. The Muskegon Brownfield Redevelopment Authority approved the agreement
at its Sept. 10, 2019 meeting.



Amount Requested: none immediately                    Amount Budgeted:

Fund(s) or Account(s):                                Fund(s) or Account(s):

Recommended Motion: To approve the Midtown Square II and Nelson Neighborhood Infill Housing
Development and Reimbursement Agreement and authorize the mayor and city clerk to sign the
same.



Check if the following Departments need to approve the item first:
Police Dept.
Fire Dept.
IT Dept.
For City Clerk Use Only:
Commission Action:
                      Agenda Item Review Form
                       Muskegon City Commission

Commission Meeting Date:09/24/19                        Title: Thermal Imaging Cameras (TIC)

Submitted By: Director Jeffrey Lewis                    Department: Fire Department

Brief Summary: Seeking approval to purchase two (2) Avon Thermal Imaging Cameras (TIC) at a
cost of $10,060.00 and six (6) Seek units at a cost of $3,957.50. The total cost of $13,748.80 is
below the approved 2019/2020 budgeted amount of $14,096.00.Thermal Imaging Cameras are
used to locate victims and hidden fires during fire-fighting efforts. The two (2) Avon TIC units will
be placed on Engines 23 & 25. The six (6) personal size TIC units are to be worn by the
firefighters.

Detailed Summary:




Amount Requested: $13,748.80                          Amount Budgeted: $14,096.00

Fund(s) or Account(s): 101-50336-5720                 Fund(s) or Account(s): 101-50336-5720

Recommended Motion: Commission approval for the purchase of eight (8) Thermal Imaging
Cameras for Fire Department use in detection and rescue efforts for a total cost of
$13,748.80.


For City Clerk Use Only:


Commission Action:
                      Agenda Item Review Form
                       Muskegon City Commission

Commission Meeting Date: 09/24/2019                    Title: Melching – Change Order #005

Submitted By: Leo Evans                                Department: Public Works

Brief Summary: Melching Demolition has provided a proposal to crush all of the existing concrete
and asphalt and leave it on site at the West Shoreline Correctional Facility. The crushed concrete
and asphalt would be used by city crews performing maintenance work and for city funded public
projects with excess material to be sold.

Detailed Summary: Change Order #005 represents an approximately $100K increase in the
contract value with Melching. For this price Melching will crush all of the existing concrete and
asphalt on site. Concrete will be crushed into popular gradations that can be used for city projects,
or sold to private developments. Asphalt will be crushed into millings for use on city projects,
and/or to be sold for private developments. Payment for the contract increase will be made from
the grant funds allocated towards this site. Any proceeds from sale of excess material are
proposed to be deposited into the Local Street fund to potentially be used to fund a future project.

Amount Requested: $101,250.00                        Amount Budgeted: $0

Fund(s) or Account(s): 482-91908-5346                Fund(s) or Account(s):

Recommended Motion:
Authorize staff to sign Change Order #005 to the demolition contract with Melching Demolition in
the amount of $101,250.

Check if the following Departments need to approve the item first:
Police Dept.
Fire Dept.
IT Dept.


For City Clerk Use Only:
Commission Action:
                      Agenda Item Review Form
                       Muskegon City Commission

Commission Meeting Date: 09/24/2019                    Title: Water Filtration Plant – CE Contract

Submitted By: Leo Evans                                Department: Public Works

Brief Summary: Consumers Energy has provided a contract relative to the water filtration plant that
allows them to suspend electrical service to the water filtration plant under certain peak conditions
at which time the water filtration plant will operate under generator power.

Detailed Summary: Consumers Energy retains the right to suspend electrical service to the water
filtration plant under certain peak conditions and provided proper notice to the plant. These
occurrences are limited to five (5) occurrences annually each not to exceed 4 hours. Consumers
Energy will compensate the City for enrollment in this program. Staff has reviewed the contract
and performed the necessary load testing of the plant to ensure compliance with the agreement.
The contract has been reviewed by legal counsel. Staff is recommending the 4 year option, which
includes an annual payment in the amount of $28,000/Year to the city.

Amount Requested: $0                                 Amount Budgeted: $0

Fund(s) or Account(s):                               Fund(s) or Account(s):

Recommended Motion:
Authorize staff to sign the 2020 Emergency with Generator Commercial and Industrial Demand
Response Customer Agreement with Consumers Energy for a period of 4 years.

Check if the following Departments need to approve the item first:
Police Dept.
Fire Dept.
IT Dept.


For City Clerk Use Only:
Commission Action:
                                2020 EMERGENCY WITH GENERATOR COMMERCIAL AND
INDUSTRIAL                     INDUSTRIAL DEMAND RESPONSE CUSTOMER AGREEMENT



Customer and Consumers Energy are referred to herein collectively as the “Parties” and each individually as a
“Party” to this Agreement.


Effective Date of Agreement:                                   6/1/20-9/30/20
                                                            (Month/Day/Year)

Company:                                                  Customer:
CONSUMERS ENERGY COMPANY                                  CITY OF MUSKEGON
a Michigan Corporation                                                               (Legal Name)



ONE ENERGY PLAZA                                          1900 BEACH ST
JACKSON MI 49201-2357                                                             (Street & Number)


                                                          1900 BEACH ST MUSKEGON, MI 49441
                                                                                (City, State & Zip Code)



1. Initial Term: Shall commence on June 1, 2020 and shall run through (select one):
                 September 30, 2020 (1 year)
                 September 30, 2021 (2 years)
                 September 30, 2022 (3 years)
                 September 30, 2023 (4 years)

2. This Agreement will become effective on the date identified above and will extend for an Initial Term
   through the end date identified above. The Customer must notify Consumers Energy Company
   (“Consumers Energy” or the “Company”) by September 1st in the final year of the Initial Term of their
   desire to renew participation in the Demand Response Program (“Program”) through the execution of
   a new Program Agreement and the amount of reduction/nomination kW for the following Program
   Period (June 1 through October 1). Customer participation under this Agreement shall be based on the
   limitations, terms and eligibility as described in the Company’s Program and the Company’s Electric
   Rate Book, as approved by the Michigan Public Service Commission. Notice of renewal of participation
   in the Program by the Customer to the Company shall be made in writing and mailed using the United
   States Post Office first-class mail. Customer’s notice to renew participation in the Program shall be sent
   to Consumers Energy Company, Attention: Customer Services – DR Program, 165 W Michigan Avenue,
   Jackson, MI 49201.

3. Payment Revisions. The Company will notify each customer enrolled in a multi-year agreement by July 1
   of the price for the following Program Period and will submit a contract change order to the customer
   identifying any necessary changes and requesting signatures of approval. If either the Program’s
   Emergency Capacity Payments or Emergency Event Energy Payments increase by greater than 10%
   year to year, this Agreement shall automatically terminate and the customer and the Company may
   reopen negotiations for a new Program Agreement for the following year. If the Parties mutually agree
   to new annual payment amount(s), the new payment(s) shall become effective June 1 of the following
   year and continue throughout the Program Period beginning June 1 (i.e. June 1 through September
   30). In the event that the Program’s Emergency Capacity Payment or Emergency Event Energy
   Payment increase by less than 10% year over year, the new payment amount(s) shall become
   effective on June 1 and continue throughout the Program Period beginning June 1 (i.e. June 1 through
   September 30).

4. Program Description. Participants in the Program help reduce peak demand when energy use is the highest
   and maintain a ready supply of energy for Michigan. Participants will receive an annual Emergency

Form 1569 5-2019                        2020 Season – Emergency with Generator                             Page 1 of 8
    Capacity Payment for the capacity amount specified in this Agreement within 60 days of the Effective Date
    of the Agreement.

5. Administration Solutions. Customer agrees to work with Consumers Energy to develop an appropriate
   energy reduction plan for Customer’s business; and (ii) to provide Consumers Energy access and use of
   contact, billing and energy usage data, and facility information concerning each Site Address (as
   defined below) (“Customer Data”). Consumers Energy shall manage Customer’s curtailable electrical
   capacity in the Program and upon notification by Consumers Energy and acceptance by Customer,
   provide real-time support to Customer during demand response events (“Demand Response Events”);
   and enable data transfer, monitoring and reporting of meter data and provide technical assistance,
   maintenance, repair and hosting of the System. In addition, as necessary, Consumers Energy will
   coordinate with Customer to capture kilowatt-hour (“kWh”) pulses from Customer’s primary utility meter
   to provide Customer near real-time, Internet-enabled power monitoring.

6. System. Consumers Energy may equip one or more of Customer facility addresses (each address is
   referred to as a “Site Address”) as identified on the Site Address Attachment attached hereto with the
   System, which includes site devices owned by Consumers Energy that can enable direct load
   management, power metering, data collection, near real-time data communication, and Internet-
   based reporting and analytics. There shall be no cost to the Customer associated with the System
   equipment or installation of the System equipment.

7. Customer Support Requirements.

    a. Representations and Warranties. Customer holds all applicable licenses and/or permits pursuant to
       the Agreement that are required for the proper participation in the Program.

    b. Demand Response Performance. Customer has the intent and ability to generate and/or reduce
       electrical demand to achieve Accepted Capacity (as defined below) at each Site Address when
       notified by Consumers Energy Demand Response Events.

    c. Acceptance Testing. At each Site Address where the site devices are installed, Customer agrees to
       collaborate with Consumers Energy in a timely manner in testing, enabling and maintaining the
       System.

    d. Energy Reduction Plan. Customer must provide to Consumers Energy their Energy Reduction Plan
       describing the equipment and steps that will be taken to meet their curtailment nomination.

8. Program Rules. The terms of this Agreement reflect the current Program terms and conditions, which may
   be amended from time to time by Consumers Energy. The current terms are summarized below:

 Program Availability            During the Program period of June 1 – September 30, emergency events
                                 could be called at any time Monday through Friday between 11 am and
                                 7 pm in response to Midcontinent Independent System Operator, Inc.
                                 (“MISO”) reliability emergencies (“Emergency Event(s)”). Customer is
                                 required to participate in any Emergency Event called by MISO.
 Event Frequency and Duration    Emergency Events – Up to five (5) events during the Program Period, each
                                 up to four hours each.
 Advanced Notification           Emergency Events – Customer will receive at least a thirty (30) minute but
                                 no more than a twelve (12) hour notice in advance of an Emergency
                                 Event. Customers are advised to estimate load reduction capability over
                                 a twelve (12) hour timeframe for planning purposes.




Form 1569 5-2019                        2020 Season – Emergency with Generator                       Page 2 of 8
 Dispatch Readiness Test          After Customer’s Energy Reduction Plan has been reviewed by Consumers
                                  Energy and Customer’s site installation has been completed, Customer will
                                  receive an email from Consumers Energy asking Customer to select a date
                                  to participate in a thirty (30) minute Dispatch Readiness Test of Customer’s
                                  Energy Reduction Plan. The Dispatch Readiness Test is optional to the
                                  Customer but recommended by Consumers Energy.
 Audit                            Consumers Energy may call one (1), one-hour audit (“Audit”) per
                                  Program Period to confirm Contracted Capacity (as defined below). If
                                  called, this audit is required as the Customer’s program payment will be
                                  determined by performance.
 Online Portal                    Customer will have access to an online portal “Dashboard” where
                                  Customer can monitor their performance during both an Emergency and
                                  Economic Event. Portal will be activated before the season starts on June
                                  1 and will remain active until the season concludes on September 30.

9. Customer capacity.

    a. Contracted Capacity. For purposes of this Agreement, “Contracted Capacity” shall represent the
       Customer’s performance obligation (in kilowatts (“kW”). The Contracted Capacity shall be based on
       an analysis of Customer’s prior summer consumption data and pre-enrollment load reduction testing.

    b. Delivered Capacity. For purposes of this Agreement, an event’s “Delivered Capacity” shall be
       defined as the amount of load in kW reduced for each hour in a Demand Response Event.
       Delivered Capacity for each event hour is calculated as the difference between the measured
       energy demand and the baseline energy demand. Consumers Energy will use a MISO-approved
       baseline calculation method. MISO’s default baseline is the Ten Day Baseline. The Ten Day Baseline
       is calculated as the average hourly demand from the previous ten (10) non-weekend non-holiday
       non-event days prior to the event. Customer is required to reduce the full amount specified as
       Contracted Capacity for the hourly average of an emergency event. An alternative baseline may
       be used, so long as it is pre-approved by MISO.

10. Environmental. In order for the engine to be considered an emergency stationary engine under 40 CFR
    Part 60 Subpart IIII, 40 CFR Part 60 Subpart JJJJ and/or 40 CFR Part 63 Subpart ZZZZ any operation other
    than emergency operation, maintenance and testing, emergency demand response, and operation
    in non-emergency situations for up to 50 hours per calendar year, as described in the applicable
    regulation(s), is prohibited. If Customer does not operate the engine according to these requirements,
    the engine will not be considered an emergency engine and must meet all requirements for non-
    emergency engines in the applicable regulations.

    Emergency Demand Response Events per this contract are considered non-emergency situations (not
    to exceed 50 hours per calendar year). Power supplied as part of a financial arrangement with
    Consumers Energy must meet all of the following conditions:

    a. The engine is dispatched by the local balancing authority or local transmission and distribution
       system operator.

    b. The dispatch is intended to mitigate local transmission and/or distribution limitations so as to avert
       potential voltage collapse or line overloads that could lead to the interruption of power supply in a
       local area or region.

    c. The dispatch follows reliability, emergency operation or similar protocols that follow specific NERC,
       regional, state, public utility commission or local standards or guidelines.

    d. The power is provided only to the facility itself or to support the local transmission and distribution
       system.


Form 1569 5-2019                          2020 Season – Emergency with Generator                         Page 3 of 8
    e. The owner or operator (Customer) identifies and records the entity that dispatches the engine and
       the specific NERC, regional, state, public utility commission or local standards or guidelines that are
       being followed for dispatching the engine. The local balancing authority or local transmission and
       distribution system operator may keep these records on behalf of the engine owner or operator.

11. Payments to Customer.

    a. Emergency Capacity Payments. Consumers Energy will pay Customer an Emergency Capacity
       Payment price of $25/kW (“Capacity Rate”) of Contracted Capacity capped at 120% per Program
       Period as defined in section 9(b) above for a one (1) year contract; $26/kW for a two (2) year
       contract, $27/kW for a three (3) year contract and $28/kW for a four (4) year contract. Consumers
       Energy will pay Customer the Capacity Rate multiplied by the Contracted Capacity. The Capacity
       Payment will be made within sixty (60) days of the Effective Date of the Agreement by both Parties.

    b. Emergency Event Energy Payments. In Program Periods when one or more Emergency Events are
       called, Consumers Energy will pay Customer an energy payment of $50/MWh multiplied by the
       event’s Delivered Capacity multiplied by the hours for each such event as defined in section 9(b)
       above.

    c. Underperformance. If Customer fails to deliver their total Contracted Capacity for an Emergency
       Event ordered by Consumers Energy, as provided for in this Agreement, the following shall occur: (i)
       Customer shall be assessed the real time commodity price ($/MWh), as determined by the MISO
       Midwest Energy Market, for the kW curtailment which was underperformed per event; and (ii)
       Customer’s future Contracted Capacity will be reduced to the amount of load reduced during the
       Emergency Event for the balance of this Agreement.

12. Payment Timing. After an Emergency Event and Customer’s Delivered Capacity has been verified,
    Consumers Energy shall make Emergency Event Energy Payments for Customer’s participation by the
    issuance of credits to the Customer’s bill.

13. Cancellation. Customer may cancel this Agreement any time before December 31, 2019. Cancellation
    requests must be submitted in writing to: ConsumersEnergy.DemandResponseProgram@cmsenergy.com.
    If Customer cancels after program equipment has been installed, Customer will incur a cancellation fee
    of $300.

14. Confidentiality.

    a. Nondisclosure to Third Parties. In performing under the Agreement, each Party to this Agreement will
       be exposed to certain Confidential Information (as hereinafter defined) of the other Party. Each Party
       on its own behalf and on behalf of its employees, contractors and agents (collectively,
       “Representatives”) agrees not to, except as required by applicable law or regulation, use or disclose
       such Confidential Information without the prior written consent of the other Party, either during or
       after the Term. To protect Confidential Information, each Party agrees to: (i) limit dissemination of
       Confidential Information to only those Representatives having a “need to know”; (ii) advise each
       Representative who receives Confidential Information of the confidential nature of such information;
       and (iii) have appropriate agreements, policies and/or procedures in place with such
       Representatives sufficient to enable compliance with the confidentiality obligations contained
       herein. The term “Confidential Information” means all information which is disclosed, either orally or in
       written form, by either Party or its Representatives and shall be deemed to include: (w) any notes,
       analyses, compilations, studies, interpretations, memoranda or other documents prepared by either
       Party or its Representatives which contain, reflect or are based upon, in whole or in part, any
       Confidential Information furnished to a receiving Party or its Representatives pursuant hereto; (x) any
       information concerning the business relationship between the Parties; and (y) Customer Data.

    b. Exclusions from Confidential Information. Notwithstanding the obligations in Section 14(a) above,
       Confidential Information does not include any information that:



Form 1569 5-2019                         2020 Season – Emergency with Generator                       Page 4 of 8
           i.    is or becomes generally known to the public without breach of any obligation owed to the
                 disclosing Party;

           ii.   was known to the receiving Party prior to its disclosure by the disclosing Party without breach of
                 any obligation owed to the disclosing Party;

           iii. is received from a third party without the receiving party having any knowledge of any breach by
                such third party of any obligation owed to the disclosing Party; or

           iv. was independently developed by the receiving Party without reference to or reliance upon the
               disclosing Party’s Confidential Information.

