Approved Agreements and Contracts 2024/10/22 Additional Construction Engineering Services for Adelaide Pointe

View the PDF version Google Docs PDF Viewer

                         Agenda Item Review Form
                         Muskegon City Commission

Commission Meeting Date: October 22, 2024            Title: Additional construction engineering services
                                                     for Adelaide Pointe


Submitted by: Todd Myers, Deputy Director of         Department: Public Works
Public Works


Brief Summary:
Staff is requesting authorization to approve Contract Amendment No. | in the amount of $83,080 with
Eng. Engineering & Surveying for additional construction engineering services related to Adelaide
Pointe.


Detailed Summary & Background:
Eng. Engineering & Surveying was hired by the City to provide construction inspection services and
collect as-constructed documentation on the city's behalf for the infrastructure that is likely to
become public such as watermain, sanitary sewer and roadways, including a sanitary pump station.

Many aspects of this project have been somewhat fluid in nature with multiple changes to the utility
and roadway layout, modifications to the project schedule, multiple underground contractors,
numerous onsite meetings to evaluate conditions, etc. Efforts were also needed to accommodate
developer requests to meet intermediate milestones for events, a restaurant opening, boating
events, etc. All of these factors resulted in additional construction engineering and administration
costs. Eng. has requested this amendment to cover the additional costs associated with their work.
 Staff recommends these additional services be approved, and commends Eng. for their efforts as an
invaluable partner to the City in making sure the public's interests are represented on site during this
crucial project.


Goal/Focus Area/Action Item Addressed:


Key Focus Areas:
Progress toward completion of ongoing economic development projects

Goal/Action Item:
2027 Goal ?: Economic Development Housing and Business - Progress toward new and ongoing
economic development projects


Amount Requested:                                    Budgeted Item:
$83,080.00                                            Yes            No      |X|   N/A

Fund(s) or Account(s):                               Budget Amendment Needed:
Sewer (590) 14%, Water (591) 20% & Local Streets      Yes     Xx | No       N/A
(203) 66%


Recommended Motion:
To authorize staff to approve Contract Amendment No. | in the amount of $83,080 with Eng.
Engineering & Surveying for additional construction engineering services related to Adelaide Pointe.

Approvals:                                          Guest(s} Invited / Presenting:

Immediate Division
                                                     No
Head

Information
Technology

Other Division Heads

Communication

 Legal Review
                                            4063 Grand Oak Drive      16930 Robbins Road       2311 East Beltline Avenue SE
                                            Suite A109                Suite 105                Suite 201
                                oO           Lansing, MI 48911        Grand Haven, MI 49417    Grand Rapids, MI 49546
Engineering & Surveying *                    517.887.1100             616.743.7070             616.743.3020




           October 11, 2024



           Mr. Dan VanderHeide, PE, Director
           Department of Public Works
           City of Muskegon
           1350 Keating Ave.
           Muskegon, MI 49442

                             RE:     — Contract Amendment No. 1
                                       Adelaide Pointe Utility & Roadway Extension
                                       Public Improvements


           Dear Mr. VanderHeide:


           As we discussed, this letter is a request for a contract amendment to include additional plan review,
           construction engineering services, and expenses for the referenced project. The additional scope of work
           includes additional construction engineering to oversee multiple construction crews throughout  'the site
           working to complete the Adelaide Pointe Utility & Roadway Extension public improvements which are still
           on-going.



           The effort also involved ongoing plan reviews due to extensive changes to the drawings and specifications
           was significant and not originally included within our original proposal. The additional plan reviews also
           required the plotting of new construction drawings on countless occasions for our inspectors and City staff
           to ensure the correct plans were being utilized by on-site inspectors and personnel during construction.

           Our original proposal for construction duration was based upon a sole inspector for an assumed 60-week
           construction duration at 50-hours per week which was originally intended for a multi-phased development
           approach. The construction inspection, administration, and engineering supervision hours were based upon
           these assumptions as requested in the original requests for proposal. The request for contract amendment
           is being requested primarily due to the presence of multiple crews from Terra Contractors and Redline
           Excavating, including subconsultants, throughout the site working on public improvements simultaneously
           necessitating multiple construction observers.

           The original construction budget was exceeded during our services through the end of April 2024. Although
           the General Contractor is not willing to provide a schedule to completion, based on our best estimates, we
           anticipate 10 additional weeks of construction timeframe to complete the remaining public utility and roadway
           improvements with the following breakdown of additional fees:

                      Plan Reviews, Meetings, & Expenses:           $25,000
                      Additional Construction Inspection:           $46,000
                      Additional Construction Administration:       § 7,200
                      Additional Engineering Supervision:           $ 4,880

                                                       TOTAL:       $83,080.00

           The contract amendment, if approved, would adjust our contract amount from $306,250 to $389,330.




                                                                                                 Prides Passions Performance»
                                        4063 Grand Oak Drive     16930 Robbins Road        2311 East Beltline Avenue SE
                                        Suite A109               Suite 105                 Suite 201
                                        Lansing, MI 48911        Grand Haven, MI 49417     Grand Rapids, MI 49546
Englncering & Surveying                 517.887.1100             616.743.7070              616.743.3020
www.enadotcom



          Thank you for your consideration of this request. If you need any additional information or documentation
          to support this request, please let us know.

           lf this request meets with your approval, please sign and date it where indicated below to authorize the
           contract amendment and return it to our office.

           Sincerely,

           Eng,., Inc.



           GD Pevint
           Ryan C. McEnhill, PE
           President




            Proposed Contract Amendment accepted by the City of Muskegon:


                l ad. HLe———                                     doe 29° EF
            Authorized Signature                                Date


                                                                  Derry Dikector of Peveie Werks
           sapenermenh                                                  '                       .


              lod PAYERS
            Printed Name                                        Title




                                                                                               Prides Passions Performance

Go to the top of the page.


Sign up for City of Muskegon Emails