15. Limitation of Liability. Consumers Energy’s and its contractors’ and subcontractors’ liability hereunder is
    limited to direct actual damages as the sole and exclusive remedy, and total damages under the
    Agreement shall not exceed $100,000 or the total amounts paid to Consumers Energy under the
    Agreement, whichever is less. In no event shall either Party, its parent, officers, directors, partners,
    shareholders, employees or affiliates, or any contractor or subcontractor or its employees or affiliates, be
    liable to the other Party for special, indirect, exemplary, punitive, incidental or consequential damages of
    any nature whatsoever connected with or resulting from performance or non-performance of obligations
    under the Agreement, including without limitation, damages or claims in the nature of lost revenue,
    income or profits, loss of use, or cost of capital, irrespective of whether such damages are reasonably
    foreseeable and irrespective of whether such claims are based upon negligence, strict liability contract,
    operation of law or otherwise.

16. Additional Terms.

    a. Customer also agrees, with respect to Consumers Energy’s management of the System, it:

           i.    receives a limited, revocable, non-transferrable and non-exclusive right to use and access
                 during the Term the System and shall use the System solely for its internal use subject to the terms
                 of the Agreement and not for the benefit of any third party. Except as expressly permitted in the
                 Agreement, Customer agrees that it shall not receive any right, title or interest in, or any license
                 or right to use or access, the System or any patent, copyright, trade secret, trademark or other
                 intellectual property rights therein by implication or otherwise;

      ii.        shall use the System in accordance with all applicable law;

      iii.       shall not and shall prohibit causing or permitting, the copying, reverse engineering, disassembly,
                 decompilation or attempting to derive the source code of the System, or other intellectual
                 property of Consumers Energy or creation of any derivative work thereof;

     iv.         expressly disclaims any passing of title to the System, any trade names, trade dress, trademarks,
                 service marks, commercial symbols, copyrightable material, designs, logos and/or any other
                 intellectual property of Customer;

      v.         shall not delete, alter, cover, or distort any copyright or other proprietary notices or trademarks
                 from the System and to use reasonable care to prevent the System and Consumers Energy’s
                 intellectual property rights contained in the software from damage and unauthorized use.

    b. Miscellaneous. Customer may not assign any of its rights or delegate any of its performance
       obligations hereunder without the prior written consent of Consumers Energy. The Agreement,
       including all attachments, constitutes the entire agreement between Customer and Consumers
       Energy and may only be amended in writing signed by each of the Parties. If any of its provisions shall
       be held invalid or unenforceable, this Agreement shall be construed as if not containing those
       provisions and the rights and obligations of the Parties hereto shall be construed and enforced
       accordingly. This Agreement shall be binding upon the Parties together with their successors and
       permitted assigns. Each Party shall be responsible for its Representatives’ compliance with the


Form 1569 5-2019                               2020 Season – Emergency with Generator                         Page 5 of 8
        Agreement. Customer shall promptly notify Consumers Energy in writing of any changes occurring
        during the Term to the Customer address(es) set forth in this Agreement.

    c. Force Majeure. The Parties to this Agreement shall be excused from any failure or delay in the
       performance of their obligations if such obligations are prevented from being fulfilled due to Force
       Majeure. A Party unable to fulfill any obligation hereunder (other than an obligation to pay money
       when due) by reason of Force Majeure, shall give notice and the full particulars of such Force
       Majeure to the other Party in writing or by telephone as soon as reasonably possible after the
       occurrence of the cause relied upon. Telephone notices given pursuant to this article shall be
       confirmed in writing as soon as reasonably possible and shall specifically state full particulars of the
       Force Majeure, the time and date when the Force Majeure occurred and when the Force Majeure is
       reasonably expected to cease. The Party affected shall exercise due diligence to remove such
       disability with reasonable dispatch, but shall not be required to accede or agree to any provision not
       satisfactory to it in order to settle and terminate a strike or other labor disturbance. A “Force Majeure”
       shall include any act, event, or occurrence beyond the Party’s reasonable control, which the Party,
       despite its best efforts, is unable to prevent, avoid, overcome, delay or mitigate, including but not
       limited to: floods, epidemics, earthquakes, quarantine, blockade, war, insurrection or civil strife or
       terrorism, provided, however, that Force Majeure shall in no event include (i) failure of Subcontractors
       or Suppliers to deliver services, materials or components or receipt from any Subcontractor or Supplier
       of defective services, material or components unless same were themselves caused by a Force
       Majeure Event; (ii) technological impossibility; (iii) a governmental act or failure to act, or order or
       injunction, caused by any act or failure to act of the Seller or any Subcontractor or Supplier; (iv) strikes
       or work stoppages; or (v) inclement weather.

    d. Warranty Limitations. THE SYSTEM (AND ANY SOFTWARE, HARDWARE, OR OTHER COMPONENT
       THEREOF) AND ALL SERVICES HEREUNDER ARE PROVIDED AS IS BY CONSUMERS ENERGY WITHOUT ANY
       WARRANTY OF ANY KIND. ALL WARRANTIES, WHETHER EXPRESS OR IMPLIED, INCLUDING BUT NOT
       LIMITED TO ALL WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, ARE
       EXPRESSLY DISCLAIMED TO THE FULLEST EXTENT PERMISSIBLE UNDER APPLICABLE LAW.

    e. Governing Law; Actions; Etc.: This Agreement shall be deemed a Michigan contract and shall be
       governed by and interpreted in accordance with the laws of the State of Michigan; excluding any
       conflicts of laws principles that would result in this Agreement being interpreted in accordance with
       any different law. Venue for any lawsuit arising out of or in connection with this Agreement shall be
       exclusively in the courts of the State of Michigan or a Federal court sitting in the State of Michigan.
       Any legal action against Consumers Energy relating to this Agreement or the breach thereof shall be
       commenced within one year from the date on which the claimed breach, default or other cause of
       action arose (and, without limiting the foregoing, in all events not later than one year after the date
       of completion or other cessation of performance of the work hereunder). This Agreement is intended
       for the benefit of the parties herein only and does not grant any rights to any third parties unless
       otherwise specifically stated herein. If Customer defaults in the timely performance of any of its
       obligations hereunder, then Consumers Energy may, at its option, and in addition to any and all other
       rights or remedies it may have hereunder or at law or equity, terminate this Contract by written notice
       to Customer.




Form 1569 5-2019                          2020 Season – Emergency with Generator                         Page 6 of 8
IN WITNESS WHEREOF, and intending to be legally bound, the Parties have duly executed this Agreement by
their authorized representatives as of the Effective Date.

CONSUMERS ENERGY COMPANY                                      CITY OF MUSKEGON
                                                                                     (Customer)


By:                                                           By:
                         (Signature)                                                 (Signature)

                    JJ Carpenter
                     (Print or Type Name)                                       (Print or Type Name)

                   7/23/2019
                           (Date)                                                      (Date)




Form 1569 5-2019                            2020 Season – Emergency with Generator                     Page 7 of 8
                               SITE ADDRESS ATTACHMENT
                                     SITE ADDRESSES

                                                           CONTRACT                ESTIMATED
                                                           ACCOUNT         METER   CAPACITY
        SITE NAME            SITE ADDRESS                   NUMBER        NUMBER      (kW)
CITY OF MUSKEGON    1900 BEACH ST MUSKEGON, MI 49441      100000360717 80042878          kW




Form 1569 5-2019                 2020 Season – Emergency with Generator                 Page 8 of 8
                      Agenda Item Review Form
                       Muskegon City Commission

Commission Meeting Date: 9/24/2019                             Title: Establish Policy and Application for Block
                                                               Parties

Submitted By: LeighAnn Mikesell                                Department: Planning

Brief Summary: Staff is seeking to establish a policy, application, and fees to allow for block parties
which close city streets. The goal is to encourage neighborhood cohesion while placing reasonable
restrictions to ensure safety and minimize risk for complaints.



Detailed Summary: To establish a block party policy, application, and associated fees.


  APPLICATION                         *Application fee may be refunded if the application is denied by the city.
                           $50*
  FEE                                 Application fee will not be refunded if event is cancelled by the applicant.

  CLEANING FEE                        **Will be charged to the applicant after the event if city property is not returned to its
                        $60/hour**
      If required                      original condition and/or trash is left on city property.




Amount Requested: N/A                                        Amount Budgeted: N/A

Fund(s) or Account(s): N/A                                   Fund(s) or Account(s):

Recommended Motion: Approve the block party policy, application, and fees as proposed.




For City Clerk Use Only:


Commission Action:
CITY OF MUSKEGON
BLOCK PARTY POLICY
2020

The City of Muskegon has 15 distinct neighborhoods and encourages
neighbors to build community. Block party-type events involving the closure of
any portion of a city street require a Block Party Permit. While there are several
City departments involved in the approval process, this policy centralizes the
administration of block party events with the City’s Planning Department.

Consumption of alcohol beverages on any public property including streets, terraces, and
sidewalks is strictly prohibited.

BLOCK PARTY APPLICATION PROCEDURE
I.     Application Submission & Fees
       Applications shall be filed with the Planning Department at least thirty (30) days prior to the
Block Party date. Applications will be accepted between April 1 and September 30 of each year for
block parties to be held in that same calendar year. Block parties will be allowed May 1 through
October 31 only. The application fee must be paid at the time the application is submitted.
       The Block Party Application fee is $50.00.
        The Application shall be submitted in writing on the appropriate form. The application fee
must be paid at the time of Application submission. The cleaning fee, if applicable, must be paid
within 30 days of the invoice date. The CITY OF MUSKEGON BLOCK PARTY APPLICATION form
can be found on the City’s website at www.muskegon-mi.gov, or you may call 231.724.6702 to have
one mailed/e-mailed to you, or visit the Planning Department on the 2nd floor of City Hall, Monday –
Friday from 8:30 am. until 5:00 p.m. excluding holidays.

II.    Block Party Application Processing
       (a) Application Intake. Planning Department staff shall be responsible for intake of Block
Party Applications and dissemination to appropriate City staff for review and approval. The
application fee and signed Block Party Petition must be submitted with the application.
       (b) Approval. The City will issue an approval or denial no later than 20 days after the
application date whenever possible. You will be provided with a signed, approved permit which you
should keep available during the block party. Any approval is granted for the date and time specified
only. No alternate dates or times are permitted without submitting an additional application and fee.
        (c) Application Denial. Where City staff reviews an Application and denies same, it shall
state in writing the reasons for the denial.
        (d) Unpaid Invoices Due the City. Any past due fees/invoices owed to the City may result in
denial of the application and/or future requests.

III.   Event Requirements
All permittees must adhere to the following rules and regulations. Failure to do so may result in the
applicant being held responsible for any damages and/or denial of future applications.
         (a) Applicant. The applicant must reside on the block and is responsible for the event
including obtaining and returning barricades, set up and removal of barricades, cleanup of the public
right of way, and maintaining a 10-foot wide clear lane for emergency vehicles.
      (b) General Conditions. The Block Party may take place during daylight hours only. No
admission fees may be charged. Entertainment must not interfere with neighbors who do not live on
                                             -1-
the block. All participants must comply with all local, state, and federal laws, codes, and regulations.
No parked or moving vehicles shall be located within the venue during the event. Block Party
applications will be considered once per year per block. The city limits Block Parties to five per year
per neighborhood.
        (c) Block Party Petitions. All residents on the block must be contacted before the application
is submitted. For multi-unit dwellings/apartments, each unit must be contacted. At least 51% of the
residents on the block must be in favor of the party and must complete and sign the “Block Party
Petition” form.
       (d) Street Closure. Block parties may only be held on local streets approved by the City
Engineer. Only one block may be closed for one day for each Block Party. The street must be
accessible to emergency vehicles and personnel at all times. No block parties will be approved on
major streets or bus routes. Approved special events, planned road work, and other factors will be
considered when reviewing applications. The applicant must make access arrangements for
businesses and residents on the street to be closed, and all sidewalks must remain open for public
use. Barricades may be put in place to close streets up to 2 hour(s) prior to start of event, to allow for
set-up. The street must be clean, free of equipment, and restored to public access with the
barricades removed within one hour of the conclusion of the Block Party.
        (e) Barricades. City-owned barricades are to be used for all street closures. No other items
can be used to block the street. Barricades must be used during daylight hours only, and must be
easily removed for access by emergency vehicles. The applicant must pick up and return barricades
to the Department of Public Works, 1350 E. Keating Avenue. Costs to replace or repair any damaged
barricades will be invoiced to the applicant.
         (f) Damages. The city reserves the right to charge the applicant for costs relating to damages
to city property and/or equipment.
        (g) Inflatables. Inflatables, tents, and other items requiring staking are strictly prohibited on
city property, including the roadway, sidewalks, and terraces (the area between the street and
sidewalk).
        (h) Site Clean-up and Trash Disposal. The Applicant shall be responsible for clean-up of
City property after the event. This includes the removal of trash from the site (do not leave full trash
cans on site). The City shall have the right to enforce cleanup measures, including but not limited to
entry and cleaning of property by City personnel with costs charged to the property owner or event
applicant. The fee for clean-up done by city personnel is $60.00 per hour.
       (i) Noise. Block Party participants must comply with the city’s noise ordinance. Applicants
are instructed to be particularly mindful of parties near churches, schools, hospitals, and other
properties more sensitive to noise.
       (j) Liability Insurance. The applicant must provide proof of $300,000 liability insurance
coverage naming the City of Muskegon as an additional insured. You may use an insurance agent of
your choice. Please inform your insurance agent that the wording on the certificate must read:
       “The City of Muskegon, all elected and appointed officials, all employees and volunteers, all
       boards, commissions and/or authorities and board members, including employees and
       volunteers thereof; it is understood and agreed that by naming the City of Muskegon as
       additional insured, coverage afforded is considered to be primary and any other insurance the
       City of Muskegon may have in effect shall be considered secondary and/or excess.”

An acceptable certificate of insurance must be submitted no later than 10 days before the event date.
       (k) Compliance with all regulations. Block Party applicants/organizations are responsible to
ensure that all applicable laws and ordinances are followed. Failure to comply with all city ordinances,
rules and regulations may result in the denial of future block party requests.

                                           -2-
 BLOCK PARTY – QUICK REFERENCE GUIDE

                        * BEFORE *
  1. Review the City’s “Block Party Policy”.
  2. Make sure your proposed location is not on a restricted
     street (no major streets or bus routes).
  3. Contact an insurance agent to obtain a liability insurance
     policy covering your event.
  4. Contact all neighbors on the affected block and obtain the
     required signatures on the “Block Party Petition”
  5. Complete the “Block Party Application”.
  6. Visit the Planning Department in City Hall (room 202) to
     submit the application, fee, signed petition, and proof of
     liability insurance.

You will be notified of application approval or denial within 20
                 days of application submission

  7. Pick up barricades from the Department of Public Works
     building at 1350 E Keating Ave. between 9:00 AM and
     3:00 PM Monday through Friday, excluding holidays.
     Note that they are not open on Saturday or Sunday!

                        * DURING *
  1. Have your signed/approved Block Party Permit available
  2. Make sure no vehicles are parked in the block party area
  3. Set up barricades at both ends of the block – you may set
     out barricades up to 2 hours before event start time.
  4. Maintain a 10-foot clear lane for emergency vehicles

                         * AFTER *
  1.   Make sure all trash is picked up and removed from
       the area
  2.   Remove street barricades
  3. Return barricades to Department of Public Works building




                      -3-
2020 CITY OF MUSKEGON BLOCK PARTY APPLICATION
An application is required for any Block Party using City property. The application and fee must be submitted
to the City of Muskegon Planning Department at least 30 days prior to the Block Party.

    Return completed application with payment to the City of Muskegon Planning Department,
       P.O. Box 536, 933 Terrace St., Muskegon, MI 49443-0536. Telephone: 231.724.6702

►BLOCK PARTY FEES
                                           *Application fee may be refunded if the application is denied by the city.
 APPLICATION FEE                 $50*       Application fee will not be refunded if event is cancelled by the applicant.

 CLEANING FEE                              **Will be charged to the applicant after the event if city property is not returned to its
                            $60/hour**      original condition and/or trash is left on city property.
      If required




► I. BLOCK PARTY SUMMARY
NEIGHBORHOOD


BLOCK PARTY DATE
                                                                   Must be between May 1 and October 31
                                        START:                                      END:
TIME OF BLOCK PARTY
                                                              Start and end times must be during daylight hours

STREET TO BE CLOSED
                                        STREET NAME:
BETWEEN WHICH STREETS
   (limited to one block only)
                                        STREET NAME:



► II. APPLICANT INFORMATION
APPLICANT / RESPONSIBLE
PARTY’S NAME

APPLICANT ADDRESS

APPLICANT PHONE NO(s).

APPLICANT E-MAIL ADDRESS

CONTACT NAME & PHONE
NUMBER DURING EVENT
                                          Representative must be on site and available during event hours




► III. LIABILITY WAIVER
APPLICANT(S) voluntarily agree, understand and recognize that participants will have no right to make a
claim or file a lawsuit against the City arising out of the use of City property.

Use of City facilities is at your own risk, with participants exercising his/her own free choice to participate
voluntarily in this activity, and participants assume responsibility for any and all such risks and dangers.




Page | 1
► IV. REQUIREMENTS OF THE BLOCK PARTY PERMIT
           1. Applicant shall comply with all rules and regulations of the City of Muskegon Block Party Policy.

           2. Applicant shall comply with all City of Muskegon Ordinances.

           3. Applicant shall save the City of Muskegon harmless from all claims.

           4. At least 51% of the residents on the block must be in favor of the party and must sign the petition.

           5. City property will be left clean and free of litter. Failure of the applicant to satisfactorily clean the
               site may result in the City cleaning the site and billing the applicant for its services.

           6. The City reserves the right to deny changes to the application once final approval is given.

           7. Failure to provide any requested information in a timely manner or providing false information may
               result in denial or revocation of the block party permit.


With my signature, I certify that I have read and agree to the City of Muskegon Block Party Policy
and all items listed on this application. I further certify that I have contacted all households
and/or businesses on the affected block and have obtained their signatures on the Block Party
Petition form which is included with this application.

I agree to abide by all applicable ordinances & regulations.


______________________________________________________________________________________
      Signature of Applicant                                   Date

                   Thank you for helping us help you make your event safe and successful.


       Block party application submission
                    checklist:

   _____ City of Muskegon Block Party Application
   _____ $50 application fee
   _____ Block Party Petition with neighbor signatures
   _____ Copy of Liability Insurance Policy




   CITY STAFF USE ONLY:

   Approved by:

   ___________________________________________________________________                   ________________________
   Name                                                                                  Date

   ___________________________________________________________________
   Title



Page | 2
                                          City of Muskegon
                                 BLOCK PARTY PETITION
 APPLICANT’S NAME(S)

 BLOCK PARTY DATE
                                            Must be between May 1 and October 31
                                 START:                                  END:
 TIME OF BLOCK PARTY
                                           Start and end times must be during daylight hours

 STREET TO BE CLOSED
                                 STREET NAME:
 BETWEEN WHICH STREETS
   (limited to one block only)
                                 STREET NAME:

We, the undersigned, have been notified that the applicant(s) listed above is/are organizing a block
party to be held on the street I/we live on. By signing this petition, I/we indicate that we are not opposed
to the event and understand that that the street listed above will be closed to vehicular traffic during the
times of the party shown above.
Printed name & signature of block resident                                        Address

1.________________________________________________________ _____________________________

2.________________________________________________________ _____________________________

3.________________________________________________________ _____________________________

4.________________________________________________________ _____________________________

5.________________________________________________________ _____________________________

6.________________________________________________________ _____________________________

7.________________________________________________________ _____________________________

8.________________________________________________________ _____________________________

9.________________________________________________________ _____________________________

10._______________________________________________________ _____________________________

11._______________________________________________________ _____________________________

12._______________________________________________________ _____________________________

13._______________________________________________________ _____________________________

14._______________________________________________________ _____________________________

Use back of sheet for additional signatures if necessary.

If you have concerns about the City of Muskegon approving this block party or if you have questions about the
          block party permitting process, please contact the Planning Department at (231) 724-6702.
                      Agenda Item Review Form
                       Muskegon City Commission

Commission Meeting Date: 9/24/19                       Title: Rezoning of 1713 7th St

Submitted By: Mike Franzak                             Department: Planning

Brief Summary: Staff initiated request to rezone the property at 1713 7th St from I-2, Heavy
Industrial to B-4 General Business and MC, Medical Care. This area is categorized by many
different uses. In addition to residential homes, the Rescue Mission, Norchuck Supply, Keene
Lumber, a carpentry shop and other small businesses are located in the direct vicinity. Staff feels
that downzoning from heavy industrial to general business is appropriate for this neighborhood



Detailed Summary: The Planning Commission unanimously recommended approval at their
September meeting.



Amount Requested:                                    Amount Budgeted:

Fund(s) or Account(s):                               Fund(s) or Account(s):

Recommended Motion: To approve the rezoning from I-2, Heavy Industrial to B-4 General
Business and MC, Medical Care.




Check if the following Departments need to approve the item first:
Police Dept.
Fire Dept.
IT Dept.


For City Clerk Use Only:
Commission Action:
                                  Planning Commission Excerpt:
                                          STAFF REPORT
                                         September 12, 2019


Hearing, Case 2019-23: Staff initiated request to rezone the property at 1713 7th St from I-2, Heavy
Industrial to B-4 General Business and MC, Medical Care (northeast corner of property).


SUMMARY
   1. The property measures 2.7 acres and is zoned I-2, General Industrial.
   2. Park Street Storage, which was demolished in 2018, was previously located on this site. The City
      now owns the property.
   3. The City has been working with Catholic Charities of West Michigan on a land swap deal that
      would give this property to them and they would give their current building at the corner of
      3rd/Houston to the City. Catholic Charities of West Michigan would use this new property to
      construct a new office building (in the area zoned B-4) and also a rehab center (in the area zoned
      MC). The City would work with developers to create a mixed-use development on the corner of
      3rd/Houston.
   4. This area is categorized by many different uses. In addition to residential homes, the Rescue
      Mission, Norchuck Supply, Keene Lumber, a carpentry shop and other small businesses are
      located in the direct vicinity. Staff feels that a downzoning from heavy industrial to general
      business is appropriate for the neighborhood.
   5. Please see the zoning ordinance excerpts for I-2, B-4 and MC districts.


                                               1713 7th St
Depiction of how parcel would be rezoned. Outline near 7th/Dale would be MC, Medical Care.
The rest of the parcel would be B-4, General Business.
Zoning Map




Aerial View
                                       CITY OF MUSKEGON

                                    MUSKEGON COUNTY, MICHIGAN

                                        ORDINANCE NO.

An ordinance to amend the zoning map of the City to provide for a zone change for 1713 7th St from I-2,
                 General Industrial to B-4, General Business and MC, Medical Care.

THE CITY COMMISSION OF THE CITY OF MUSKEGON HEREBY ORDAINS:

The zoning map of the City of Muskegon is hereby amended to change the zoning for 1713 7th St from I-2, General
Industrial to B-4, General Business and MC, Medical Care.


         CITY OF MUSKEGON REVISED PLAT OF 1903 COM E LN BLK 450 AT POINT 10 FT S OF NE COR LOT
         9 FOR POB TH W ALONG CL OF 20 FT VAC ALLEY 174.35 FT TO POINT IN CL 9 FT E OF E LN LOT 6
         SD BLK 450 & 10 FT S OF NE COR LOT 6 SD BLK 450 (SD VAC ALLEY REFERRED TO: RNG E/W
         FROM SEVENTH ST TO E LN LOT 6 BLK 450) TH N ALNG CL OF VAC ALLEY RNG N/S FROM DALE
         AVE THRU BLK 450 259.21 FT TO S LN DALE AVE TH E 174.45 FT TO E LN BLK 450 TH S ALNG E LN
         SD BLK 258.95 FT TO POB -BEING ALL LOTS 10-14 BLK 450 INCL E 1/2 VAC ALLEY ABUTTING SD
         LOTS & N 1/2 OF VAC ALLEY RNG E/W ABUTTING LOT 10 BLK 450 ALSO COM E LN BLK 450 AT
         POINT 10 FT S OF NE COR LOT 9 SD BLK FOR POB TH S ALONG E LN SD LOT 9 & LOT 8 SD BLK &
         ALONG E LN IF EXTENDED S 110.08 FT TH W PAR WITH S LN SD BLK 450 186.7 FT TH N PAR WITH E
         LN SD BLK 450 64.3 FT TH W 13.25 FT TH N PAR WITH E LN SD BLK 2.15 FT TH W 148.72 FT TO W LN
         SD BLK AT A POINT 303.27 FT TO NW COR SD BLK TH N ALNG W LN SD BLK 450 303.27 FT TO NW
         COR SD BLK 450 TH E ALNG N LN 174345 FT TO CL OF VAC ALLEY RNG N/S FROM DALE AVE THRU
         SD BLK 450 TH S ALNG CL SD ALLEY 259.21 FT TO POINT ON CL VAC ALLEY SD CL BEING 9 FT E


This ordinance adopted:

Ayes:

Nayes:

Adoption Date:

Effective Date:

First Reading:

Second Reading:

                                                   CITY OF MUSKEGON

                                                    By: __________________________
                                                          Ann Meisch, MMC
                                                          City Clerk
                       CERTIFICATE (Rezoning 1713 7th St from I-2 to B-4 and MC)

The undersigned, being the duly qualified clerk of the City of Muskegon, Muskegon County, Michigan, does
hereby certify that the foregoing is a true and complete copy of an ordinance adopted by the City Commission
of the City of Muskegon, at a regular meeting of the City Commission on the 24th day of September, 2019, at
which meeting a quorum was present and remained throughout, and that the original of said ordinance is on file
in the records of the City of Muskegon. I further certify that the meeting was conducted and public notice was
given pursuant to and in full compliance with the Michigan Zoning Enabling Act, Public Acts of Michigan No.
33 of 2006, and that minutes were kept and will be or have been made available as required thereby.

DATED: ___________________, 2019            ________________________________
Ann Meisch, MMC
Clerk, City of Muskegon



Publish       Notice of Adoption to be published once within ten (10) days of final adoption.
                                                    CITY OF MUSKEGON
                                                   NOTICE OF ADOPTION

Please take notice that on September 24, 2019, the City Commission of the City of Muskegon adopted an
ordinance amending the zoning map to provide for the change of zoning for 1713 7th St from I-2 to B-4 and
MC:

         CITY OF MUSKEGON REVISED PLAT OF 1903 COM E LN BLK 450 AT POINT 10 FT S OF NE COR LOT
         9 FOR POB TH W ALONG CL OF 20 FT VAC ALLEY 174.35 FT TO POINT IN CL 9 FT E OF E LN LOT 6
         SD BLK 450 & 10 FT S OF NE COR LOT 6 SD BLK 450 (SD VAC ALLEY REFERRED TO: RNG E/W
         FROM SEVENTH ST TO E LN LOT 6 BLK 450) TH N ALNG CL OF VAC ALLEY RNG N/S FROM DALE
         AVE THRU BLK 450 259.21 FT TO S LN DALE AVE TH E 174.45 FT TO E LN BLK 450 TH S ALNG E LN
         SD BLK 258.95 FT TO POB -BEING ALL LOTS 10-14 BLK 450 INCL E 1/2 VAC ALLEY ABUTTING SD
         LOTS & N 1/2 OF VAC ALLEY RNG E/W ABUTTING LOT 10 BLK 450 ALSO COM E LN BLK 450 AT
         POINT 10 FT S OF NE COR LOT 9 SD BLK FOR POB TH S ALONG E LN SD LOT 9 & LOT 8 SD BLK &
         ALONG E LN IF EXTENDED S 110.08 FT TH W PAR WITH S LN SD BLK 450 186.7 FT TH N PAR WITH E
         LN SD BLK 450 64.3 FT TH W 13.25 FT TH N PAR WITH E LN SD BLK 2.15 FT TH W 148.72 FT TO W LN
         SD BLK AT A POINT 303.27 FT TO NW COR SD BLK TH N ALNG W LN SD BLK 450 303.27 FT TO NW
         COR SD BLK 450 TH E ALNG N LN 174345 FT TO CL OF VAC ALLEY RNG N/S FROM DALE AVE THRU
         SD BLK 450 TH S ALNG CL SD ALLEY 259.21 FT TO POINT ON CL VAC ALLEY SD CL BEING 9 FT E

Copies of the ordinance may be viewed and purchased at reasonable cost at the Office of the City Clerk in the
City Hall, 933 Terrace Street, Muskegon, Michigan, during regular business hours.

This ordinance amendment is effective ten days from the date of this publication.

Published ____________________, 2019                           CITY OF MUSKEGON

By ___________________________
Ann Meisch, MMC
City Clerk

---------------------------------------------------------------------------------------------------------------------

PUBLISH ONCE WITHIN TEN (10) DAYS OF FINAL PASSAGE.

Account No. 101-80400-5354
                     Agenda Item Review Form
                      Muskegon City Commission

Commission Meeting Date: September 24, 2019     Title: Community Relations Committee
                                                Recommendations

Submitted By: Ann Marie Meisch                  Department: Clerk


Brief Summary: Staff is seeking approval of the recommendations by the Community
Relations Committee to accept the resignations of Scott Banninga from the
CDBG/Citizen’s District Council-Citizen representing Ward 2 and Clyde Whitehouse-
Business Improvement District-Assessed property owner and to accept the appointment of
Kathy Dennison to the Business Improvement District.

Detailed Summary:




Amount Requested: N/A                          Amount Budgeted: N/A

Fund(s) or Account(s): N/A                     Fund(s) or Account(s): N/A

Recommended Motion: To concur with the recommendations of the Community Relations
Committee and approve the resignations and appointment.




For City Clerk Use Only:


Commission Action:
                       Agenda Item Review Form
                        Muskegon City Commission

Commission Meeting Date: 9/24/19                      Title: CAPER 2018

Submitted By: Oneata Bailey                           Department: Community & Neighborhood
                                                      Services

Brief Summary: Request to conduct a Public Hearing of the 2018 Consolidated Annual Performance
               Evaluation Report (CAPER) for projects funded with CDBG and HOME HUD
               Entitlements to the City of Muskegon, Community & Neighborhood Services
               Department.




Detailed Summary:

https://www.muskegon-mi.gov/cresources/CAPER%202019-2020.pdf




Amount Requested: N/A                                Amount Budgeted: N/A

Fund(s) or Account(s): N/A                           Fund(s) or Account(s): N/A

Recommended Motion: To close the public hearing and submit the 2018 CAPER including any public
comments received during the 20 day comment period ending September 27, 2019.

Check if the following Departments need to approve the item first:
Police Dept.
Fire Dept.
IT Dept.


For City Clerk Use Only:
Commission Action:
                      Agenda Item Review Form
                       Muskegon City Commission

Commission Meeting Date: September 24, 2019             Title: Royale Glen Partnership

Submitted By: Frank Peterson                            Department: City Manager

Brief Summary: The owner of Royale Glen are requesting a five-year term extension and a 3
percentage point reduction in the annual PILOT Payments at Royale Glenn Apartments. In
exchange, the ownership group is committing to invest $600,000 in apartment
upgrades/improvements and $156,000 for improvements at Campbell Field.

Detailed Summary: Campbell Field previously housed the West Little League program. Over the
past 20+ years, local participation in little league baseball has waned significantly. As a result,
Campbell Field has only one field that is properly maintained by Muskegon Catholic Central, and
three fields that are poorly maintained for the majority of the year. Staff is proposing that the three
unmaintained fields be removed, and the space be reforested with appropriate trees. Additionally,
the current playground would be removed and replaced, and a walking trail would be added,
connecting Royale Glen Apartments to the new playground. Royale Glen is home to many families
with children that would benefit from additional access to the park as well as the upgrades to the
rental units. We envision Campbell Field eventually functioning similarly to Seyferth Park. The
park project would be at least partially financed by a $156,000 contribution from Royale Glenn
Apartments. Any costs above that amount would be financed by the City’s General Fund. The
PILOT reduction is expected to cost the city approximately $5,500 annually. If this is agreeable to
Commissioners, staff will begin engaging the neighborhood relative to their desires for the park.

Amount Requested:                                     Amount Budgeted:

Fund(s) or Account(s):                                Fund(s) or Account(s):

Recommended Motion: To authorize staff to negotiate an amendment to the Royale Glen PILOT
Agreement to include an extension to April 1, 2030, a 1% City Service Fee, 1% PILOT Fee, and a
requirement to invest at least $600,000 in capital maintenance at Royale Glen and at least
$156,000 in capital improvements at Campbell Field Park..

Check if the following Departments need to approve the item first:
Police Dept.         Fire Dept.          IT Dept.


For City Clerk Use Only:
Commission Action:
                     Agenda Item Review Form
                      Muskegon City Commission

Commission Meeting Date: September 24, 2019           Title: Construction Agreement – Clark

Submitted By: Frank Peterson                          Department: City Manager

Brief Summary: Staff is seeking authorization to enter into the construction management
agreement with Clark Construction for the construction of the Downtown Convention Center. The
Construction costs are $17,203,211, which is on target with the latest engineer estimate and will
keep the entire project within the current $19.4 Million budget.

Detailed Summary: The convention center will be funded via a 30-year general obligation bond,
which is expected to be issued in October. The annual payments, currently estimated at
$1,050,000 annually will be paid via the terms of a development agreement that sets aside hotel
room revenues to meet the debt obligations. Staff is recommending that Clark not be obligated to
obtain a performance bond as part of this project, as all subcontractors have completed
background evaluations and staff is confident in their respective ability to perform.

Amount Requested: $17,203,211                        Amount Budgeted: $0

Fund(s) or Account(s): Public Improvement            Fund(s) or Account(s):

Recommended Motion: Waive the performance bond requirements for the Convention Center
Project, authorize the Construction Management Contract with Clark Construction in the amount of
$17,203,211, and authorize the Mayor to sign the contract.

Check if the following Departments need to approve the item first:
Police Dept.         Fire Dept.         IT Dept.


For City Clerk Use Only:
Commission Action:
EXHIBIT A -
Clarifications/Assumptions
                                                                          August 30, 2019

Muskegon Convention Center                                                  EXHIBIT A
Basis of Estimate for GMP


PROJECT SCOPE

   1. This document is an outline of the assumptions and clarifications made for this
      Construction Drawing Set estimate on drawings and specifications from
      Progressive AE (“PAE”) as listed below under the Document List.
   2. A Design Development (“DD”) estimate was submitted on 2/12/19 for team review
      based on the PAE Design Development Drawings dated 1/21/19.
      a. The original DD Estimate included $18,340,882 in direct estimate construction
         costs and a total (including Contingency, supervision/GC’s/fee/etc.) of
         $20,398,218.
      b. A team VE session was held in April 2019 with the PAE, Construction Simplified
         (“CS”), and Clark (“CCC”) team to propose, estimate, and review potential
         scope changes and/or reductions. Based upon the items identified on the
         “190408 CS Tracking Story” summary from the meeting, the team agreed to a
         scope and design that was estimated as having a total project cost of
         $17,219,469. The directive to the design team was for the design progression
         to include the items agreed to as part of this VE session.
   3. Clark issued the following Bid Packages as part of the procurement process:
      a. Bid Package #1 – Hotel chiller relocation, dated 3/7/19
      b. Bid Package #2 – Earthwork / Utilities & Hotel Electrical, dated 6/26/19
      c. Bid Package #3 – Concrete Foundations / Flatwork, Site Concrete, dated
         7/8/19
      d. Bid Package #4 – Balance of Work, dated 8/12/19

DOCUMENT LIST

   1. PAE drawings as noted in Exhibit G – List of Documents, attached
   2. PAE specifications as noted in Exhibit G – List of Documents, attached


BASIS OF ESTIMATE

   1. The following items are included per the Construction Documents or specified
      allowances
      a. Stabilization of existing Delta Hotel (formerly Holiday Inn Muskegon)
          foundations
      b. Reinforcing of LC Walker Arena roof as shown and as required to support
          additional snow loading
      c. Remove and repair roofing as needed for LC Walker Arena
      d. Selective demolition of items “D01-D18” for LC Walker Arena retrofitting work

                                                                               1|Page
Muskegon Convention Center


        e. Snow melt system, piping, manifold, skid, and associated equipment for a
           complete system
        f. The convention center will have a stand-alone Fire Alarm system and will not
           have annunciation capabilities to communicate with either the LC Walker Arena
           or adjacent Delta Hotel (formerly Holiday Inn Muskegon)
        g. Insulated metal wall panels – three (3) colors, repeating pattern
        h. Low Voltage conduit/raceway only (wire/terminations by Owner)

ALLOWANCES

   1. An allowance of $200,000 is included for a 3rd Street Entrance into the existing
      hotel. PAE is to work to design to this budget to be procured by Clark.

CLARIFICATIONS / ASSUMPTIONS

   1. No costs are included for any LEED requirements or documenting staff for LEED.
   2. No BIM efforts or processes have been included.
   3. All sales taxes are currently included, per direction of Owner’s Representative
   4. Clark will ensure that the subcontractors participate in the commissioning-assist
      process
   5. Existing sprinkler system water pressure capacity is high enough to meet capacity
      of design load, based on City of Muskegon calculations provided
   6. Assumed normal working hours
   7. Construction cleaning is included prior to turnover to owner. Final building clean
      by Owner.

EXCLUSIONS


   1.   Exterior and Interior signage (by Owner).
   2.   Jockey pump and/or new fire protection service.
   3.   Containment/hazardous soil removal (by Owner)
   4.   Liquidated damages
   5.   Lightning protection of all existing and new buildings
   6.   Voice system including speakers
   7.   Division 27 Communications
   8.   Low voltage wiring
   9.   Card readers (by Owner)
  10.   Utility consumption costs during construction (by Owner)
  11.   Security cameras, head-end equipment and security cabling (review w/ CS)
  12.   Electrical feeds and fiber feeds for additional service
  13.   Dumpsters for Owner FF&E
  14.   Third party testing or commissioning (except for testing and balancing)

                                     END OF DOCUMENT


                                                                               2|Page
EXHIBIT B - GMP
Budget Summary
                                                              Muskegon Convention Center
                                                              Exhibit B - GMP Budget Summary

    Client:       City of Muskegon                        Project      New Muskegon Convention Center

    Location:     Muskegon, MI                          Updated:           9/10/2019

    Job Number       2811                                     By:         DK / TW / RC



1   Building and Sitework                              Area                                      Cost              Total

    GMP Estimate Summary
    **Estimate Based on the Progressive AE Construction Drawings
    Bid Pack #1 - Chiller Relocation                                                        $        68,840
    Bid Pack #2 - Site                                                                      $     1,122,861
    Bid Pack #3 - Concrete                                                                  $     1,263,397
    BC 1 - Soil Stabilization                                                               $       333,000
    BC 4 - Masonry                                                                          $       690,207
    BC 5 - Structural Steel                                                                 $     1,745,000
    BC 6 - General Trades                                                                   $       839,532
    BC 7A - Metal Wall Panels                                                               $       999,767
    BC 7B - EPDM Roofing                                                                    $       600,920
    BC 8 - Glass & Glazing                                                                  $       698,910
    BC 9A - Metal Studs & Drywall Accoustical                                               $     2,403,350
    BC 9B - Flooring & Wall Tile                                                            $       677,564
    BC 9C - Painting                                                                        $       170,000
    BC 10 - Folding Panel Partitions                                                        $       393,300
    BC 14 - Elevators                                                                       $       190,500
    BC 21 - Fire Supression                                                                 $        87,170
    BC 22 - Plumbing                                                                        $       787,900
    BC 23 - HVAC                                                                            $     1,272,000
    BC 22/23 - Combined Bid Savings                                                         $       (86,900)
    ELECTRICAL                                                                              $     1,052,500
    ALLOWANCE - 3RD STREET ENTRANCE                                                         $       200,000
    ALLOWANCE - PARKING GARAGE UPGRADING COSTS                                              $       134,000


                                                          54,689 SF                         Subtotal:
                                                                                                               $     15,643,818
    Contingency
2   Design and Estimating Contingency                      0.00%                            $           -
    Escalation Contingency                                 0.00%                            $           -
    Construction Contingency                                                                $       400,000
    Buyout Contingency                                                                                 TBD

                                                                                            Subtotal:
                                                                                                               $           400,000
    Supervision, General Conditions, Bonding, Insurances
3   General Conditions                                                                      $       136,840
    Project Staffing                                                                        $       469,969
    Building Permit Cost - added in 4/8/19 VE Mtg                                           $       111,000
    CM Bond - removed via 4/8/19 VE session, approved by FP                                 $           -
    GLI Insurance (based on total project )                 0.60%              17,203,211   $       103,219
    Subcontractor Default Insurance - removed via 4/8/19 VE session, approved by FP         $           -
                                                                                            Subtotal:
                                                                                                               $           821,028
    Subtotal Construction Cost                                                              Subtotal:
4                                                                                                              $     16,864,846
    Construction Fee
5   Clark Construction Fee                                                                  $       300,000
    Preconstruction Services (lump sum)                                                     $        38,365

                                                                                            Subtotal:
                                                                                                               $           338,365
    Total Construction Cost                                                                 Subtotal:
6                                                                                                              $     17,203,211
     Potential VE Items:


                                                                                   Estimated              Bid                 Bid
1    Remove operable partitions (Owner to procure later)                                           $       (301,780)
2    Paint in leu of interior brick                                            $        (86,200)   $       (215,000)
3    Ceiling grid and pads in leu of wood ceiling                              $       (177,330)   $       (155,000)
4    Polished concrete in leu of Terrazzo flooring                             $       (186,375)   $       (146,650)
5    Move Generators for Hotel and Convention Center to the Ground             $       (120,000)   $       (120,000)
6    Reduce acoustic baffle ceiling by 1/2                                     $       (171,120)   $       (113,500)
7    Paint in lieu of fabric wrapped wall panels                               $        (34,450)   $       (112,850)
8    Using Carrier as approved manufacturer ILO Trane                                              $       (100,000)
9    Relocate and reuse existing hotel generator.                              $        (90,000)   $        (90,000)
10   Paint in lieu of wood veneer wall paneling                                $        (44,200)   $        (60,000)
11   Paint in lieu of porcelain wall tiles                                     $       (106,674)   $        (56,340)
12   Paint in leu of wall coverings.                                           $        (28,340)   $        (40,000)
13   Standard carpet in leu of specified carpet                                $        (41,106)   $        (34,536)
     Standard steel stairs with standard railing in leu of glazed decorative
14   guardrail.                                                                $        (33,750)   $           (19,800)
15   Paint in lieu of high impact wall protection                              $        (22,080)   $           (14,550)
16   Standard finish window frame in leu of custom finish                      $        (32,755)   $            (9,275)
17   Standard glass in leu of custom                                           $        (87,514)   $               -
     Dry Fire Suppression System in exterior canopy (add to base bid if
18                                                                             $         25,000    $           18,062
     req'd)
19   Move door 112B to column line 9, leading to MECHANICAL STAIR S3. $                 (45,000)                 TBD
20   Resizing/relocation of mechanical room                                                                      TBD
21   Add top layer of sound board to roofing system                                                $           25,920
22   Reduction of parking garage upgrade costs                                                                   TBD
23   Reduction of 3rd St. entrance design                                                                        TBD
24   Use of furring channel ILO z-girt for metal panels                                                                                TBD
25   Reduction of glass into top of box into conference space                                                                          TBD
26   Alternate supplier for park benches                                                                                               TBD
27   Flooring VE / Dean List                                                                                                           TBD
28   Substitute operable partition fabric                                                                                 $         (50,200)
29   Remove subdivided operable partitions                                                                                             TBD
30   Use Moderco for operable partitions ILO base bid                                              $           (91,520)                TBD


                                                                                                                          $     (1,687,019)
     Potential GMP Total Including Potential VE Items                                              Subtotal:
                                                                                                                          $    15,516,193
     Items currently in the GMP Budget that were not included in original $17.2M program

                                                                                                       Estimated
     Site electric (DD budget = $25k, final bid = $273,845                                         $       248,845
     Added / additional generator for Hotel (per Safe-Built requirements)                                     TBD
     Steel retrofits for LC Walker                                                                 $        22,500
     Steel retrofits for hotel                                                                     $        14,820
     Selective demo for Delta Hotel steel retrofits                                                           TBD
     Original Option #4 Combined Entry (budget: $562,954, current estimate: $996,912)              $       433,958
     Post Bid Addendum 1 - concrete changes only                                                   $       124,326
     Post Bid Addendum 1 - TBD (civil, per 8/30/19 PAE discovery)                                             TBD
     Snow melt system                                                                              $       154,940
     Hotel dumpster enclosure                                                                      $        33,330
     Parking Garage Upgrading Costs                                                                $       134,000
     Site stabilization ($333,000 low bid) vs. jet grouting 4' only ($50,000)                      $       283,000

                                                                                                                          $     1,449,719
EXHIBIT C -
Contingency
                                 Muskegon Convention Center Project

                                         Clark Construction Co.

                       Exhibit C – Construction Contingency Definition and Use

                                          September 10, 2019

The GMP shall include a contingency (hereinafter the “Contingency”) in an amount as defined in Exhibit
B – GMP project budget (exclusive of insurance, and bonding). Subject to the exceptions set forth in this
Exhibit C, the Contingency shall be available for Construction Manager’s use with Owner’s prior written
approval, for planned reimbursement of costs and expenses: (1) reasonably incurred by the
Construction Manager in performing the Work; (2) of a type that are reimbursable under this Agreement
as a Cost of the Work; and (3) that are not otherwise the basis for Change Order; including, by way of
example, but not limited to: (a) Work items inadvertently omitted during the estimating and bidding
process (which were reasonably inferable from the Contract Documents) by the Construction Manager,
provided Subcontractor items of work inadvertently omitted in their proposal are not to be reimbursed;
(b) schedule recovery costs associated with weather and other causes of delay that are not otherwise
compensable and not the result of actions or lack of action by the Construction Manager; (c) cost
increases due to unanticipated local labor and material conditions; (d) interfacing omissions between
and from the various categories of work; (e) additional costs incurred due to the withdrawal or
disqualification of a Subcontractor bid forming basis for the Guaranteed Maximum Price prior to
execution of a written Subcontract; and (f) additional costs incurred as a result of the failure of a
Subcontractor to perform corrective work.

No sums may be charged to the Contingency except with prior written approval of Owner, and then only
to the extent that such costs have or will be incurred by Construction Manager. Not more than five
percent (5%) of the Contingency shall be available for General Conditions Costs in excess of the base
contract General Conditions. Notwithstanding anything to the contrary, no sums may be charged to the
Contingency for costs which arise out of Construction Manager’s (or its Subcontractors) intentional
misconduct, gross negligence or a material breach of this Agreement or the executed subcontractor
agreements. Construction Manager shall not be entitled to payment of sums from the Contingency to
the extent: (i) such sums may be properly chargeable to a Subcontractor or other responsible person or
entity directly against the Subcontractor, or (ii) Construction Manager failed to notify Owner or its
insurance carrier, if applicable, of the event which results in the claim to the Contingency in a timely
fashion. Any Contingency remaining as of Final Completion shall revert back to Owner.
  EXHIBIT D -
Milestone Schedule
                                                                                                                          2018                                        2019                                                                              2020                                                                 2021
                                                                       Original
   ID                          Description                                         Start       Finish                   Nov Dec     Jan   Feb    Mar   Apr   May   Jun    Jul           Aug    Sep   Oct   Nov   Dec   Jan   Feb   Mar   Apr   May   Jun    Jul   Aug   Sep   Oct   Nov   Dec   Jan    Feb             Mar      Apr   May   Jun
                                                                       Duration

  Muskegon Convention Center
   CM Selection
    5   Issue CM RFQ                                                          0   10/29/18A                             Issue CM RFQ
   10   CM RFQ Response                                                     13    10/29/18A 11/14/18A                     CM RFQ Response
   15   Evaluate RFQ / Shortlist to RFP                                       5   11/15/18A 11/21/18A                      Evaluate RFQ / Shortlist to RFP
   20   Issue CM RFP                                                          0   11/26/18A                                Issue CM RFP
   25   CM RFP Response                                                     16    11/26/18A 12/17/18A                             CM RFP Response
   30   Evaluate RFP / Shortlist to Interview                                 2   12/18/18A 12/19/18A                             Evaluate RFP / Shortlist to Interview
   35   CM Interviews / CM Selection                                          5   12/20/18A 12/28/18A                               CM Interviews / CM Selection
   40   Notice to Commence Pre-Construction Services                          0   12/31/18A                                         Notice to Commence Pre-Construction Services
   Design & Approvals
   45   Development of 50% DD Drawings                                      45    10/29/18A 01/04/19A                                Development of 50% DD Drawings
   50   Complete Sitework Design/Early Release                                4   04/12/19A 06/25/19A                                                                   Complete Sitework Design/Early Release
   55   Complete Footing/Foundations Design/Release                           1   04/12/19A 07/01/19A                                                                       Complete Footing/Foundations Design/Release
   60   Complete Balance of Work Design/Release                             72    04/12/19A 08/09/19A                                                                                     Complete Balance of Work Design/Release
   65   Phase 1 and Phase 2 Approval                                          0               07/08/19A                                                                                Phase 1 and Phase 2 Approval

   Preconstruction
   70   DD Budget Development                                               15    01/07/19A 01/25/19A                                     DD Budget Development
   75   GMP Development from DD Set                                         15    01/28/19A 02/15/19A                                           GMP Development from DD Set

   Procurement
   80   PAE Bid Pack 2 Site Package Complete                                  0   06/25/19A                                                                             PAE Bid Pack 2 Site Package Complete
   85   Bid Pack 2 Sitework Bidding Period                                  11    06/26/19A 07/11/19A                                                                                Bid Pack 2 Sitework Bidding Period
   90   Pre-Bid Walk through Sitework                                         0   07/02/19A                                                                                 Pre-Bid Walk through Sitework
    95 Bid Pack 2 Pre-Bid RFI's Due                                           0   07/04/19A                                                                                   Bid Pack 2 Pre-Bid RFI's Due
   100 Bid Pack 2 Sitework Pre-Awards                                         5   07/12/19A    07/18/19                                                                               Bid Pack 2 Sitework Pre-Awards
   105 Bid Pack 2 Issue Subcontracts / Release Submittals                     5    07/19/19    07/25/19                                                                                Bid Pack 2 Issue Subcontracts / Release Submittals
   110 Engineered Shoring Submittals                                        30     07/26/19    09/05/19                                                                                       Engineered Shoring Submittals
   115 Temp Shoring Material Procurement                                    30     07/26/19    09/05/19                                                                                         Temp Shoring Material Procurement
   120 Sitework / Utility Submittals                                        10     07/26/19    08/08/19                                                                                  Sitework / Utility Submittals
   125 PAE Bid Pack 3 Footings/Foundations Package Complete                   0   07/01/19A                                                                                PAE Bid Pack 3 Footings/Foundations Package Complete
   130 Bid Pack 3 Footings/Foundations CC Review                              4   07/01/19A 07/05/19A                                                                          Bid Pack 3 Footings/Foundations CC Review
   135 Bid Pack 3 Footings/Foundations Bidding Period                       14    07/08/19A    07/25/19                                                                                Bid Pack 3 Footings/Foundations Bidding Period
   140 Bid Pack 3 Footings/Foundations Pre-Bid RFI's Due                      0   07/17/19A                                                                                          Bid Pack 3 Footings/Foundations Pre-Bid RFI's Due




                                                                                                                                                                         Data Date
   145 Bid Pack 3 Footings/Foundations Pre-Awards                             3    07/26/19    07/30/19                                                                                 Bid Pack 3 Footings/Foundations Pre-Awards
   150 Bid Pack 3 Footings/Foundations Issue Contracts                        3    07/31/19    08/02/19                                                                                 Bid Pack 3 Footings/Foundations Issue Contracts
   155 Foundation / Rebar Submittals                                        15     08/05/19    08/23/19                                                                                       Foundation / Rebar Submittals




                                                                                                                                                                                                                                                                                                      Project Finish
                                                                                                        Project Start




   160 PAE Bid Pack 4 Balance of Work                                         0   08/09/19A                                                                                              PAE Bid Pack 4 Balance of Work
   165 Bid Pack 4 Balance of Work CC Review                                 10     08/09/19    08/22/19                                                                                       Bid Pack 4 Balance of Work CC Review
   170 Bid Pack 4 Balance of Work - Bidding Period                          15    08/12/19A 09/05/19A                                                                                           Bid Pack 4 Balance of Work - Bidding Period

                                              Start Date:   10/29/18                                                              City of Muskegon / County of Muskegon
                                             Finish Date:   01/29/21                                                                   Muskegon Convention Center
                                              Data Date:    07/18/19
                                               Run Date:    09/10/19                                                                      09.10.19 GMP Exhibit D



Exhibit D - Milestone Schedule.ppx                          Page 1A
                                                                                                                        2018                                       2019                                                                                   2020                                                                    2021
                                                                      Original
   ID                         Description                                         Start      Finish                   Nov Dec     Jan   Feb   Mar   Apr   May   Jun    Jul         Aug    Sep     Oct    Nov   Dec       Jan   Feb   Mar   Apr   May   Jun    Jul   Aug   Sep     Oct   Nov   Dec    Jan    Feb             Mar      Apr   May   Jun
                                                                      Duration
   175 Bid Pack 4 Pre Bid RFI's Due                                          0   08/23/19A                                                                                               Bid Pack 4 Pre Bid RFI's Due
   180 Bid Pack 4 Balance of Work Pre-Awards                                 4    09/06/19   09/11/19                                                                                        Bid Pack 4 Balance of Work Pre-Awards
   185 Issue Subcontracts / Release Submittals                               5    09/12/19   09/18/19                                                                                           Issue Subcontracts / Release Submittals
   190 MEP Submittals                                                      29     09/19/19   10/29/19                                                                                                    MEP Submittals
   195 MEP Lead Times                                                      74     10/30/19   02/12/20                                                                                                                            MEP Lead Times
   200 Architectural Submittals                                            29     09/19/19   10/29/19                                                                                                    Architectural Submittals
   205 Architectural Lead Times                                            74     10/30/19   02/12/20                                                                                                                            Architectural Lead Times
   Construction
    Muskegon Events
     Clark Construction
   210 Taste of Muskegon 2019                                                5   06/19/19A 06/25/19A                                                                 Taste of Muskegon 2019
   215 "Ridestock" Bike Week 2019                                            5   07/18/19A 07/21/19A                                                                              "Ridestock" Bike Week 2019
   220 MI Irish Music Festival 2019                                          5    09/09/19   09/13/19                                                                                        MI Irish Music Festival 2019
   225 Taste of Muskegon 2020                                                5    06/17/20   06/23/20                                                                                                                                                       Taste of Muskegon 2020
   230 "Ridestock" Bike Week 2019                                            5    06/29/20   07/03/20                                                                                                                                                         "Ridestock" Bike Week 2019
   235 MI Irish Music Festival 2019                                          5    09/14/20   09/18/20                                                                                                                                                                           MI Irish Music Festival 2019
    Site
     Clark Construction
   240 Summary - Site Construction                                         81     07/26/19   11/15/19                                                                                                       Summary - Site Construction
   245 Phase 1 and Phase 2 Soil Study                                      20    07/29/19A   08/23/19                                                                                    Phase 1 and Phase 2 Soil Study
   250 Mobilization / Secure Site                                            1    08/15/19   08/15/19                                                                                 Mobilization / Secure Site
   255 SWPP Installation                                                     5    08/16/19   08/22/19                                                                                     SWPP Installation
   260 Install Security / Construction Fencing                               3    08/16/19   08/20/19                                                                                    Install Security / Construction Fencing
   265 Demolition                                                          32     08/21/19   10/03/19                                                                                             Demolition
   270 Strip Site                                                          10     08/26/19   09/06/19                                                                                       Strip Site
   275 Balance Site                                                        10     09/02/19   09/13/19                                                                                        Balance Site
   280 Owner Move Utilities                                                34     09/16/19   10/31/19                                                                                                    Owner Move Utilities
   285 Site Utilities                                                      30     09/16/19   10/25/19                                                                                                   Site Utilities
   290 Excavations                                                         35     09/30/19   11/15/19                                                                                                      Excavations
   295 Temp Engineered Shoring                                             14     10/14/19   10/31/19                                                                                                    Temp Engineered Shoring
   300 Fill Site to Grade                                                  15     11/18/19   12/09/19                                                                                                            Fill Site to Grade
    Building
     Clark Construction




                                                                                                                                                                      Data Date
   305 Summary - Building Construction                                    272    12/09/19A   12/23/20                                                                                                                                                                                               Summary - Building Construction
   310 Footings/Foundations                                                35     09/30/19   11/15/19                                                                                                       Footings/Foundations
   315 Structural Steel Main Level Framing & Deck                          13     11/18/19   12/05/19                                                                                                           Structural Steel Main Level Framing & Deck




                                                                                                                                                                                                                                                                                                           Project Finish
                                                                                                      Project Start




   320 Elevator Shafts                                                     20     11/25/19   12/23/19                                                                                                                Elevator Shafts
   325 Structural Steel Lower Roof & Deck                                  16     12/06/19   12/30/19                                                                                                                 Structural Steel Lower Roof & Deck
   330 Structural Steel High Roof & Deck                                   16     12/31/19   01/21/20                                                                                                                     Structural Steel High Roof & Deck

                                             Start Date:   10/29/18                                                             City of Muskegon / County of Muskegon
                                            Finish Date:   01/29/21                                                                  Muskegon Convention Center
                                             Data Date:    07/18/19
                                              Run Date:    09/10/19                                                                     09.10.19 GMP Exhibit D



Exhibit D - Milestone Schedule.ppx                         Page 2A
                                                                                                                          2018                                       2019                                                                             2020                                                                   2021
                                                                       Original
   ID                          Description                                         Start       Finish                   Nov Dec     Jan   Feb   Mar   Apr   May   Jun    Jul        Aug   Sep   Oct   Nov   Dec   Jan   Feb    Mar   Apr     May   Jun    Jul    Aug   Sep   Oct   Nov    Dec   Jan    Feb             Mar      Apr   May   Jun
                                                                       Duration
   335 Exterior Framing                                                     35     01/02/20    02/19/20                                                                                                                       Exterior Framing
   340 Exterior Finishes                                                    60     02/20/20    05/13/20                                                                                                                                        Exterior Finishes
   345 Sitework & Hardscapes between LC Walker & Convention Center15               03/26/20    04/15/20                                                                                                                                    Sitework & Hardscapes between LC Walker & Convention Center
   350 LC Walker Main Ticket Booth Entrance Open                              0               06/02/20A                                                                                                                                               LC Walker Main Ticket Booth Entrance Open
   355 Exterior Windows                                                     35     02/06/20    03/25/20                                                                                                                              Exterior Windows
   360 Roofing                                                              25     03/26/20    04/29/20                                                                                                                                    Roofing
   365 Elevator Installation                                                31     04/21/20    06/02/20                                                                                                                                            Elevator Installation
   370 Building Enclosed                                                      0                04/29/20                                                                                                                                        Building Enclosed
   375 M/E Overhead RI                                                      60     04/30/20    07/22/20                                                                                                                                                         M/E Overhead RI
   380 Concrete Floors                                                      25     04/30/20    06/03/20                                                                                                                                            Concrete Floors
   385 Remaining Landscaping / Hardscapes                                   18     05/14/20    06/08/20                                                                                                                                             Remaining Landscaping / Hardscapes
   390 Metal Studs                                                          35     06/04/20    07/22/20                                                                                                                                                         Metal Studs
   395 Mechanical/Electrical in-wall Rough-in                               35     07/23/20    09/09/20                                                                                                                                                                 Mechanical/Electrical in-wall Rough-in
   400 Hanging and Finishing                                                50     08/06/20    10/14/20                                                                                                                                                                        Hanging and Finishing
   405 Painting/Wallpaper                                                   30     09/17/20    10/28/20                                                                                                                                                                            Painting/Wallpaper
   410 Interior Brick                                                       35     08/13/20    09/30/20                                                                                                                                                                      Interior Brick
   415 Ceilings                                                             20     10/01/20    10/28/20                                                                                                                                                                            Ceilings
   420 Flooring                                                             27     10/15/20    11/20/20                                                                                                                                                                                  Flooring
   425 M/E Finishes                                                         25     10/29/20    12/02/20                                                                                                                                                                                    M/E Finishes
   430 Final Cleaning                                                       15     12/03/20    12/23/20                                                                                                                                                                                       Final Cleaning
   Closeout
    All Areas
     Clark Construction
   440 Punchlist                                                            42    12/03/20A 12/31/20A                                                                                                                                                                                           Punchlist
   450 Substantial Completion                                                 0               12/31/20A                                                                                                                                                                                             Substantial Completion
   455 Owner FFE                                                              0   12/31/20A                                                                                                                                                                                                     Owner FFE
   460 Closeout                                                             22    12/31/20A 01/29/21A                                                                                                                                                                                                   Closeout




                                                                                                                                                                        Data Date




                                                                                                                                                                                                                                                                                                      Project Finish
                                                                                                        Project Start




                                              Start Date:   10/29/18                                                              City of Muskegon / County of Muskegon
                                             Finish Date:   01/29/21                                                                   Muskegon Convention Center
                                              Data Date:    07/18/19
                                               Run Date:    09/10/19                                                                      09.10.19 GMP Exhibit D



Exhibit D - Milestone Schedule.ppx                          Page 3A
EXHIBIT E - List of
   Documents
                                                          EXHIBIT GE
                                                       SECTION 000115
                                                  LIST OF DRAWING SHEETS

         1.      LIST OF DRAWINGS PREPARED BY PROGRESSIVE AE

SHEET    TITLE
NO.
         GENERAL
TD003
TD001    TITLE DRAWING                                                                   8/21/19
                                                                                          8/9/19
 G001    ABBREVIATIONS, SYMBOLOGY, ACCESSIBILITY                                          8/9/19
 G100    LOWER LEVEL CODE COMPLIANCE PLAN                                                 8/9/19
 G101    MAIN LEVEL CODE COMPLIANCE PLAN                                                  8/9/19
         CIVIL
 C101    TOPOGRAPHIC SURVEY                                                               7/9/19
 C102    DEMOLITION PLAN                                                                 8/21/19
                                                                                          7/9/19
 C201    SITE LAYOUT PLAN                                                                8/21/19
                                                                                          7/9/19
 C301    SITE GRADING AND STORMWATER PLAN                                                8/21/19
                                                                                          7/9/19
 C302    SOIL EROSION PLAN                                                                7/3/19
 C401    SITE UTILITY PLAN                                                               8/21/19
                                                                                         7/30/19
 C402    PUBLIC UTILITY PROFILE                                                          7/30/19
 C501    SITE DETAIL SHEET                                                                7/3/19
  L101   SITE LANDSCAPE PLAN                                                             8/21/19
                                                                                          8/9/19
 IR101   SITE IRRIGATION PLAN                                                             8/9/19
         STRUCTURAL
  S001   GENERAL NOTES                                                                    7/3/19
  S002   DESIGN CRITERIA AND SCHEDULES                                                   8/21/19
                                                                                         8/13/19
  S003   SPECIAL INSPECTIONS                                                              7/3/19
  S004   FOUNDATION LOADS AND UNDERPINNING PLAN                                          8/13/19
 S100A   FOUNDATION PLAN – PART A                                                         7/3/19
 S100B   FOUNDATION PLAN – PART B                                                        8/13/19
 S101A   MAIN LEVEL FRAMING PLAN – PART A                                                8/13/19
 S101B   MAIN LEVEL FRAMING PLAN – PART B                                                8/21/19
                                                                                         8/13/19
 S102A   LOW ROOF FRAMING PLAN - PART A                                                   8/9/19
                                                                                         8/21/19
 S102B   LOW ROOF FRAMING PLAN - PART B                                                   8/9/19
                                                                                         8/21/19
  S103   HIGH ROOF FRAMING PLAN                                                           8/9/19
                                                                                         8/21/19
  S201   ELEVATIONS                                                                       8/9/19
                                                                                         8/21/19
  S202   ELEVATIONS                                                                       8/9/19
                                                                                         8/21/19
  S203   ELEVATIONS AND TRUSS PROFILES                                                    8/9/19
                                                                                         8/21/19
  S301   CONCRETE DETAILS                                                                8/13/19
  S302   CONCRETE DETAILS                                                                8/13/19
  S303   CONCRETE DETAILS                                                                8/13/19
  S304   CONCRETE DETAILS                                                                8/13/19
  S305   CONCRETE DETAILS                                                                8/13/19
  S306   CONCRETE DETAILS                                                                8/13/19
  S401   MASONRY DETAILS                                                                  8/9/19
  S402   MASONRY DETAILS                                                                  8/9/19
  S501   STEEL DETAILS                                                                    8/9/19
  S502   STEEL DETAILS                                                                    8/9/19
  S503   STEEL DETAILS                                                                   8/21/19
                                                                                          8/9/19
  S504   STEEL DETAILS                                                                   8/21/19
                                                                                          8/9/19
  S505   STEEL DETAILS                                                                    8/9/19
                                                                                         8/21/19
  S506   STEEL DETAILS                                                                    8/9/19

         Muskegon Convention Center                                                000115-1
         GMP Document                                                      Project No. 2811
         Section 000115-List of Drawing Sheets, Version 2
                                                           EXHIBIT GE
                                                        SECTION 000115
                                                   LIST OF DRAWING SHEETS
          ARCHITECTURAL
AD100     LOWER LEVEL DEMOLITION PLAN                                                      8/9/19
AD101     MAIN LEVEL DEMOLTION PLAN                                                        8/9/19
A100A     LOWER LEVEL FLOOR PLAN - PART A                                                  8/9/19
 A100B    LOWER LEVEL FLOOR PLAN - PART B                                                  8/9/19
A101A     MAIN LEVEL FLOOR PLAN - PART A                                                   8/9/19
 A101B    MAIN LEVEL FLOOR PLAN - PART B                                                   8/9/19
                                                                                          8/21/19
 A103     ROOF PLAN                                                                       8/21/19
                                                                                           8/9/19
A110A     A LOWER LEVEL REFLECTED CEILING PLAN - PART A                                    8/9/19
                                                                                          8/21/19
 A110B    LOWER LEVEL REFLECTED CEILING PLAN - PART B                                      8/9/19
A111A     MAIN LEVEL REFLECTED CEILING PLAN - PART A                                      8/21/19
                                                                                           8/9/19
 A111B    MAIN LEVEL REFLECTED CEILING PLAN - PART B                                       8/9/19
A120A     LOWER LEVEL FINISH PLAN - PART A                                                 8/9/19
 A120B    LOWER LEVEL FINISH PLAN - PART B                                                 8/9/19
A121A     MAIN LEVEL FINISH PLAN - PART A                                                 8/21/19
                                                                                           8/9/19
 A121B    MAIN LEVEL FINISH PLAN - PART B                                                  8/9/19
                                                                                          8/21/19
 A201     EXTERIOR ELEVATIONS                                                              8/9/19
 A202     EXTERIOR ELEVATIONS                                                              8/9/19
 A301     BUILDING SECTIONS                                                                8/9/19
 A302     BUILDING SECTIONS                                                                8/9/19
 A311     WALL SECTIONS                                                                    8/9/19
 A312     WALL SECTIONS                                                                    8/9/19
 A313     WALL SECTIONS                                                                    8/9/19
 A314     WALL SECTIONS                                                                    8/9/19
 A321     EXTERIOR DETAILS                                                                 8/9/19
 A322     EXTERIOR DETAILS                                                                 8/9/19
 A323     EXTERIOR DETAILS                                                                 8/9/19
 A324     EXTERIOR DETAILS                                                                 8/9/19
 A401     ENLARGED FLOOR PLANS AND ELEVATIONS                                              8/9/19
 A402     ENLARGED FINISH FLOOR PLANS                                                      8/9/19
 A501     INTERIOR ELEVATIONS                                                              8/9/19
 A502     INTERIOR ELEVATIONS                                                              8/9/19
 A503     INTERIOR ELEVATIONS                                                              8/9/19
 A504     INTERIOR ELEVATIONS                                                              8/9/19
 A505     INTERIOR ELEVATIONS                                                              8/9/19
 A511     INTERIOR DETAILS                                                                 8/9/19
 A512     INTERIOR DETAILS                                                                 8/9/19
 A601     DOOR AND WINDOW SCHEDULES                                                        8/9/19
 A602     FINISH MATERIAL LIST AND DETAILS                                                 8/9/19
                                                                                          8/21/19
 A801     VERTICAL CIRCULATION                                                             8/9/19
 A802     VERTICAL CIRCULATION                                                             8/9/19
          FIRE PROTECTION
FP100A    LOWER LEVEL FIRE PROTECTION PLAN - PART A                                       8/9/19
FP100B    LOWER LEVEL FIRE PROTECTION PLAN - PART B                                       8/9/19
FP101A    MAIN LEVEL FIRE PROTECTION PLAN - PART A                                        8/9/19
                                                                                          8/21/19
FP101B    MAIN LEVEL FIRE PROTECTION PLAN - PART B                                        8/9/19
          PLUMBING
  P001    GENERAL PLUMBING INFORMATION                                                    8/21/19
                                                                                           8/9/19
PUF100A   UNDERFLOOR PLUMBING PLAN - PART A                                                8/9/19
                                                                                          8/21/19


          Muskegon Convention Center                                                000115-2
          GMP Document                                                      Project No. 2811
          Section 000115-List of Drawing Sheets, Version 2
                                                           EXHIBIT GE
                                                        SECTION 000115
                                                   LIST OF DRAWING SHEETS
PUF100B   UNDERFLOOR PLUMBING PLAN - PART B                                                  8/9/19
                                                                                            8/21/19
 P100A    LOWER LEVEL PLUMBING PLAN - PART A                                                 8/9/19
                                                                                            8/21/19
 P100B    LOWER LEVEL PLUMBING PLAN - PART B                                                 8/9/19
                                                                                            8/21/19
 P101A    MAIN LEVEL PLUMBING PLAN - PART A                                                  8/9/19
                                                                                            8/21/19
 P101B    MAIN LEVEL PLUMBING PLAN - PART B                                                  8/9/19
                                                                                            8/21/19
          MECHANICAL
 M001     GENERAL MECHANICAL INFORMATION                                                     8/9/19
MH100A    LOWER LEVEL HVAC PLAN - PART A                                                     8/9/19
MH100B    LOWER LEVEL HVAC PLAN - PART B                                                     8/9/19
MH101A    MAIN LEVEL HVAC PLAN - PART A                                                     8/21/19
                                                                                             8/9/19
MH101B    MAIN LEVEL HVAC PLAN - PART B                                                     8/21/19
                                                                                             8/9/19
MH103     ROOF MECHANICAL PLAN                                                               8/9/19
MP100A    LOWER LEVEL HYDRONIC PLAN - PART A                                                8/21/19
                                                                                             8/9/19
MP100B    LOWER LEVEL HYDRONIC PLAN - PART B                                                 8/9/19
MP101A    MAIN LEVEL HYDRONIC PLAN - PART A                                                  8/9/19
MP101B    MAIN LEVEL HYDRONIC PLAN - PART B                                                  8/9/19
 M301     ENLARGED MECHANICAL PLANS                                                         8/21/19
                                                                                             8/9/19
 M601     MECHANICAL SCHEDULES                                                               8/9/19
                                                                                            8/26/19
          ELECTRICAL
 ED100    SITE ELECTRICAL DEMOLITION PLAN                                                   8/21/19
                                                                                             7/9/19
 ES100    SITE ELECTRICAL PLAN                                                              8/21/19
                                                                                             7/9/19
  E001    ELECTRICAL NOTES AND ABBREVIATIONS                                                 8/9/19
EP100A    LOWER LEVEL POWER AND SYSTEMS PLAN - PART A                                       8/28/19
                                                                                             8/9/19
EP100B    LOWER LEVEL POWER AND SYSTEMS PLAN - PART B                                        8/9/19
                                                                                            8/28/19
EP101A    MAIN LEVEL POWER AND SYSTEMS PLAN - PART A                                         8/9/19
                                                                                            8/21/19
EP101B    MAIN LEVEL POWER AND SYSTEMS PLAN - PART B                                         8/9/19
                                                                                            8/28/19
 EP102    ROOF POWER AND SYSTEMS PLAN                                                        8/9/19
                                                                                            8/28/19
EL100A    LOWER LEVEL LIGHTING PLAN - PART A                                                 8/9/19
EL100A    LOWER LEVEL LIGHTING PLAN - PART A                                                 8/9/19
EL101A    MAIN LEVEL LIGHTING PLAN - PART A                                                  8/9/19
EL101B    MAIN LEVEL LIGHTING PLAN - PART B                                                  8/9/19
  E501    ELECTRICAL RISER DIAGRAM                                                          8/21/19
                                                                                             8/9/19
  E502    ELECTRICAL DETAILS                                                                8/21/19
                                                                                             8/9/19
  E601    ELECTRICAL SCHEDULES                                                               8/9/19
  E602    LOW VOLTAGE LIGHTING ZONE SCHEDULE                                                 8/9/19
  E603    AV ONE LINE DIAGRAM                                                                8/9/19
                                                                                            8/28/19
  E604    ELECTRICAL SCHEDULES                                                               8/9/19
                                                                                            8/28/19




                                                             END OF SECTION




          Muskegon Convention Center                                                  000115-3
          GMP Document                                                        Project No. 2811
          Section 000115-List of Drawing Sheets, Version 2
                                                       EXHIBIT GE
                                                   TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0102              PROJECT INFORMATION                                                  8/9/19
00 0115              LIST OF DRAWING SHEETS                                               8/9/19
00 3100              AVAILABLE PROJECT INFORMATION                                        8/9/19
00 4325              SUBSTITUTION REQUEST FORM - DURING PROCUREMENT                       8/9/19
00 5433              DIGITAL/ELECTRONIC MEDIA DATA PROTOCOL - USE AGREEMENT               8/9/19
00 5433.01           DIGITAL/ELECTRONIC MEDIA DATA PROTOCOL EXHIBIT                       8/9/19
00 6313              REQUEST FOR INTERPRETATION FORM                                      8/9/19
00 6325              SUBSTITUTION REQUEST FORM - DURING CONSTRUCTION                      8/9/19

DIVISION 01 - GENERAL REQUIREMENTS

01 1000              SUMMARY                                                              8/9/19
01 2500              SUBSTITUTION PROCEDURES                                              8/9/19
01 3000              ADMINISTRATIVE REQUIREMENTS                                          8/9/19
01 4000              QUALITY REQUIREMENTS                                                 8/9/19
01 4533              CODE-REQUIRED SPECIAL INSPECTIONS                                    8/9/19
01 5713              TEMPORARY EROSION AND SEDIMENT CONTROL                               8/9/19
01 6000              PRODUCT REQUIREMENTS                                                 8/9/19
01 7000              EXECUTION AND CLOSEOUT REQUIREMENTS                                  8/9/19
01 7800              CLOSEOUT SUBMITTALS                                                  8/9/19



DIVISION 02 - EXISTING CONDITIONS

02 4100              DEMOLITION                                                           8/9/19

DIVISION 03 - CONCRETE

03 1000              CONCRETE FORMING AND ACCESSORIES                                     8/9/19
03 2000              CONCRETE REINFORCING                                                 8/9/19
03 3000              CAST-IN-PLACE CONCRETE                                               8/9/19

DIVISION 04 - MASONRY

04 0511              MORTAR AND MASONRY GROUT                                         8/9/19
04 2000              UNIT MASONRY                                                     8/9/19
04 2616              ADHERED MASONRY VENEER                                           8/26/19
                                                                                      8/9/19

DIVISION 05 - METALS

05 1200              STRUCTURAL STEEL FRAMING                                             8/9/19
05 2100              STEEL JOIST FRAMING                                                  8/9/19
05 3100              STEEL DECKING                                                        8/9/19
05 4000              COLD-FORMED METAL FRAMING                                            8/9/19
05 5000              METAL FABRICATIONS                                                   8/9/19
05 5100              METAL STAIRS                                                         8/9/19
05 5213              PIPE AND TUBE RAILINGS                                               8/9/19
Muskegon Convention Center                                                     000115-3
GMP Document                                                           Project No. 2811
Section 000115-List of Drawing Sheets, Version 2
                                           EXHIBIT GE

05 5305         METAL GRATINGS AND FLOOR PLATES                     8/9/19
05 7000         DECORATIVE METAL                                    8/9/19
05 7313         GLAZED DECORATIVE METAL RAILINGS                    8/9/19

DIVISION 06 - WOODS, PLASTICS, AND COMPOSITES

06 1000         ROUGH CARPENTRY                                     8/9/19
06 4100         ARCHITECTURAL WOOD CASEWORK                         8/9/19
06 8316         FIBERGLASS REINFORCED PANELING                      8/9/19

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 0150.19      PREPARATION FOR RE-ROOFING                          8/9/19
07 1300         SHEET WATERPROOFING                                 8/9/19
07 2100         THERMAL INSULATION                                  8/9/19
07 2119         FOAMED-IN-PLACE INSULATION                         8/21/19
                                                                    8/9/19
07 2500         WEATHER BARRIERS                                    8/9/19
07 4213         METAL WALL PANELS                                   8/9/19
07 4213.19      INSULATED METAL WALL PANELS                         8/9/19
07 4213.23      METAL COMPOSITE MATERIAL WALL PANELS                8/9/19
07 4214         METAL WINDOW PANELS                                 8/9/19
07 5200         MODIFIED BITUMINOUS MEMBRANE ROOFING                8/9/19
07 5300         ELASTOMERIC MEMBRANE ROOFING                        8/9/19
07 6200         SHEET METAL FLASHING AND TRIM                       8/9/19
07 7100         ROOF SPECIALTIES                                    8/9/19
07 7200         ROOF ACCESSORIES                                    8/9/19
07 7711         COMPOSITE FRAMING SUPPORT (CFS) SYSTEM              8/9/19
07 8100         APPLIED FIREPROOFING                                8/9/19
07 8123         INTUMESCENT FIREPROOFING                            8/9/19
07 8400         FIRESTOPPING                                        8/9/19
07 9100         PREFORMED JOINT SEALS                               8/9/19
07 9200         JOINT SEALANTS                                      8/9/19
07 9513         EXPANSION JOINT COVER ASSEMBLIES                    8/9/19


DIVISION 08 - OPENINGS

08 1113         HOLLOW METAL DOORS AND FRAMES                       8/9/19
08 1116         ALUMINUM DOORS AND FRAMES (INSULATED CORE)          8/9/19
08 1416         FLUSH WOOD DOORS                                    8/9/19
08 3100         ACCESS DOORS AND PANELS                             8/9/19
08 3323         OVERHEAD COILING DOORS                              8/9/19
08 3613         SECTIONAL DOORS                                     8/9/19
08 4313         ALUMINUM-FRAMED STOREFRONTS                         8/9/19
08 4413         GLAZED ALUMINUM CURTAIN WALLS                       8/9/19
08 5619         ALUMINUM SLIDING PASS WINDOW                        8/9/19
08 7100         DOOR HARDWARE                                       8/9/19
08 800 0        GLAZING                                             8/9/19

DIVISION 09 - FINISHES

09 2116         GYPSUM BOARD ASSEMBLIES                             8/9/19
09 3000         TILING                                              8/9/19
09 5100         ACOUSTICAL CEILINGS                                 8/9/19
09 5424         WOOD CEILINGS AND WALLS                            8/21/19
                                                                    8/9/19
 Muskegon Convention Center                                  73530005
 Issued for Bid Pack No. 3
                                                    EXHIBIT GE

09 6500              RESILIENT FLOORING                                                      8/9/19
09 6813              TILE CARPETING                                                          8/9/19
09 7200              WALL COVERINGS                                                          8/9/19
09 8400              ACOUSTICAL BLADES                                                       8/9/19
09 8430              SOUND-ABSORBING WALL AND CEILING UNITS                                  8/9/19
09 9123              INTERIOR PAINTING                                                       8/9/19

DIVISION 10 - SPECIALTIES

10 1400              SIGNAGE                                                              8/9/19
10 2113.17           PHENOLIC TOILET COMPARTMENTS                                        8/21/19
                                                                                          8/9/19
10 2210              SIDE-FOLDING CLOSURES                                                8/9/19
10 2239              FOLDING PANEL PARTITIONS                                             8/9/19
10 2600              WALL PROTECTION                                                      8/9/19
10 2800              TOILET ACCESSORIES                                                   8/9/19
10 4400              FIRE PROTECTION SPECIALTIES                                          8/9/19
10 5113              METAL LOCKERS                                                       8/21/19
                                                                                          8/9/19

DIVISION 11 - EQUIPMENT

11 1313              LOADING DOCK BUMPERS                                                    8/9/19
11 1316              LOADING DOCK SEALS AND SHELTERS                                         8/9/19
11 1319.13           LOADING DOCK LEVELERS                                                   8/9/19
11 1321              LOADING DOCK SAFETY EQUIPMENT                                           8/9/19
11 5213              PROJECTION SCREENS                                                      8/9/19

DIVISION 12 - FURNISHINGS

12 2400              WINDOW SHADES                                                           8/9/19
12 3600              COUNTERTOPS                                                             8/9/19
12 4813              ENTRANCE FLOOR MATS AND FRAMES                                          8/9/19

DIVISION 14 - CONVEYING EQUIPMENT

14 2100              ELECTRIC TRACTION ELEVATORS DIVISION 21 - FIRE SUPPRESSION     8/9/19
21 0500              COMMON WORK RESULTS FOR FIRE SUPPRESSION                       8/9/19
21 0523                                                                             8/9/19
                     GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING 8/9/19
21 0553              IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT       8/9/19
21 1200              FIRE-SUPPRESSION STANDPIPES                                    8/9/19
          8/9/19
21 1300              FIRE-SUPPRESSION SPRINKLER SYSTEMS                                      8/9/19

DIVISION 22 - PLUMBING

22 0516              EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING                    8/9/19
22 0519              METERS AND GAUGES FOR PLUMBING PIPING                               8/9/19
22 0523              GENERAL-DUTY VALVES FOR PLUMBING PIPING                             8/9/19
22 0553              IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT                    8/9/19
22 0719              PLUMBING PIPING INSULATION                                          8/9/19
22 1005              PLUMBING PIPING                                                     8/9/19
22 1006              PLUMBING PIPING SPECIALTIES                                         8/9/19
22 3000              PLUMBING EQUIPMENT                                                  8/9/19
22 4000              PLUMBING FIXTURES                                                   8/26/19
                                                                                         8/9/19
Muskegon Convention Center                                                        000115-3
GMP Document                                                              Project No. 2811
Section 000115-List of Drawing Sheets, Version 2
                                            EXHIBIT GE



DIVISION 23 HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 0516         EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING                   8/9/19
23 0517         SLEEVES AND SLEEVE SEALS FOR HVAC PIPING                       8/9/19
23 0519         METERS AND GAUGES FOR HVAC PIPING                              8/9/19
23 0523         GENERAL-DUTY VALVES FOR HVAC PIPING                            8/9/19
23 0553         IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT                   8/9/19
23 0593         TESTING, ADJUSTING, AND BALANCING FOR HVAC                     8/9/19
23 0713         DUCT INSULATION                                                8/9/19
23 0719         HVAC PIPING INSULATION                                         8/9/19
23 0800         COMMISSIONING OF HVAC                                          8/9/19
23 0913         INSTRUMENTATION AND CONTROL DEVICES FOR HVAC                   8/9/19
23 0923         DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC                         8/9/19
23 0993         SEQUENCE OF OPERATIONS FOR HVAC CONTROLS                       8/9/19
23 2113         HYDRONIC PIPING                                                8/9/19
23 2113.13      HYDRONIC SNOWMELT PIPING                                       8/9/19
23 2114         HYDRONIC SPECIALTIES                                           8/9/19
23 2123         HYDRONIC PUMPS                                                 8/9/19
23 2500         HVAC WATER TREATMENT                                           8/9/19
23 3100         HVAC DUCTS AND CASINGS                                         8/9/19
23 3300         AIR DUCT ACCESSORIES                                           8/9/19
23 3423         HVAC POWER VENTILATORS                                         8/9/19
23 3600         AIR TERMINAL UNITS                                             8/9/19
23 3700         AIR OUTLETS AND INLETS                                         8/9/19
23 5100         BREECHINGS, CHIMNEYS, AND STACKS                               8/9/19
23 5216         CONDENSING BOILERS                                             8/9/19
23 5700         HEAT EXCHANGERS FOR HVAC                                       8/9/19
23 7413         PACKAGED OUTDOOR CENTRAL-STATION AIR-HANDLING UNITS            8/9/19
23 8126.13      SMALL-CAPACITY SPLIT-SYSTEM AIR CONDITIONERS                   8/9/19
23 8200         CONVECTION HEATING AND COOLING UNITS                           8/9/19

DIVISION 26 - ELECTRICAL

26 0519         LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES             8/9/19
26 0526         GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS                   8/9/19
26 0529         HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS                    8/9/19
                                                                              8/28/19
26 0533.13      CONDUIT FOR ELECTRICAL SYSTEMS                                 8/9/19
26 0533.16      BOXES FOR ELECTRICAL SYSTEMS                                   8/9/19
26 0533.23      SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS                        8/9/19
26 0536         CABLE TRAYS FOR ELECTRICAL SYSTEMS                             8/9/19
26 0548         VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS          8/9/19
26 0553         IDENTIFICATION FOR ELECTRICAL SYSTEMS                          8/9/19
26 0573.15      ARC FLASH HAZARD                                               8/9/19
26 0583         WIRING CONNECTIONS                                             8/9/19
26 0801         ELECTRICAL INSPECTION, TESTING AND START-UP                    8/9/19
26 0923         LIGHTING CONTROL DEVICES                                      8/21/19
                                                                               8/9/19
26 1316         MEDIUM-VOLTAGE FUSIBLE INTERRUPTER SWITCHES                   8/21/19
                                                                               8/9/19
26 2200         LOW-VOLTAGE TRANSFORMERS                                       8/9/19
26 2413         SWITCHBOARDS                                                   8/9/19
26 2416         PANELBOARDS                                                    8/9/19
26 2716         CABINETS AND ENCLOSURES                                        8/9/19
26 2726         WIRING DEVICES                                                 8/9/19
26 2816.16      ENCLOSED SWITCHES                                              8/9/19
 Muskegon Convention Center                                             73530005
 Issued for Bid Pack No. 3
                                                   EXHIBIT GE

26 2923              VARIABLE-FREQUENCY MOTOR CONTROLLERS                              8/9/19
26 3213              ENGINE GENERATORS                                                8/28/19
                                                                                       8/9/19
26 3600              TRANSFER SWITCHES                                                 8/9/19
26 5100              INTERIOR LIGHTING                                                 8/9/19
26 5600              EXTERIOR LIGHTING                                                 8/9/19

DIVISION 27 - COMMUNICATIONS

27 0500              COMMON WORK RESULTS FOR COMMUNICATIONS                               8/9/19
27 0526              GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS                      8/9/19
27 1000              STRUCTURED CABLING SYSTEMS                                           8/9/19
27 1005              STRUCTURED CABLING FOR VOICE AND DATA                                8/9/19
27 1100              COMMUNICATIONS EQUIPMENT ROOM FITTINGS                               8/9/19
27 4100              AUDIO VIDEO SYSTEMS                                                  8/9/19

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 1000              ACCESS CONTROL                                                       8/9/19
28 2000              VIDEO SURVEILLANCE                                                   8/9/19
28 4600              FIRE DETECTION AND ALARM                                             8/9/19

DIVISION 31 - EARTHWORK

31 1000              SITE CLEARING                                                        8/9/19
31 2200              GRADING                                                              8/9/19
31 2316              EXCAVATION                                                           8/9/19
31 2319              DEWATERING                                                           8/9/19
31 2323              FILL                                                                 8/9/19
31 4000              SHORING AND UNDERPINNING                                             8/9/19
31 5000              EXCAVATION SUPPORT AND PROTECTION                                    8/9/19
31 6615              HELICAL FOUNDATIONS PILES                                            8/9/19

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 1123              AGGREGATE BASE COURSES                                               8/9/19
32 1216              ASPHALT PAVING                                                       8/9/19
32 1313              CONCRETE PAVING                                                      8/9/19
32 1723.13           PAINTED PAVEMENT MARKINGS                                            8/9/19
32 1726              TACTILE WARNING SURFACING                                            8/9/19
32 3300              SITE FURNISHINGS                                                     8/9/19
32 8400              UNDERGROUND IRRIGATION SYSTEM                                        8/9/19
32 9219              SEEDING                                                              8/9/19
32 9300              PLANTS                                                               8/9/19

DIVISION 33 - UTILITIES

33 0110.58           DISINFECTION OF WATER UTILITY PIPING SYSTEMS                         8/9/19
33 0513              MANHOLES AND STRUCTURES                                              8/9/19
33 1416              SITE WATER UTILITY DISTRIBUTION PIPING                               8/9/19
33 3113              SITE SANITARY SEWERAGE GRAVITY PIPING                                8/9/19
33 4100              SUBDRAINAGE                                                          8/9/19
33 4211              STORMWATER GRAVITY PIPING                                            8/9/19
33 7119              ELECTRICAL UNDERGROUND DUCTS, DUCTBANKS, AND MANHOLES                8/9/19
Muskegon Convention Center                                                     000115-3
GMP Document                                                           Project No. 2811
Section 000115-List of Drawing Sheets, Version 2
                     Agenda Item Review Form
                      Muskegon City Commission

Commission Meeting Date: 9/24/19                      Title: DDA On-Premise Liquor License for
                                                      the LC Walker Arena

Submitted By: Mike Franzak                            Department: Planning

Brief Summary: To approve the Resolution for a Downtown Development Authority On-Premise
Liquor License for the LC Walker Arena. The Liquor Control Commission allows for additional
liquor licenses within Downtown Development Authority Districts under certain conditions.



Detailed Summary: This license would cover all alcohol sales within the arena; including Rad
Dad’s, Carlisle’s and concessions.




Amount Requested:                                    Amount Budgeted:

Fund(s) or Account(s):                               Fund(s) or Account(s):

Recommended Motion: To approve the DDA On-Premise Liquor License for the L.C. Walker Arena
and authorize the Mayor and Clerk to sign the resolution.




Check if the following Departments need to approve the item first:
Police Dept.
Fire Dept.
IT Dept.


For City Clerk Use Only:
Commission Action:
                                       CITY OF MUSKEGON
                                   MUSKEGON COUNTY, MICHIGAN

                                      RESOLUTION NO. _________

A resolution concerning the issuance of a Downtown Development Authority District On-Premises
Liquor License pursuant to 436.1521a(1)(b) of the Michigan Compiled Laws.

The City Commission of the City of Muskegon hereby RESOLVES:

Recitals

   1. The City of Muskegon has applied for a Downtown Development Authority District On-Premises
      Liquor License for the premises at 470 W Western Ave, which is located within an area established
      by the City Commission as a redevelopment project area pursuant to 436.1521a(1)(b) of the
      Michigan Compiled Laws.

   2. It is required that the City Commission approve a specific applicant, at a specific location “ABOVE
      ALL OTHERS”.

   3. This resolution was approved at the regular meeting of the City Commission on September 24,
      2019.

City Commission Findings

   The City Commission is satisfied that:

   1. That the applicant has sufficiently demonstrated a commitment for a capital investment of not less
      than $75,000 for the build-out and improvements of the building that will house the licensed
      premises, which amounts shall be expended before the issuance of the license.

   2. That the licensed business shall be engaged in dining, entertainment or recreation, that is open to
      the general public, with a seating capacity of not less than 50 persons.

   NOW, THEREFORE, THE CITY COMMISSION RESOLVES:

       The City Commission deems it to be in the best interest of the City of Muskegon to approve the
       application of the City of Muskegon for a Downtown Development Authority District On-
       Premises Liquor License for the premises at 470 W Western Ave, pursuant to 436.1521a(1)(b) of
       the Michigan Compiled Laws, and recommends to the Michigan Liquor Control Commission the
       issuance of said requested license “ABOVE ALL OTHERS”.



   Adopted this 24th day of September, 2019.

       AYES:         ______________________________________________________

       NAYES:        ______________________________________________________
ABSENT:   ______________________________________________________


                                  By:   ________________________
                                           Stephen J. Gawron
                                           Its Mayor


                                  By:   ________________________
                                           Ann Meisch, MMC
                                           Its Clerk
                     Agenda Item Review Form
                      Muskegon City Commission

Commission Meeting Date: 9/24/19                      Title: Recreational Marihuana Regulatory
                                                      Ordinance

Submitted By: Mike Franzak                            Department: Planning

Brief Summary: Staff initiated request to amend the City Code of Ordinances and adopt a
Recreational Marihuana Regulatory Ordinance under the Michigan Regulation and Taxation of
Marihuana Act.




Detailed Summary:



Amount Requested:                                    Amount Budgeted:

Fund(s) or Account(s):                               Fund(s) or Account(s):

Recommended Motion: To approve the Recreational Marihuana Regulatory Ordinance as part of
the City Code of Ordinances.




Check if the following Departments need to approve the item first:
Police Dept.
Fire Dept.
IT Dept.


For City Clerk Use Only:
Commission Action:
                    Michigan Regulation and Taxation of Marihuana Act (MRTMA)

General Notes

The State will begin processing applications November 1. Municipalities must pass an opt out resolution
if they do not want to permit MRTMA businesses. Those that do want to permit them should pass a
regulatory and zoning ordinance.
MMFLA (Medical) and MRTMA (Recreational) license holders under common ownership may locate at the
same location.
Growing outside is permissible under certain circumstances. Staff does not encourage these at this time
due to the location of the proposed district and possible environmental concerns.
Please see the attached Emergency Rules white paper established July 3, 2019 by the Michigan
Department of Licensing and Regulatory Affairs. The paper established the following license types.
Staff has prepared a proposed zoning ordinance. It is an amendment to the existing Medical Marihuana
Facilities Overlay District and would include regulations for both Medical and Recreational Marihuana
Facilities.
Please see the Social Equity Program attachment.


MRTMA License Types
   1. Grower
          • Class A – 100 plant limit
          • Class B – 500 plant limit
          • Class C – 2,000 plant limit
   2. Processor
          • May purchase marihuana only from a marihuana grower or a marihuana processor and
               sale of marihuana-infused products or marihuana only to a marihuana retailer or another
               marihuana processor.
   3. Secure transporter
          • May store and transport marihuana and money associated with the purchase or sale of
               marihuana between marihuana establishments for a fee upon request of a person with
               legal custody of that marihuana or money.
   4. Retailer
          • May purchase or transfer of marihuana only from a marihuana grower or marihuana
               processor and sale or transfer to only an individual 21 years of age or older. Referred to
               as provisioning center under MMFLA.

   5. Safety compliance facility
          • May take marihuana from, test marihuana for, and return marihuana to only a licensed
              marihuana grower, marihuana processor, marihuana retailer, or marihuana
              microbusiness.
   6. Microbusiness
          • May cultivate up to 150 plants
          • May process and package marihuana
            •   May conduct retail sales to customers but not other marihuana establishments


    Special License Types – The Emergency Rules established these additional license types.

    7. Marihuana Event Organizer – Licensee may apply for Temporary Marihuana Event licenses from
       the Michigan Regulatory Agency (MRA).

    8. Temporary Marihuana Event – This license allows a Marijuana Event Organizer to run an event,
       which has been approved by the local municipality, where the onsite sale or consumption of
       marijuana products, or both, are authorized at a specific location for a limited time. Licensed
       Retailers and Microbusinesses may participate. The Marijuana Event Organizer is required to hire
       security and ensure that all rules and requirements for onsite consumption of marijuana products
       are followed. Events may last 1-7 days. May only be held at a venue expressly approved by a
       municipality for the purpose of holding a temporary marihuana event

    9. Designated Consumption Establishment – Allows the license holder, with local approval, to
       operate a commercial space that is licensed by the MRA and authorized to permit adults 21 years
       of age and older to consume marijuana and marijuana products on premises. A Designated
       Consumption Establishment license does not allow for sales or distribution of marijuana or
       marijuana product, unless the license holder also possesses a Retailer or Microbusiness license.
       A person that allows consumption of marihuana products on the premises of a nonresidential
       location and charges a fee for entry, sells goods or services while individuals are consuming on
       the premises, or requires membership for entry shall acquire a designated consumption
       establishment or temporary marihuana event license.

    10. Excess Marihuana Grower – Allows a licensee
        who already holds five adult-use Class C
        Grower licenses to expand their allowable
        marijuana plant count.


Marihuana Excise Tax Fund

The tax fund for the MMFLA (Medical) has sunset since
recreational marihuana has passed. Municipalities
were set to receive a distribution of the fund created
by the 3% sales tax. Now, only municipalities that have
operating “retailers” and “microbusinesses” will get a
share of the excise tax fund, which is created from a
10% tax.
State License Fee’s – In addition to a one-time $6,000 enrollment fee, the following permit fees exist.
                                                                    DRAFT
                                                                    09/17/19


                               CITY OF MUSKEGON
                           MUSKEGON COUNTY, MICHIGAN
                               ORDINANCE NO. ____



THE CITY COMMISSION OF THE CITY OF MUSKEGON HEREBY ORDAINS:

      PERMITTING RECREATIONAL MARIHUANA ESTABLISHMENTS


    1. Chapter 34, Article IV of the Code of Ordinances of the City of Muskegon,
       Michigan, Sections 34-______ through 34-______ are adopted as follows:

    Sec. 34-____         Purpose and Intent.

       It is the intent of this ordinance to opt-in to the Michigan Regulation and Taxation
    of Marihuana Act, being Initiated Law 1 or 2018, (MCS Sections 333.27951 through
    333.27967).

    Section 34- ____ Definitions.

    Words used in this Ordinance shall have the meaning as defined in the Michigan
    Regulation and Taxation of Marihuana Act, being Initiated Law 1 or 2018, (MCS
    Sections 333.27951 through 333.27967), as may be amended.


    Sec. 34-___          MMFLA Opt-In Provision

    Pursuant to Section 6 of the Michigan Regulation and Taxation of Marihuana Act,
    being Initiated Law 1 or 2018, (MCS Sections 333.27951 through 333.27967), the
    City will authorize Permits for marihuana establishments.

    Sec. 34-____         Permit Required for MMFLA Activity.

        (1)    Any person or entity that wishes to operate as a marihuana establishment
    pursuant to the Michigan Regulation and Taxation of Marihuana Act, being Initiated
    Law 1 or 2018, (MCS Sections 333.27951 through 333.27967) in the City shall obtain
    a Permit from the City and must obtain a State Operating License prior to opening or
    operating.




O:\CLERK\Common\Word\Agenda Items for Next Meeting\2019\092419\21c_12J0795-Rec. Marihuana; Opt- In.DOC   1
        (2)     The application and inspection fee for the Permit required by this section
    shall be set from time to time by the City by resolution.

        (3)    In addition to an annual reapplication and inspection fee, the City may
    assess an annual fee of no more than $5,000.00 to help defray the administrative and
    enforcement costs associated with the operation of the marihuana establishments
    operating in the City.

        (4)      No Permit issued under this section shall be transferable.

        (5)     All Permits issued under this section shall be renewed annually and
    subject to annual inspection and renewal fees as set from time to time by the City by
    resolution.

       (6)     The City may limit the number of Permits issued under this section, and
    may revise this limit from time to time.

        (7)     A person or entity that receives a Permit under this section shall display its
    Permit and, when issued, its State License in plain view clearly visible to City
    officials and State authorized agents.

        (8)    No person or entity that opened or operated a facility doing business or
    purporting to do business as a marihuana establishment prior to the adoption of this
    ordinance shall be considered a lawful use.

    Sec. 34-___          MMFLA Location Requirements.

       (1)    Marihuana establishments are permitted in those zones and subject to
    requirements provided for in the City’s Zoning Ordinance.

        (2)     The marihuana establishments shall meet all applicable written and duly
    promulgated standards of the City and, prior to opening, Applicants shall demonstrate
    to the City that the location meets the rules and regulations promulgated by the State,
    if any.

    Sec. 34-___          Application Procedure.

        (1)     All Applicants for Permits required by this section shall file an application
    with the Clerk. This application shall be signed by the Applicant if an individual, or
    by all partners if a partnership, by a managing member if a limited liability company,
    or by the president of a corporation.

       (2) The Applicant may be requested to provide any information required by the
    Michigan Regulation and Taxation of Marihuana Act, being Initiated Law 1 or 2018,
    (MCS Sections 333.27951 through 333.27967).




O:\CLERK\Common\Word\Agenda Items for Next Meeting\2019\092419\21c_12J0795-Rec. Marihuana; Opt- In.DOC   2
        (3)    The Permit shall be approved if the Applicant meets all City requirements
    unless a due diligence investigation discloses tangible evidence that the conduct of
    the Applicant’s business would pose a substantial threat to the public health, safety,
    or general welfare.

    Sec. 34-___          Permit Revocation and Review.

       (1)      A Permit granted under this section may be revoked or not renewed for
    any of the following reasons:

                 (a)    Any fraud or misrepresentations contained in the Permit
                 application;

                 (b)     Any knowing violation of this ordinance;

                 (c)     Loss of the Applicant’s State Medical Marihuana Facility License;

                 (d)     Failure of the Applicant to obtain a State Medical Marihuana
                 Facility License within a reasonable time after obtaining a Permit under
                 this section;

                 (e)     Conducting business in an unlawful manner or in such a way as to
                 constitute a menace to the health, safety, or general welfare of the public;

                 (f)     The violation of any of the conditions of issuance or continuation
                 of a certificate of registration;

                 (g)    Fraud, misrepresentation or any false statement made in the
                 operation of the business;

                 (h)   Failure to pay personal property taxes, or timely file
                 documentation or returns required for such taxes;

                 (i)     Failure to pay city income taxes, failure to withhold city income
                 tax from employees, failure to remit to the City withheld city income
                 taxes, or timely file documentation or returns required for such taxes;

                 (j)     Failure to pay any outstanding amounts owed the city (such as fees
                 for inspections or property services, water or sewer bills, municipal civil
                 infraction fines applicable to the business or its premises, current special
                 assessment, installments, etc.);

                 (k)    Failure to pay registration fees imposed pursuant to this chapter
                 and resolution of the city commission;




O:\CLERK\Common\Word\Agenda Items for Next Meeting\2019\092419\21c_12J0795-Rec. Marihuana; Opt- In.DOC   3
                 (l)    Failure or inability of an applicant to meet and satisfy any of the
                 requirements and provisions of this chapter;

                 (m)     Failure to allow inspection of the business premises at a reasonable
                 time; or

                 (n)    Failure to allow inspection of hazardous material storage records at
                 a reasonable time.


2.      This Ordinance is to become effective ten (10) days after adoption.


Ayes:

Nays:

First Reading:

Second Reading:


                                          CERTIFICATE

        The undersigned, being the duly qualified Clerk of the City of Muskegon,
Muskegon County, Michigan, does hereby certify that the foregoing is a true and
complete copy of an ordinance adopted by the City Commission of the City of
Muskegon, at a regular meeting of the City Commission on the ____ day of
_______________, 2019, at which meeting a quorum was present and remained
throughout, and that the meeting was conducted and public notice was given pursuant to
and in full compliance with Act No. 267, Public Acts of Michigan of 1976, as amended,
and that minutes were kept and will be or have been made available as required thereby.

Date:_______________________, 2019


                                          ________________________________
                                          Ann Marie Meisch, MMC
                                          City Clerk


Publish:         Notice of Adoption to be published once within ten (10) days of final
adoption.




O:\CLERK\Common\Word\Agenda Items for Next Meeting\2019\092419\21c_12J0795-Rec. Marihuana; Opt- In.DOC   4
                                      CITY OF MUSKEGON
                                     NOTICE OF ADOPTION

TO: ALL PERSONS INTERESTED


        Please take notice that on ___________________, 2019, the City Commission of
the City of Muskegon amended Chapter____________, Article ___________ of the
Muskegon City Code, summarized as follows:

    1. Section __________ is amended to provide_____________.

    2. Section ____________ is amended to add ______________.


       Copies of the ordinance may be viewed and purchased at reasonable cost at the
Office of the City Clerk in the City Hall, 933 Terrace Street, Muskegon, Michigan,
during regular business hours.

       This ordinance amendment is effective ten (10) days from the date of this
publication.

Published: _________________, 2019                             CITY OF MUSKEGON

                                                               By________________________
                                                                 Ann Marie Meisch, MMC
                                                                 City Clerk

------------------------------------------------------------------------------------------------------------
PUBLISH ONCE WITHIN TEN (10) DAYS OF FINAL PASSAGE




O:\CLERK\Common\Word\Agenda Items for Next Meeting\2019\092419\21c_12J0795-Rec. Marihuana; Opt- In.DOC         5
                                                                    DRAFT
                                                                    09/17/19



                               CITY OF MUSKEGON
                           MUSKEGON COUNTY, MICHIGAN
                               ORDINANCE NO. ____



THE CITY COMMISSION OF THE CITY OF MUSKEGON HEREBY ORDAINS:

     PROHIBITION OF RECREATIONAL MARIHUANA ESTABLISHMENTS


1.      Chapter 34, Article IV of the Code of Ordinances of the City of Muskegon,
        Michigan, Sections 34-______ through 34-______ are adopted as follows:

     Sec. 34-_____       Purpose and Intent.

         It is the intent of this ordinance to opt-out of the Michigan Regulation and
     Taxation of Marihuana Act, being Initiated Law 1 of 2018 (MCL Sections 333.27951
     through 333.27967).

     Section 34-____ Definitions.

     Words used herein shall have the definitions as provided for in Initiated Law 1 of
     2018, MCL 333.27951 et seq., as may be amended.

     Section 34- ______ No Marihuana Establishments.

     The City of Muskegon hereby prohibits all marihuana establishments within the
     boundaries of the City pursuant to Initiated Law 1 of 2018, MCL 333.27951 et seq.,
     as may be amended.

     Section 34- ______ Violations and Penalties

     1. Any person who disobeys, neglects or refuses to comply with any provision of
        this ordinance or who allows or consents to any of the same shall be deemed to be
        responsible for the violation of this ordinance. A violation of this ordinance is
        deemed to be a nuisance per se.
     2. A violation of this ordinance is a municipal civil infraction, for which the fines
        shall not be less than $100 nor more than $500, in the discretion of the Court. The
        foregoing sanctions shall be in addition to the rights of the City to proceed at law
        or equity with other appropriate and proper remedies. Additionally, the violator


O:\CLERK\Common\Word\Agenda Items for Next Meeting\2019\092419\21d_12J0785-Rec. Marihuana; Opt
Out.DOC                                                                                          1
        shall pay costs which may include all expenses, direct or indirect, which the City
        incurs in connection with the municipal civil infraction.
     3. Each day during which any violation continues shall be deemed a separate
        offense.
     4. In addition, the City may seek injunctive relief against persons alleged to be in
        violation of this ordinance, and such other relief as may be provided by law.
     5. This ordinance shall be administered and enforced by the Muskegon Police
        Department, Zoning Administrator or by such other person(s) as designated by the
        City Commission from time to time.

     Section 34- ________ Severability

         The provisions of this ordinance are hereby declared to be severable. If any
     clause, sentence, word, section or provision is hereafter declared void or
     unenforceable for any reason by a court of competent jurisdiction, it shall not affect
     the remainder of such ordinance which shall continue in full force and effect.


2.      This Ordinance is to become effective ten (10) days after adoption.


Ayes:

Nays:

First Reading:

Second Reading:


                                          CERTIFICATE

        The undersigned, being the duly qualified Clerk of the City of Muskegon,
Muskegon County, Michigan, does hereby certify that the foregoing is a true and
complete copy of an ordinance adopted by the City Commission of the City of
Muskegon, at a regular meeting of the City Commission on the ____ day of
_______________, 2019, at which meeting a quorum was present and remained
throughout, and that the meeting was conducted and public notice was given pursuant to
and in full compliance with Act No. 267, Public Acts of Michigan of 1976, as amended,
and that minutes were kept and will be or have been made available as required thereby.

Date:_______________________, 2019


                                          ________________________________
                                          Ann Marie Meisch, MMC

O:\CLERK\Common\Word\Agenda Items for Next Meeting\2019\092419\21d_12J0785-Rec. Marihuana; Opt
Out.DOC                                                                                          2
                                          City Clerk


Publish:         Notice of Adoption to be published once within ten (10) days of final
adoption.




O:\CLERK\Common\Word\Agenda Items for Next Meeting\2019\092419\21d_12J0785-Rec. Marihuana; Opt
Out.DOC                                                                                          3
                                      CITY OF MUSKEGON
                                     NOTICE OF ADOPTION

TO: ALL PERSONS INTERESTED


        Please take notice that on ___________________, 2019, the City Commission of
the City of Muskegon amended Chapter____________, Article ___________ of the
Muskegon City Code, summarized as follows:

    1. Section __________ is amended to provide_____________.

    2. Section ____________ is amended to add ______________.


       Copies of the ordinance may be viewed and purchased at reasonable cost at the
Office of the City Clerk in the City Hall, 933 Terrace Street, Muskegon, Michigan,
during regular business hours.

       This ordinance amendment is effective ten (10) days from the date of this
publication.

Published: _________________, 2019                             CITY OF MUSKEGON

                                                               By________________________
                                                                 Ann Marie Meisch, MMC
                                                                 City Clerk

------------------------------------------------------------------------------------------------------------
PUBLISH ONCE WITHIN TEN (10) DAYS OF FINAL PASSAGE




O:\CLERK\Common\Word\Agenda Items for Next Meeting\2019\092419\21d_12J0785-Rec. Marihuana; Opt
Out.DOC                                                                                                   4
                         Agenda Item Review Form
                          Muskegon City Commission

Commission Meeting Date: 9/24/19                       Title: Amendment to the Medical Marihuana
                                                       Facilities Overlay District to also allow
                                                       Recreational Marihuana facilities

Submitted By: Mike Franzak                             Department: Planning

Brief Summary: Staff initiated request to amend Section 2330 of the zoning ordinance, the Medical
Marihuana Facilities Overlay District, to also allow for Recreational Marihuana facilities under the
Michigan Regulation and Taxation of Marihuana Act.



Detailed Summary: Staff is proposing to amend the current Medical Marihuana Facilities Overlay
District to also allow for Recreational Marihuana Facilities. The building and site requirements are
essentially the same for recreational and medicinal facilities and they would be allowed within the
same overlay district, as depicted on the map. The Planning Commission voted 7-1 in favor of
recommending approval of the ordinance.

Amount Requested:                                    Amount Budgeted:

Fund(s) or Account(s):                               Fund(s) or Account(s):

Recommended Motion: To approve the amendments to Section 2330 of the Zoning Ordinance to
also allow for Recreational Marihuana Facilities.



Check if the following Departments need to approve the item first:
Police Dept.
Fire Dept.
IT Dept.


For City Clerk Use Only:
Commission Action:
                                     Deletions are in red, additions are highlighted.

SECTION 2331: MEDICAL MARIHUANA FACILITIES OVERLAY DISTRICT

A Medical Marihuana Facilities Overlay District is hereby created as outlined in Figures 23-2. Within said overlay district
only, Medical Marihuana Facilities and Recreational Marihuana Facilities to the extent licensed pursuant to City Code
Sections 34-201 through 34-208 and (to be determined) are permitted.

   A. Overlay District:


        1. Location: Please see Figure 23-2 for the location of the overlay district. Within the entire overlay district,
           licenses for Provisioning Centers, Growers, Processors, Secure Transporters and Safety Compliance
           Facilities are permitted for Medical Marihuana Facilities. A smaller area within the overlay district allows
           for Recreational Marihuana licenses for Retailers, Microbusiness, Designated Consumption Establishments,
           Temporary Marihuana Events, Growers, Processors, Secure Transporters and Safety Compliance Facilities.

   B.   Grower, Excess Grower, and Processor Requirements:


        1. Signage. Signage shall be limited to one sign, no larger than 25 square feet and shall not use the word
           marihuana/marijuana, cannabis or any other word or phrase which would depict marihuana/marijuana;
           nor may pictures of a leaf or leaves, green cross or any other rendering which would depict
           marihuana/marijuana be displayed on a sign or any part of the building.
        2. Building and Site Amenities. All Grower and Processor facilities must meet the following amenity
           requirements:
                a. Bay doors. Buildings must have bay doors in which a secure transport vehicle can enter for
                     delivery.
                b. Canopy. Buildings must have a canopy or decorative awning over the main entrance to the
                     building.
                c. Lighting. There shall be ornamental lighting on the exterior of the building at all ingress and egress
                     doors. There shall also be at least one decorative street lamp with banner brackets every 30 feet
                     of linear road frontage. The Zoning Administrator may require these lamps to be located off-site
                     within the overlay district to create a cohesive look for the district.
                d. Landscaping plan. Decorative landscaping shall be provided with irrigation. All new construction
                     projects shall require underground sprinkling. Please see Part G, Landscaping Requirements.
                e. Street furniture/amenities. There shall be at least one bench, bike rack, trash can or bus shelter
                     located on site. The Zoning Administrator may require any of these over another to keep a
                     diversified look throughout the district. Properties that cannot meet these requirements because
                     of site conditions may allow the Zoning Administrator to locate these amenities anywhere within
                     the district or within 500 feet of its boundaries.
                f. Carbon filtration system. The building shall be equipped with an activated carbon filtration
                     system for odor control and be maintained in working order.
        3. Waste Disposal Plan. A plan must be approved for the disposal of waste, chemicals and unused plant
           material.
        4. Security. There must be a security presence in place on the property at all times, either by licensed security
           guard(s) and/or security cameras. A floor plan with security details is required.
C. Provisioning Center, Retailer, Microbusiness and Designated Consumption Establishment Requirements:


    1. Hours. Provisioning Centers may operate between the hours 8 am and 8 pm.


        Provisioning Centers, Retailers and Microbusinesses and Designated Consumption Establishments may
        operate between the hours 8 am and 12 pm.



    2. Signage. Signage shall be limited to one sign, no larger than 25 square feet and shall not use the word
       marihuana/marijuana, cannabis or any other word or phrase which would depict marihuana/marijuana;
       nor may pictures of a leaf or leaves, green cross or any other rendering which would depict
       marihuana/marijuana be displayed on a sign or any part of the building. Windows shall remain free and
       clear of all advertising.


    3. Building and Site Amenities. All Provisioning Centers, Retailers, Microbusinesses and Designated
       Consummation Establishments must meet the following amenity requirements:
            a. Bay doors. Buildings must have bay doors in which a secure transport vehicle can enter for
                delivery.
            b. Canopy. Buildings must have a canopy or decorative awning over the main entrance to the
                building.
            c. Security shutters. The interior of all windows shall require security shutters that give the
                appearance of shutters or window shades. Metal bars and gates are prohibited.
            d. Lighting. There shall be ornamental lighting on the exterior of the building at all ingress and egress
                doors. There shall also be at least one decorative street lamp with banner brackets every 30 feet
                of lineal road frontage. The Zoning Administrator may require these lamps to be located off-site
                within the overlay district to create a cohesive look for the district.
            e. Landscaping plan. Decorative landscaping shall be provided with irrigation. All new construction
                projects shall require underground sprinkling. Please see Part G, Landscaping Requirements.
            f. Street furniture/amenities. There shall be at least one bench, bike rack, trash can or bus shelter
                located on site. The Zoning Administrator may require any of these over another to keep a
                diversified look throughout the district. Properties that cannot meet these requirements because
                of site conditions may allow the Zoning Administrator to locate these amenities anywhere within
                the district or within 500 feet of its boundaries.
            g. Carbon filtration system. The building shall be equipped with an activated carbon filtration
                system for odor control and be maintained in working order.


    4. Indoor Activities. All activities of a provisioning center shall be conducted within the structure and out of
       public view. Walk-up and drive thru windows are not permitted.


    5. Security. There must be a security presence in place on the property at all times, either by licensed security
       guard(s) and/or security cameras. A floor plan with security details is required.
D. Safety Compliance Facility Requirements:


    1. Indoor Activities. All activities of a marihuana safety compliance facility shall be conducted within the
       structure and out of public view.
    2. Building and Site Amenities. All Safety Compliance Facilities must meet the following amenity
       requirements:
            a. Canopy. Buildings must have a canopy or decorative awning over the main entrance to the
                building.
            b. Lighting. Ornamental lighting is required on the exterior of the building at all ingress and egress
                doors. There shall also be at least one decorative street lamp with banner brackets every 30 feet
                of lineal road frontage. The Zoning Administrator may require these lamps to be located off-site
                within the overlay district to create a cohesive look for the district.
            c. Landscaping Plan. Decorative landscaping shall be provided and all landscaping shall be irrigated.
                All new construction projects shall require underground sprinkling. Please see Part G, Landscaping
                Requirements.
            d. Street furniture/amenities. There shall be at least one bench, bike rack, trash can or bus shelter
                located on site. The Zoning Administrator may require any of these over another to keep a
                diversified look throughout the district. Properties that cannot meet these requirements because
                of site conditions may allow the Zoning Administrator to locate these amenities anywhere within
                the district or within 500 feet of its boundaries.


    3. Security. There must be a security presence in place on the property at all times, either by licensed security
       guard(s) and/or security cameras. A floor plan with security details is required.


    4. Chemical waste and plant disposal plan. A list of all chemicals used in testing and how they will be disposed
       of must be provided. The plan must also show how marihuana plants and products will be disposed.


E. Secure Transporter Requirements:


    1. Storage. Marihuana and supplies, materials or money shall not be kept in any secure transport vehicle
       overnight. Outdoor storage, excluding transport vehicles is prohibited.


    2. Building and Site Amenities. All Secure Transporter buildings must meet the following amenity
       requirements:
            a. Canopy. Buildings must have a canopy or decorative awning over the main entrance to the
                building.
            b. Lighting. Ornamental lighting is required on the exterior of the building at all ingress and egress
                doors. There shall also be at least one decorative street lamp with banner brackets every 30 feet
                of lineal road frontage. The Zoning Administrator may require these lamps to be located off-site
                within the overlay district to create a cohesive look for the district.
            c. Landscaping Plan. Decorative landscaping shall be provided and all landscaping shall be irrigated.
                All new construction projects shall require underground sprinkling. Please see Part G, Landscaping
                Requirements.
                 d. Street furniture/amenities. There shall be at least one bench, bike rack, trash can or bus shelter
                    located on site. The Zoning Administrator may require any of these over another to keep a
                    diversified look throughout the district. Properties that cannot meet these requirements because
                    of site conditions may allow the Zoning Administrator to locate these amenities anywhere within
                    the district or within 500 feet of its boundaries.


        3. Security. There must be a security presence in place on the property at all times, either by licensed security
           guard(s) and/or security cameras. A floor plan with security details is required.


   F. Temporary Marihuana Event Requirements:


        1. Temporary Marihuana Events may be held within the allowed area for Recreational Marihuana Facilities,
           including parking lots and the public right-of-way, with the issuance of all necessary local and state permits.


   G. Landscaping Requirements:


        1. All required front setbacks shall be landscaped with a minimum of two canopy or shade trees, four understory
             or evergreen trees and four shrubs, for each 30 lineal feet of road frontage. Access ways from public rights-
             of-way through required landscape strips shall be permitted, but such access ways shall not be subtracted from
             the lineal dimension used to determine the minimum number of trees and shrubs required.
        2. All terraces (area between street and sidewalk) shall be landscaped with a minimum of one canopy tree for
             each 20 lineal feet of road frontage.
Properties that cannot meet these landscaping requirements because of site conditions may allow the Zoning
Administrator to locate the required landscaping anywhere within the overlay district or within 500 feet of its
boundaries. Required understory trees, evergreen trees and shrubs may be replaced with canopy trees within the
terrace at a 1:1 ratio.
                                                CITY OF MUSKEGON

                                          MUSKEGON COUNTY, MICHIGAN

                                               ORDINANCE NO._____


An ordinance to amend Section 2330 of the zoning ordinance to amend the Medical Marihuana Facilities Overlay District
to include Recreational Marihuana facilities, pursuant to the City’s Regulatory Marihuana Facilities Ordinance.


THE CITY COMMISSION OF THE CITY OF MUSKEGON HEREBY ORDAINS:

That Section 2330, the Medical Marihuana Facilities Overlay District is hereby amended and renamed the Marihuana
        Facilities Licensing Overlay District and now allows provisions for Recreational Marihuana Facilities.


This ordinance adopted:



Ayes:______________________________________________________________



Nayes:_____________________________________________________________



Adoption Date:



Effective Date:



First Reading:



Second Reading:



                                                       CITY OF MUSKEGON



                                                       By: _________________________________

                                                               Ann Meisch, MMC, City Clerk
                                                 CERTIFICATE


         The undersigned, being the duly qualified clerk of the City of Muskegon, Muskegon County, Michigan,
does hereby certify that the foregoing is a true and complete copy of an ordinance adopted by the City
Commission of the City of Muskegon, at a regular meeting of the City Commission on the 24th day of
September, 2019, at which meeting a quorum was present and remained throughout, and that the original of
said ordinance is on file in the records of the City of Muskegon. I further certify that the meeting was
conducted and public notice was given pursuant to and in full compliance with the Michigan Zoning Enabling
Act, Public Acts of Michigan No. 33 of 2006, and that minutes were kept and will be or have been made
available as required thereby.



DATED: ___________________, 2019.          __________________________________________

                                                   Ann Meisch, MMC

                                                   Clerk, City of Muskegon




Publish: Notice of Adoption to be published once within ten (10) days of final adoption.
                                                                  CITY OF MUSKEGON

                                                                 NOTICE OF ADOPTION


Please take notice that on September 24, 2019, the City Commission of the City of Muskegon adopted an ordinance to
amend Section 2330 of the zoning ordinance to include recreational marihuana facilties within the current overlay
district.

         Copies of the ordinance may be viewed and purchased at reasonable cost at the Office of the City Clerk in
the City Hall, 933 Terrace Street, Muskegon, Michigan, during regular business hours.



This ordinance amendment is effective ten days from the date of this publication.



Published ____________________, 2019.                                CITY OF MUSKEGON



                                                                                By _________________________________

                                                                                            Ann Meisch, MMC

                                                                                            City Clerk



---------------------------------------------------------------------------------------------------------------------



PUBLISH ONCE WITHIN TEN (10) DAYS OF FINAL PASSAGE.



Account No. 101-80400-5354
                                                                                                                                                     MC




                                                                           SIXTH
                                                               SEVENTH
                                                PARK
         SEAWAY
                        LAKETON                                          B-4                   LAKETON
                                                                                                                                                    LAKETON



                  I-2                                                                                                                               OSR
                                                               I-2                                         R-1               ALPHA




                                                                                    COMMERCE
                                      R-1




                                                                                                                 JEFFERSON
                                                                          SIXTH




                                                                                                   FIFTH
                                                                                                                                                    HOLBROOK
                                                                              B-2                  HOLBROOK
                                                                                                                                           B-4
                             TEMPLE




                                                                                                                                                      R-1




                                                                                                                                 SANFORD
                                                                                                           I-1
                                            PARK




                                                                                                                                             PECK
                     YOUNG

                                                                                                 MUSKEGON HEIGHTS
                                            MUSKEGON HEIGHTS




                                                                                               PROPOSED MMFLA & RECREATIONAL DISTRICT

                                                                                    B-4                                    GENERAL BUSINESS
                     I-1                                                            B-2
                                                                                    I-1
                                                                                                           CONVENIENCE COMPARISON BUSINESS
                                                                                                                            LIGHT INDUSTRIAL
SEAWAY




                                                                                    I-2                                  GENERAL INDUSTRIAL
                                                                                    MC                                         MEDICAL CARE
                                                                                    OSR                               OPEN SPACE RECREATION
                                                                                    R-1                            SINGLE-FAMILY RESIDENTIAL


                  MUSKEGON HEIGHTS

Top of Page


Sign up for City of Muskegon Emails